SAB9#48_Validate_scope
Anmerkungen:
- The Validate Scope process actually involves frequent, planned meetings with the customer or sponsor to gain formal acceptance of deliverables during project monitoring and controlling.
- Requirements documentation
- Traceability matrix
- Deliverables
Anmerkungen:
- These are verified
deliverables, which
means they’ve been
through Perform
Quality Control.
- Work performance data
Anmerkungen:
- As per the PMBOK Guide, the work performance data is “the raw observations and measurements identified during activities performed to carry out the project work; e.g. actual cost, actual duration, and percent of work physically completed.”
- Group decisionmaking
techniques
- Once the stakeholders have inspected the deliverables,
they’ll need to decide whether or not the deliverables
can be accepted
- This is where the stakeholders actually look closely at the
what the team did and make sure that every single piece
of work was completed.
- Verified deliverables
- If the team did the work right, then the stakeholders will
formally accept the deliverables (which means they do it in
writing).
- Change requests
- Project document
updates
- Work performance
information
Anmerkungen:
- As per the PMBOK Guide, the work performance information is “the performance data collected from various controlling processes, analyzed in context and integrated based on relationships across areas; e.g. status of deliverables, and forecasted estimates to complete, etc.”
- Relationship between validate scope and control quality