Erstellt von miguelabascal
vor mehr als 11 Jahre
|
||
Project Scope Management includes the
5.1 Plan Scope Management
5.2 Collect Requirements
5.3 Define Scope
5.4 Create WBS
5.5 Validate Scope
5.6 Control Scope
Product scope
Project scope
The scope management plan is
The development of the scope management
plan and the detailing of the project scope begin with
The project charter is
The scope management plan is
The requirements management plan is a
Requirements include
An interview is a
Alternatives generation is
The WBS is
work packages
A work package can be used to
Decomposition is a
The work package is
The WBS dictionary is a
The WBS is finalized by
The Validate Scope process differs from the Control Quality process in
The uncontrolled
expansion to product or project scope without adjustments to time, cost, and resources is referred to
Variance analysis is a
Product scope is another way to
The project scope is
The scope management plan essentially contains 3 parts:
The scope management process:
Delphi Technique
Group decision-making, different ways: