Which of the following statement about composite structure diagram element are correct?

Wähle eine oder mehr der folgenden:

  • Ports are modeled as small squares

  • Ports appears on the boundary of an object

  • Collaboration element is represented by a rectangle

  • Collaboration occurrences show instances of collaboration

Erklärung

Frage 2 von 40

1

Which of the following statements are true about the Subsystem?

Wähle eine oder mehr der folgenden:

  • Subsystems are smaller systems within a large system

  • A subsystem realizes one or more interfaces. Which define the behaviour it can perform

  • It may be represented as a UML packagcustosche or a set of operations

Erklärung

Frage 3 von 40

1

Which of the following situation , aggregation may be appropriate?
1. An object is physically composed of other objects.
2. An object is logical collection of other object.
3. An object can physically contain other objects.

Wähle eine der folgenden:

  • 1,2

  • 2,3

  • 1,3

  • 1,2,3

Erklärung

Frage 4 von 40

1

A_________ is represented as a task of zero duration showing an important achievement

Wähle eine der folgenden:

  • Milestone

  • Schedule

  • Project Phase

  • Tracker

Erklärung

Frage 5 von 40

1

By default, MS Project 2010 accrues resource costs ______________

Wähle eine der folgenden:

  • On a prorated basis

  • At the start of the project

  • At the end of the project task

  • As soon as the specific task starts in the project

Erklärung

Frage 6 von 40

1

In Ms project 2010, project managers can use the _________ field in the Resource sheet to designate resources with estimated rates or costs that update with actual rates as the project progresses

Wähle eine der folgenden:

  • Material

  • Code

  • Work

  • Resource

Erklärung

Frage 7 von 40

1

By default, all tasks in MS Project are ____________

Wähle eine der folgenden:

  • Fixed units tasks

  • Fixed duration tasks

  • Fixed work tasks

Erklärung

Frage 8 von 40

1

Increasing the number of resources of a task will __________ the duration and decreasing the resources will _________ the duration of the task

Wähle eine der folgenden:

  • Increase, Decreases

  • Decreases, Decreases

  • Decreases, Increase

  • Increase, Increase

Erklärung

Frage 9 von 40

1

Which of the following task types MS Project dose not considered as effort – driven tasks by default?

Wähle eine oder mehr der folgenden:

  • Fixed duration

  • Fixed work

  • Fixed units

  • Fixed time

Erklärung

Frage 10 von 40

1

MS Project 2010 comes with a unique feature of saving a project baseline data up to _________ times during the project life cycle

Wähle eine der folgenden:

  • 6

  • 10

  • 11

  • 15

Erklärung

Frage 11 von 40

1

Which of the following are elements of the custom groups?

Wähle eine oder mehr der folgenden:

  • Field type

  • Field name

  • Order

  • Field group

Erklärung

Frage 12 von 40

1

Which of the following leveling order delays or splits the task with the highest ID number in the project?

Wähle eine der folgenden:

  • Standard

  • ID only

  • Priority

  • Priority, Standard

Erklärung

Frage 13 von 40

1

Which of the following tracking method is useful if managers want to present in their weekly status meeting. the work hours and costs put in during that week?

Wähle eine der folgenden:

  • Task-total

  • Task-time phased

  • Assignment-total

  • Assignment-timephased

Erklärung

Frage 14 von 40

1

Cost performance is the difference between earned value and ____________

Wähle eine der folgenden:

  • Total value

  • Planned value

  • Actual cost

  • Project

Erklärung

Frage 15 von 40

1

By default, Gantt Charts in MS Project following a _______ and________ color for the taskbars

Wähle eine oder mehr der folgenden:

  • Green

  • Blue

  • Orange

  • Red

Erklärung

Frage 16 von 40

1

___________ produces information reliably grounded in the observed behaviour of a system

Wähle eine der folgenden:

  • Walkthroughs

  • Verification

  • Validation

  • Testing

Erklärung

Frage 17 von 40

1

________ produces value indirectly through information about valuable system behaviors.

Wähle eine der folgenden:

  • Testing

  • Walkthroughs

  • Validation

  • Verification

Erklärung

Frage 18 von 40

1

Performing a test is a _________activity

Wähle eine der folgenden:

  • Physical

  • Logical

  • Technical

  • Non-technical

Erklärung

Frage 19 von 40

1

Which of the statements about testing principles is true?

Wähle eine der folgenden:

  • Testing resources are limited

  • It is impossible to test everything

  • Testing is based on the design created.

  • Testing begins after the modules are integrated

Erklärung

Frage 20 von 40

1

Testing is based on ___________

Wähle eine der folgenden:

  • Design team requirements

  • User requirements

  • Design outputs

  • Code developed

Erklärung

Frage 21 von 40

1

Identify the measurement areas of Motorola Quality Policy for Software Development
(QPSD).

Wähle eine oder mehr der folgenden:

  • Delivered defects and delivered defects per size

  • Total effectiveness throughout the process

  • Estimation accuracy

  • Decrease software defect density

Erklärung

Frage 22 von 40

1

How can users enter the task information in the MS Project?

Wähle eine oder mehr der folgenden:

  • Using the Gantt table

  • Importing tasks from Excel or Outlook

  • Importing tasks from Word document or project table

  • Using the Task information dialog box via the Gantt Chart view

Erklärung

Frage 23 von 40

1

In which of the following situation, any two tasks can become a predecessor-successor pair?

Wähle eine oder mehr der folgenden:

  • When they both auto scheduled.

  • When they have a timing relationship between them.

  • When they share resources between them.

  • One cannot Start before another finishes

Erklärung

Frage 24 von 40

1

Which of the following diagram is a pictorial representation of a system’s functions? Functions from part of various processes that are executed for a system.

Wähle eine der folgenden:

  • Structured Analysis

  • Dataflow Diagram

  • Graph designing

Erklärung

Frage 25 von 40

1

The project size can be measured by using the Program Complexity Method.

Wähle eine der folgenden:

  • True

  • False

Erklärung

Frage 26 von 40

1

Which of the following helps us to find answers to questions related to data processing applications such as identifying the primary data object to be processed by the system, the composition of each data object and the attributes which describe the object?

Wähle eine der folgenden:

  • Data Modeling

  • System Elements

  • Data Object or Entities

Erklärung

Frage 27 von 40

1

Attributes define the properties of a data object. It may serve which of the following purpose?

Wähle eine der folgenden:

  • Name an instance of the data object.

  • Describe the instance.

  • Make references to another instance in another table.

  • All of the above.

Erklärung

Frage 28 von 40

1

Relationships can be bi-directional. Data object, attributes and relationships from the basic elements of data modelling and provide the basis for understanding the information domain of a problem.

Wähle eine der folgenden:

  • True

  • False

Erklärung

Frage 29 von 40

1

__________ IS THE SPECIFICATION OF THE NUMBER OF OCCURRENCES OF ONE OBJECT THAT CAN BE RELATED TO NUMBER OF OCCURRENCES OF ANOTHER OBJECT.

Wähle eine der folgenden:

  • MODALITY

  • CARDINALITY

  • ENTITY

Erklärung

Frage 30 von 40

1

The term __________ can be applied to a person, place ,thing ,object or event.

Wähle eine der folgenden:

  • Modality

  • Cardinality

  • Entity

Erklärung

Frage 31 von 40

1

Bubbles within a Data Flow Diagram are used to represent data stores.

Wähle eine der folgenden:

  • True

  • False

Erklärung

Frage 32 von 40

1

Which of the following is an organized listing of all data elements that are pertinent to the system with precise, rigorous, definitions so that both user and system analyst will have a common understanding of inputs, outputs ,components of stores and intermediate calculations?

Wähle eine der folgenden:

  • Control Flow

  • Data Dictionary

  • Cardinality

Erklärung

Frage 33 von 40

1

An Entity- Relationship diagram identifies a number of components such as objects, attributes relationships and various type-indicators.

Wähle eine der folgenden:

  • True

  • False

Erklärung

Frage 34 von 40

1

Which of the following defines the relationship among the major structural elements of the program?

Wähle eine der folgenden:

  • Component-level design

  • Interface design

  • Architectural design

Erklärung

Frage 35 von 40

1

Which of the following describes how software communicates with system that interoperate within it and with people who use it?

Wähle eine der folgenden:

  • Component-level design

  • Interface design

  • Architectural design

Erklärung

Frage 36 von 40

1

The _________ diagram is a form of activity diagram in which the nodes represent interaction diagram.

Wähle eine der folgenden:

  • Differential Overview

  • Interaction Overview

  • Partial Overview

  • Activity Overview

Erklärung

Frage 37 von 40

1

The ________ diagram shows the internal structure of a class, component or collaboration, including its interaction points with other parts of the system.

Wähle eine der folgenden:

  • Complex Structure

  • Medium Internal

  • Composite Structure

  • Definition Structure

Erklärung

Frage 38 von 40

1

The __________ diagram is composed only of packages and the dependencies between them

Wähle eine der folgenden:

  • Namespace

  • Activity

  • Package

  • Use-case

Erklärung

Frage 39 von 40

1

Which of the following statements about the use-case model are correct?

Wähle eine oder mehr der folgenden:

  • The Use-Case model only consists of actors.

  • The Use-Case model allows users to validate the fact that the system will become what they expect.

  • The Use-Case model only consist of use-cases.

  • The Use-Case model serves as a contract between customers, users, and system developers.

Erklärung

Frage 40 von 40

1

Which of the following are types of project calendars in MS Project 2010?

Wähle eine oder mehr der folgenden:

  • Basic Calendar

  • Standard Calendar

  • Task Calendar

  • Resource Calendar

Erklärung