VERIFICATION METHODS
- BV1
- Structural Reliability
- Complies
with BP1.1
& BP1.2
- CV1
- Both complies
with CP2 (a) (iii)
- CV2
- Spreed of Fire
- DV1
- Access & egress
- Complies with
DP3 (f) & (g)
for wire
- EV4.1
- Emergency Lighting
- Complies with
EP4.1
- FV1
- Water Proofing
- Complies with
FP1.4
- FV4.1
- Indoor Air Quality
- Complies with
FP4.3, FP4.4 (a)
& Table FV4.1
- FV4.2
- Indoor Air Quality for Carpaks
- Complies with
FP4.3, 4.4(a) &
Table FV4.2
- FV5.1
- Sound Transmissons
- Complies with FP5.1
& FP5.3. Determiand
under AS/NZ1276.1
or ISO717.1/.2
- JV1
- JV2
- JV3
- Verification using a
referance building
- Compliance with JP1
- Left blank
- Left blank