S Exame Preparation

Frage 1 von 79

1

What transaction code in SAP Solution Manager is used to set up project documentation standards?

Wähle eine der folgenden:

  • SOLAR_PROJECT_ADMIN

  • SOLAR01

  • SOLAR02

  • SOLUTION_DIRECTORY

Erklärung

Frage 2 von 79

1

In which work stream of the ASAP methodology do you find the Agile specific tasks?

Wähle eine der folgenden:

  • Value Management work stream

  • Project Management work stream

  • Business Process Management work stream

  • Application Lifecycle Management work stream

Erklärung

Frage 3 von 79

1

You are preparing the Testing Policy deliverable. An outline of key elements of the testing methodology that the project will use as guiding principles going forward. In which project phase do you execute this work?

Wähle eine der folgenden:

  • Realization

  • Business Blueprint

  • Final Preparation

  • Project Preparation

Erklärung

Frage 4 von 79

1

You are performing a testing assessment that will help identify approaches and suggestions to assist in enhancing current testing processes. which deliverable in the Project Preparation phase will deal with this activity?

Wähle eine der folgenden:

  • Project and Operational Standards

  • Failover Environment

  • Prepare Testing Policy

  • Approved Integration Test

Erklärung

Frage 5 von 79

1

Which Organizational Change [Management (OCM) tasks belong to the Organizational Alignment deliverable in the Realization phase?
Note: There are 3 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • Refine and Execute Communication Plan

  • Conduct Sounding Board and Pulse Checks

  • E. Execute Role Mapping and Transition Planning

  • Conduct Production Support Readiness Check

  • Conduct Organizational Change management Readiness Check

Erklärung

Frage 6 von 79

1

Which accelerators from the ASAP Roadmap do you leverage to complete the Phase Closure and Sign-Off Phase Deliverables?
Note: There are 2 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • Project Quality Gate Scorecard template

  • Project Setup Checklist Sample

  • Phase Closure Report template

  • On-Boarding Document template

Erklärung

Frage 7 von 79

1

In the Project Preparation phase data quality analysis is initiated. which accelerator in the Data Migration Approach and Strategy deliverable is used to capture the baseline for data quality?

Wähle eine der folgenden:

  • Data Migration workshop Findings template

  • Data Migration Approach and Strategy template

  • Data Audit Results Report template

  • Data Migration Scoping Questionnaire template

Erklärung

Frage 8 von 79

1

Your team is starting to deploy an SAP Support Package and implement a functional enhancement in the productive environment. The team uses SAP Solution Manager to run the project. Which project type will you use to set up this project in SAP Solution Manager?

Wähle eine der folgenden:

  • maintenance project

  • Implementation project

  • Template project

  • Safeguarding project

Erklärung

Frage 9 von 79

1

What are the remaining business process management related deliverables for the project team after they complete the Solution Validation deliverable in the Business Blueprint phase?
Note: There are 3 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • Configuration Documentation

  • Business Solution Design for Business Objects

  • Visualization

  • Business Process Procedures

  • E. Detailed Design

Erklärung

Frage 10 von 79

1

What implementation content assets are provided through the Business Process Repository (BPR)?
Note: There are 3 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • Industry-specific benchmarks within the value determination

  • Transactions to execute business scenarios

  • Scenario documentation and business process descriptions

  • System infrastructure maps for hardware sizing

  • Configuration support documents and references to the Implementation Guide (IMG}

Erklärung

Frage 11 von 79

1

You are using ASAP to prepare a clear definition of roles and responsibilities in your project in the form of a responsibility assignment matrix. Which attribute on task level of the ASAP roadmap will help you to build a responsibility assignment matrix?

Wähle eine der folgenden:

  • Q-Gate Acceptance Criteria

  • Description

  • Work Stream

  • Accountable Role

Erklärung

Frage 12 von 79

1

What are the key.r concepts of the SAP blueprint approach?
Note: There are 3 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • Configuration management

  • Value realization

  • Business process management

  • Acceleration techniques

  • Test management

Erklärung

Frage 13 von 79

1

What do you need to do in SAP Solution Manager to convert an implementation project to a solution?
Note: There are 2 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • Transfer the project content into the solution directory.

  • Transfer business scenarios from the project to the Business Process Repository.

  • Release all opened transports into the production environment.

  • Set the project status to Closed.

Erklärung

Frage 14 von 79

1

What is the SAP tool set for the solution demo approach?
Note: There are 3 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • Proof of vision supported through SAP Application Visualization by iRise

  • Technical solution design

  • Proof of concept by value prototyping

  • OCM roadmap

  • Predefined SAP solutions (rapid deployment solutions

Erklärung

Frage 15 von 79

1

How do you access the SAP Modelling Handbook?

Wähle eine der folgenden:

  • As wild-pages on the SAP Community Network (SCN)

  • As part of the documentation available on the SAP Help Portal

  • As an Adobe PDF on the SAP public web site

  • As a book published by SAP PRESS

Erklärung

Frage 16 von 79

1

Which of the following tasks need to be completed successfully.r to complete the Production Cutover deliverable?
Note: There are 3 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • Finalize cutover plan.

  • Execute multiple cutover simulations.

  • Perform People Readiness Assessment.

  • Conduct Project Management Review service.

  • Obtain Production Data Load Sign-off.

Erklärung

Frage 17 von 79

1

What tasks in the Business Blueprint phase do you execute to define the Organizational Change management (OCM) communication plan?
Note: There are 2 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • Define communication strategy.

  • Define value argumentation and key messages.

  • Define project organization.

  • Refine acceptance criteria.

Erklärung

Frage 18 von 79

1

What is the purpose of the Value Realization deliverable?

Wähle eine der folgenden:

  • Value Realization establishes sustainable mechanisms to monitor and control the predefined KPls and PPls of the to-be process.

  • Value Realization focuses on the technical optimization of business processes and alignment of all aspects of an organization.

  • Value Realization ensures an optimized SAP solution operation by providing applicable content for setting up operations.

  • Value Realization provides proactive procedures to minimize the impact of critical situations.

Erklärung

Frage 19 von 79

1

Which template do you use to describe the solution for identified gaps during Blueprinting?

Wähle eine der folgenden:

  • Functional Specification template.

  • Gap Analysis Findings template.

  • Business Process Map template.

  • Technical Specification template.

Erklärung

Frage 20 von 79

1

What are the attributes available in ASAP on deliverable level?
Note: There are 2 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • Accelerators

  • Work Stream Assignment

  • Milestone

  • Accountable Role

Erklärung

Frage 21 von 79

1

When do you update the project management plan?

Wähle eine der folgenden:

  • Only at the beginning of the project as project baseline

  • Once in each project phase alter phase kickoff

  • Alter project closing to reflect lessons learned

  • Alter an agreed upon change to areas covered by the plan

Erklärung

Frage 22 von 79

1

The scope of data migration is moving data from the legacy systems into the SAP target structures. What is the main focus of the work related to data migration in the Project Preparation phase?

Wähle eine der folgenden:

  • To plan and educate customers on the overall migration strategy and approach

  • To develop customer training materials for the migration

  • To map data objects on field level from source to target systems

  • To define detailed design of migration routines

Erklärung

Frage 23 von 79

1

What methodology improvements have been introduced in ASAP 8?
Note: There are 2 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • Agile built into core methodology

  • Prescriptive delivery approach

  • Project management aligned with PMI PMEJOK

  • ASAP Business Add-ons

Erklärung

Frage 24 von 79

1

which work streams consistently have deliverables in ASAP phases. from Project Preparation to Go Live Support?

Wähle eine der folgenden:

  • Project management
    Technical Solution Management
    Test Management.

  • Project management
    Organizational Change management
    Data management.

  • Project management
    Business Process management
    Technical Solution management.

  • Project management
    Organizational Change management
    Training.

Erklärung

Frage 25 von 79

1

When does the Organizational Change management (OCM) team conduct the End User Acceptance Survey?

Wähle eine der folgenden:

  • During the Go Live Support

  • During the Integration Test

  • During the User Acceptance Test

  • During the Blueprint Acceptance

Erklärung

Frage 26 von 79

1

Which of the following testing deliverables are produced during the Realization phase?
Note: There are 3 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • Approved Integration Test

  • Approved Technical System Tests

  • Scenario Test #1 - n

  • Approved User Acceptance Test

  • Testing Strategy

Erklärung

Frage 27 von 79

1

"You are a project manager and you have completed the following phase start-up deliverables:
Allocate Resources
Perform Kickoff Meeting
Prepare Team On-boarding Document
In which phase of the project are you?

"

Wähle eine der folgenden:

  • Operate

  • Project Preparation

  • Business Blueprint

  • Realization

Erklärung

Frage 28 von 79

1

Which of the following are characteristics of the Service Desk functionality in SAP Solution Manager?

Wähle eine oder mehr der folgenden:

  • Service Desk is fully integrated with SAP back-end systems.

  • Service Desk is the recommended tool for tracking end-user support messages.

  • Service Desk is limited to SAP application errors and issues.

  • Service Desk is only used to process test messages during an implementation project.

Erklärung

Frage 29 von 79

1

Which deliverable will provide the framework for detailed planning of the tasks required for testing the solution prior to go-live?

Wähle eine der folgenden:

  • Project and Operational Standards

  • High-Level Functional Test Plan

  • Testing Strategy

  • Approved User Acceptance Test

Erklärung

Frage 30 von 79

1

Which of the following ASAP deliverables are only applicable when the ASAP project is managed in an agile way?
Note: There are 2 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • Sprint Initiation

  • Release Closing

  • Project management Plan

  • Visualization

Erklärung

Frage 31 von 79

1

Which of the following tasks provides an impartial analysis of all aspects of the solution design across all relevant design perspectives?

Wähle eine der folgenden:

  • Conduct Design Review Service.

  • Perform SAP Going Live Check.

  • Conduct Project Management Review Service.

  • Conduct Technical Integration Check Service.

Erklärung

Frage 32 von 79

1

You are a project manager in large implementation project that is just about to start transitioning to the production environment. Your order management team lead indicates that several warehouse employees do not seem to be prepared for go live. You are unsure if you should proceed with the go live activities as planned. What Organizational Change Management (OCM} deliverable do you use to assess whether the organization is ready for the go-live and the new system?

Wähle eine der folgenden:

  • OCM Road Show

  • Pre go-live end-user training

  • Production cutover

  • Organizational and Production Support Readiness Check

Erklärung

Frage 33 von 79

1

Which of the following tools are recommended to perform the SAP solution string test?
Note: There are 3 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • SAP Application Visualization by iRise

  • Service Desk

  • SAP Enterprise Modelling by Software AG

  • SAP Test Acceleration and Optimization

  • SAP Quality Centre by HP

Erklärung

Frage 34 von 79

1

In your project you decide to leverage the concept of Solution Validation. What is the sequence of the iterative solution demo approach?

Wähle eine der folgenden:

  • Visualize - Listen - Accept - Verify and Engage - Reference - Complement

  • Listen and Engage - Reference - Visualize - Complement - Verify and Accept

  • Reference - Visualize - Listen and Engage - Complement - Verify and Accept

  • Reference - Listen and Engage - Complement - Visualize - Verify and Accept

Erklärung

Frage 35 von 79

1

What are the main characteristics of the event-driven process chain (EPC) modelling type
Note: There are 3 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • Events follow the naming convention of an object and a past participle.

  • Every process has a distinct beginning and end, both marked by an event.

  • Functions represent a process step and are expressed through a verb in infinitive format and the name of the object.

  • Event-driven process chains are static models.

  • E. This modelling type shows an overview of the business areas and their assigned process groups.

Erklärung

Frage 36 von 79

1

Besides the request for instant value. Customers need an early confirmation that requirements can be met. Which acceleration techniques of ASAP help to provide an early confirmation?

Note: There are 2 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • Iterative build cycles

  • Solution demo approach for Blueprinting

  • Sustainability management

  • Service optimization

Erklärung

Frage 37 von 79

1

"During the Realization phase, the project team performs organizational alignment activities. These include a review of:
• Changes to positions and responsibilities due to redesigned business processes
• Changing nature of relationships between business units
• Changes in the organizational culture or behavior
• New skills, not only SAP or technology related
Which task in the Organizational Change Management work stream describes this work?
"




Wähle eine der folgenden:

  • Execute role mapping and transition planning.

  • Conduct sounding boards.

  • Execute communication plan.

  • Administer End-User Acceptance Survey.

Erklärung

Frage 38 von 79

1

"You, as a project manager, need to communicate the following information to the project team:
• Industry and customer environment
• Project scope
• Deliverables
• Timeline
• Project behaviour and logistics
• Methods and tools
Which ASAP Roadmap task do you execute?




Wähle eine der folgenden:

  • Create project schedule.

  • Create improvement roadmap.

  • Prepare team on-boarding document.

  • Create scope management plan.

Erklärung

Frage 39 von 79

1

Your team is in the Business Blueprint phase and uses SAP Solution Manager to capture requirements and to design the solution. The team has identified several issues that need to be tracked. Which SAP Solution Manager function do you use to manage these issues?

Wähle eine der folgenden:

  • Business Process Repository

  • Solution directory

  • Project administration

  • Service Desk

Erklärung

Frage 40 von 79

1

What toolset will you use to assess and validate completeness and acceptance of key deliverables?

Wähle eine der folgenden:

  • Project Schedule

  • Project Quality Gate Scorecard

  • Roles and Responsibilities Matrix

  • Project Management Plan

Erklärung

Frage 41 von 79

1

Project Team Training provides all team members with a phase-based learning path that allows them to acquire the skills and knowledge needed to complete a project successfully. According to ASAP, what is the recommended learning path?

Wähle eine der folgenden:

  • Project Team Training in Blueprint
    Project Team Training in Realization
    Knowledge Transfer in Go Live Support

  • Project Team Training prior to Project Preparation
    Project Team Training in Realization
    Knowledge Transfer in Operate

  • Project Team Training in Project Preparation
    Project Team Training in Realization
    Knowledge Transfer in Final Preparation

  • Project Team Training in Project Preparation
    Project Team Training in Blueprint
    Knowledge Transfer in Realization

Erklärung

Frage 42 von 79

1

The purpose of archiving data is to provide a method to check, remove, and store data that has completed its life cycle. Data that meets the check criteria of the data retention rules can be archived. What are the main criteria for defining data retention rules?


Note: There are 2 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • Customer's business process requirements

  • Legal and statutory requirements

  • Customer's internal network bandwidth between database and GUI

  • Main memory capacity of customer's application server

Erklärung

Frage 43 von 79

1

How do you ensure that the benefits of your project are accurately reflected in the Business Blueprint?
Note: There are 3 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • Perform a value audit to monitor and control the implementation of key process changes.

  • Monitor financial key performance indicators (KPIs) on an ongoing basis.

  • Associate Process Performance Indicators (PPIs) with processes.

  • Decompose a value map and associate it with the solution and process design.

  • E. Translate value drivers and value enablers into business process requirements.

Erklärung

Frage 44 von 79

1

What is the main purpose of the Project Scope Statement?

Wähle eine der folgenden:

  • To provide input to the business case.

  • To freeze the project scope and prevent any future scope changes.

  • To clearly and explicitly define the deliverables of the project.

  • To document the functional specifications that will be further refined in the Business Blueprint

Erklärung

Frage 45 von 79

1

Which of the following deliverables of the Realization phase are relevant for functional business scenario and process testing?

Note: There are 3 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • Business Process Procedure

  • Failover Environment

  • Approved Technical System Tests

  • Approved User Acceptance Test

  • E. Scenario Test #1 – n

Erklärung

Frage 46 von 79

1

When do you set up the Business Process Hierarchy in SAP Solution Manager?

Wähle eine der folgenden:

  • Prior to project initiation as a solution map

  • During Project Preparation. and it is further refined during the Business Blueprint

  • Prior to SAP Best Practices activation

  • During the Business Blueprint. and it is further refined during Realization

Erklärung

Frage 47 von 79

1

You are using diagnostics in SAP Solution Manager to perform root cause analysis during the Operate phase. Which of the following end-to-end functions support root cause analysis?

Note: There are 3 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • End-to-end change analysis

  • End-to-end trace analysis

  • End-to-end process monitoring

  • End-to-end workload analysis

  • E. End-to-end test analysis

Erklärung

Frage 48 von 79

1

You are in the Project Preparation phase and want to refine the implementation scope. One part of the implementation scope focuses on the business processes affected by the project. Why is it important to define a Business Process Hierarchy?


Note: There are 3 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • It is needed to manage external stakeholder expectations.

  • It helps you to organize and execute Blueprinting workshops.

  • It allows you to capture deliverables such as requirements and process flows in a structured way.

  • It is the binding structure for value delivery.

  • E. It helps you to develop a detailed cost management plan.

Erklärung

Frage 49 von 79

1

You are in the Final Preparation phase and are approaching go live. How do you communicate the exact timing, steps, and logistics for cutover to production to stakeholders?

Wähle eine der folgenden:

  • Share the Final Cutover Plan with them.

  • Present the details during the Go Live Support Phase Kick Off Meeting.

  • Invite them to Go Live Simulations.

  • Communicate the details during the Business Readiness Check.

Erklärung

Frage 50 von 79

1

How do you initiate status reporting on assigned documents in SAP Solution Manager?

Wähle eine der folgenden:

  • Maintain the authors name at the process level in the Business Process Hierarchy.

  • Assign the document to an owner in the SAP Solution Manager task list

  • Assign a Service Desk message to each document.

  • Assign the responsible project team member to the document on the Documentation tab.

Erklärung

Frage 51 von 79

1

How do you assure that business objects are properly defined during Blueprinting?
Note: There are 2 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • Associate business objects with the corresponding Business Process Hierarchy level in SAP Solution Manager.

  • Capture requirements for each business object using the requirements template.

  • Capture business objects in a chart and map them to organizational needs.

  • Document business objects as part of the Enterprise Services Repository.

Erklärung

Frage 52 von 79

1

Which of the following are tasks of the Technical Operations and Handover Plan deliverable in the Realization phase

Note: There are 3 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • Establish support processes.

  • Conduct Technical Integration Check service.

  • Execute performance tests.

  • Validate support centre (help desk} staffing strategy.

  • E. Set up business process monitoring.

Erklärung

Frage 53 von 79

1

How can you access the ASAP 8 roadmap?

Wähle eine der folgenden:

  • SAP Service Marketplace.

  • ASAP C

  • SAP Partner Portal.

  • SAP Help Portal.

Erklärung

Frage 54 von 79

1

What is the purpose of visualizations during Blueprinting?
Note: There are 2 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • To substitute functional specifications

  • To verify solution design as early.r as possible

  • To serve as a collaboration tool for feedback and requirement solicitation

  • To model business processes following Business Process Modelling Notation

Erklärung

Frage 55 von 79

1

You are in the early stage of setting up an implementation project. What key components of project governance do you need to establish and agree with your project sponsor?

Note: There are 2 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • SAP Solution Manager system

  • Roles and responsibilities

  • Project schedule

  • Project organizational structure

Erklärung

Frage 56 von 79

1

Which IT management areas are covered by change central management?
Note: There are 3 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • Quality gate management

  • Rest cause analysis

  • Business Process Monitoring

  • Change request management

  • Change deployment

Erklärung

Frage 57 von 79

1

In the Realization phase, you have completed the End UserTraining Delivery Enabled deliverable. What is the outcome of your work?

Note: There are 3 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • Knowledge Support Strategy

  • Checklist of training system accessibility and PC requirements

  • Trained end users

  • Communications about the training to end users

  • Schedule of the end-user training

Erklärung

Frage 58 von 79

1

Where in the Business Blueprint phase do you find the Project Quality Scorecard template that helps you control that the project team has approached Blueprinting in a consistent way?

Wähle eine der folgenden:

  • In the Organizational Change Management work stream deliverable Change Impact Analysis.

  • In the project management work-stream deliverable Phase Closure and Sign-Off Phase Deliverables.

  • In the business process management work stream deliverable Business Solution Design for Business Objects.

  • In the project management work-stream deliverable Phase Initiation.

Erklärung

Frage 59 von 79

1

Why is the UserAcceptance Test (UAT) important for project success?
Note: There are 3 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • It proves that the implemented solution works as designed.

  • It proves that key users have gained hands-on experience with the new solution.

  • It sets the entry criteria for the end-user training.

  • It helps to gain end-user acceptance of the software system.

  • It demonstrates that the production environment meets system performance requirements.

Erklärung

Frage 60 von 79

1

How does the Test workbench in SAP Solution Manager support manual testing?
Note: There are 3 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • Provides individual test packages

  • Provides direct access to test systems

  • Integrates with SAP Enterprise Services Repository

  • Allows creation of tester notes

  • Supports online chat between testers

Erklärung

Frage 61 von 79

1

Which accelerator do you leverage in the Go Live Support phase to document that the project has met the business requirements and the project objectives?

Wähle eine der folgenden:

  • Project Closeout Report template

  • Lessons Learned template

  • End User Acceptance Survey

  • Project Quality Gate Scorecard template

Erklärung

Frage 62 von 79

1

Which activities belong to the preparation for production cutover?
Note: There are 2 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • Multiple cutover simulations

  • Communication coordination rehearsals

  • Conduct project management review

  • Project quality gate sign-off

Erklärung

Frage 63 von 79

1

The project manager plans the quality assurance for the project and considers using the Project Management Review service as an impartial analysis. When is the service delivered according to ASAP?

Wähle eine der folgenden:

  • After each project phase. delivered in five steps

  • During the Operate phase. once the project is completed

  • In the Final Preparation phase. delivered by the project manager

  • During the realization phase. after each project quality gate is completed

Erklärung

Frage 64 von 79

1

What is the expected outcome of core configuration in the Realization phase?

Wähle eine der folgenden:

  • The baseline of the SAP system is configured and ready for further development of enhancements.

  • The SAP system is ready for the final configuration cycle testing.

  • The scenario configuration documentation is 100% completed and ready for sign-off.

  • Master data test cases are documented and test results are available prior to final data load.

Erklärung

Frage 65 von 79

1

Which of the following are characteristics of IT governance in the context ofASAP methodology?
Note: There are 3 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • governance is planned, defined, and set up during the implementation project.

  • governance is optimized during the Operate phase.

  • governance is set up right alter production cutover in the early stages of the Operate phase.

  • governance is defined and completely put in place in the Project Preparation phase, as part of the project standards.

  • governance is covered by ASAP methodology.

Erklärung

Frage 66 von 79

1

What do you call the prioritized delta list that is a result of the Business Blueprint phase in Agile ASAP?

Wähle eine der folgenden:

  • Project change log

  • Project risk list

  • Project issue log

  • Project backlog

Erklärung

Frage 67 von 79

1

What is the key,r task of the Data Management team during Production Cutover?

Wähle eine der folgenden:

  • To communicate the final cutover plan to stakeholders

  • To own and manage the cutover checklist

  • To obtain production data load sign-off

  • To conduct the Data Quality Readiness Check

Erklärung

Frage 68 von 79

1

You are a project manager in the Business Blueprint phase of an implementation project. Your project team members have advised you that there is an influential stakeholder who is likely to resist the process changes introduced by the project. Which approach, recommended in ASAP, will help you to understand the attitude of this stakeholder and the level of impact this stakeholder has on your project?


You are a project manager in the Business Blueprint phase of an implementation project. Your project team members have advised you that there is an influential stakeholder who is likely to resist the process changes introduced by the project. Which approach, recommended in ASAP, will help you to understand the attitude of this stakeholder and the level of impact this stakeholder has on your project?



Wähle eine der folgenden:

  • Preparation of project standards

  • Communication planning

  • Stakeholder analysis

  • Roles and responsibilities mapping

Erklärung

Frage 69 von 79

1

Which of the following project and operational standards are defined by the Technical Solution Management work stream during the Project Preparation phase?

Note: There are 3 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • Determine Technical Operations

  • Determine Business Process Operations

  • Determine Change Control Management Procedure

  • Determine Application Incident Management Procedure

  • Determine Test Management Procedure

Erklärung

Frage 70 von 79

1

which Application Lifecycle Management (ALM) process deals with the collection and storage of detailed information about business processes and system settings?

Wähle eine der folgenden:

  • Business Process Operations

  • Solution Documentation

  • Solution Implementation

  • Test management

Erklärung

Frage 71 von 79

1

which of the following are deliverables of the Technical Solution Management work stream in the Business Blueprint phase?

Note: There are 3 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • Technical Solution Design

  • Development Environment (DEV)

  • User Access and Security

  • Detailed Design - Configuration and Enhancements

  • Visualization

Erklärung

Frage 72 von 79

1

What are the four key lifecycle covered by ASAP?

Wähle eine der folgenden:

  • Project management lifecycle
    Solution management lifecycle
    Risk management lifecycle
    Technical management lifecycle

  • Value management lifecycle
    Project management lifecycle
    Knowledge management lifecycle
    Cost management lifecycle

  • Scope management lifecycle
    Project management lifecycle
    Quality management lifecycle
    Value management lifecycle

  • Process management lifecycle
    Value management lifecycle
    Project management lifecycle
    Application management lifecycle

Erklärung

Frage 73 von 79

1

Which are the tasks of the Visualization deliverable in ASAP?
Note: There are 3 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • Capture initial visualization requirements.

  • Define business organization structure.

  • Demo visualizations and solicit feedback (iterative).

  • Build visualization (iterative).

  • Define logical data model.

Erklärung

Frage 74 von 79

1

In the Business Blueprint Phase Kick-Off Meeting. The project sponsor asks about the benefits of the Learning Needs Analysis for their organization. Which of the following benefits of the Learning Needs Analysis can you outline to them?


Note: There are 3 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • It helps to identify training infrastructure deficiencies.

  • It helps to identify the correct timing for upgrading the current SAP solution.

  • It helps to drive user adoption and to educate the wider business community.

  • It helps to identify potential skill gaps in the organization.

  • It helps to identify the audience for Project Team Training.

Erklärung

Frage 75 von 79

1

What do you call ASAP documents and web links that support you in completing deliverables and tasks?

Wähle eine der folgenden:

  • Accelerators

  • ASAP Business Add-Ons

  • SAP Help

  • IMG objects

Erklärung

Frage 76 von 79

1

What detailed security requirements are implemented and tested in the Quality Assurance system as part of the System User Roles and Authorization Administration deliverable?

Note: There are 3 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • Network Level Security

  • Support Center Staffing

  • Encryption Methods

  • Roles and Authorizations

  • Business Process Monitoring

Erklärung

Frage 77 von 79

1

You are in the Project Preparation phase, and you start building a Project Team Training Strategy. What input do you need?

Note: There are 3 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • Location and logistics for the project team members

  • Roles set up in the development system

  • The training system environment

  • A list of prerequisite knowledge brought to the project by project team members

  • A list of project team members and individual responsibilities

Erklärung

Frage 78 von 79

1

ASAP introduces a modelling notation that contains modelling types. such as event-driven process chain (EPC) and value-added chain diagram (VACD). Where do you find the conventions of this modelling notation?

Wähle eine der folgenden:

  • SAP Modeling Handbook

  • SAP Solution Roadmaps

  • SAP Service Marketplace

  • SAP Business Process Repository

Erklärung

Frage 79 von 79

1

Which tasks in the Project and Operational Standards deliverable help to establish a customer framework to centrally document existing and new processes and IT tools?

Note: There are 2 correct answers to this question.

Wähle eine oder mehr der folgenden:

  • Determine solution documentation procedure.

  • Determine innovation management procedure.

  • Define solution landscape concept.

  • Determine maintenance management.

Erklärung