SAB9#47_Controlling_Scope
  1. I have to do if there is a change in project scope ?
    1. variance analysis.
      1. This tool is the difference analysis between the baseline and the actual work, serves to determine if the plan needs to be corrected. If so, then recommended corrective action, and disseminate through the recommendation a change control
      2. The goal of Control Scope is updating the scope, plan, baseline, and WBS info
        1. This process will tell us if we are right or not, regarding the planned scope and if we are controlling the changes that appear in the project
          Zusammenfassung anzeigen Zusammenfassung ausblenden

          ähnlicher Inhalt

          Vollkostenrechnung –Teilkostenrechnung/Deck.
          etsab1982
          soziale Ungleichheit
          Melanie Najm
          Sozialpsychologie
          jtefert
          The American Dream
          barbara91
          BKF C95 (Fragen der Ziffern 1a, 1b)
          Harald Koenig
          A1 Negation (nicht oder kein?)
          Anna Kania
          Molekulare Genetik
          Gökhan Yesilyayla
          Vetie Pharma 2016
          E. König
          Vetie Geflügel 2017
          Johanna Müller
          Vetie - Berufsrecht 2020 (Matrikel 15)
          Jana r