Zusammenfassung der Ressource
IAS 11 Construction Contracts
- Fixed Price
- Cost Plus
- Conflict between
- Prudence
Anmerkungen:
- Prudence would require that no income or profits are anticipated until realised
- Matching
Anmerkungen:
- Matching requires that costs are matched to the income they generate in the same period
- Fair presentation
Anmerkungen:
- The income statement should be a fair presentation of an entity's position therefore matching wins
- Contracts for more than one year
Anmerkungen:
- watch out for this, just because the word construction is used does not mean it constitutes a construction contract under IAS 11
- Contract Revenue
- Reasonable Certainty
Anmerkungen:
- where income cannot be estimated with reasonable certainty, the income statement must still reflect the activity for the period and as such revenue is matched against cost showing no profit or loss
Payments on account DO NOT represent the revenue figure
- Proportion of Work Done
Anmerkungen:
- Work is certified by professional surveyors.
- Specific points
- Profitable Contracts
Anmerkungen:
- Contract profit is usually recognised based on the percentage of work completed and the cost of sales becomes the balancing figure
- Cost of Sale
Anmerkungen:
- Crucial Exam point, calculated as a balancing figure