Zusammenfassung der Ressource
Testing, Administration and Automation
Activities
- Planificación y preparación de pruebas
- Planificación de exámenes: objetivos, estrategias y técnicas
- Modelos de prueba y casos de prueba
- Preparación y gestión de la suite de pruebas
- Preparación del procedimiento de prueba
- Ejecución de la prueba, control del resultado y medición
- Medida de prueba
- Actividades, gente y gestión
- Automatización de prueba
- Planificación y preparación de pruebas
- The planning and preparation of tests is the most important activity in the process of generic tests for
systematic tests based on formal models
- Planificación de exámenes: objetivos, estrategias y técnicas
- Establish objectives and determine a general testing strategy
- If the software is complete or almost complete, then the previous quality focused on the correction
- General objectives and goals Objects to be tested and the specific
focus
- Modelos de prueba y casos de prueba.
- Identification of information sources and data
collection
- Analysis and initial construction of the model
- Validation of the model and incremental improvement
- Preparación y gestión de la suite de pruebas
- The collection of individual test cases that will run in a test sequence until it stops Reuse of test cases for
previous versions of the same product.
- sc - scenario class (scenario class) -- sn - scenario number (stage number) -- vn - variation number with a
particular scenario (number of variation with a particular scenario)
- Preparación del procedimiento de prueba
- Dependencies between individual test cases
- Sequences to avoid accidents
- Sequencing related to the diagnosis of problems
- Natural grouping of test cases
- Execution of the test, control of the result and measurement
- Assignment of time and test resources
- Verify test results and identify system failures.
- Medida de prueba
- Observed faults must be recorded and traced to their resolution
- Detailed information on fault observations and related activities for problem diagnosis and defect fixation
- Actividades, gente y gestión
- PeTesting teams: Organization and management
- Testers and test equipment can be organized into several different structures, but basically following a horizontal or vertical model
- A vertical model would be organized around a product
- A horizontal model, a test equipment performs a type of test for
many different products within the organization.
- Good knowledge of technical tests and processes
- Automatización de prueba
- Specific needs and potential for authorization;
- Selection of existing test tools, if available
- Possibility and cost of building specific test automation tools
- Availability of user training for these tools and necessary time / effor
- General cost, including the costs of acquiring tools, support, training and use
- Impact on resources, schedule and project management.