1

If a LEED project that is providing preferred parking for fuel efficient and low emitting vehicles has multiple parking lots, where should the preferred parking spaces be located?

Wähle eine der folgenden:

  • preferred parking spaces only need to be provided in one lot

  • preferred parking spaces only need to be located in the lot designated for visitors

  • preferred parking spaces only need to be provided in the lot designated for staff

  • preferred parking spaces must be distributed among all lots

Erklärung

Frage 2 von 92

1

Which LEED recognized strategy will require chain of custody documentation as proof of credit compliance?

Wähle eine der folgenden:

  • certified wood

  • rapidly renewable resources

  • recycled materials

  • regional materials

  • materials reuse

Erklärung

Frage 3 von 92

1

What is the greatest benefit of an integrative design process as it relates to a LEED project?

Wähle eine der folgenden:

  • educating the project owner

  • reducing project soft costs

  • meeting building codes

  • shortening the project schedule

  • capitalizing on credit synergies

Erklärung

Frage 4 von 92

1

How many years can an agricultural product grow or be raised to be considered as rapidly renewable by LEED?

Wähle eine der folgenden:

  • 10

  • 15

  • 20

  • 5

Erklärung

Frage 5 von 92

1

Which of the following strategies does not qualify as providing "preferred parking"?

Wähle eine der folgenden:

  • providing a space that is as close to the building as possible

  • providing a designated covered spot

  • offering a significant discount on parking passes

  • providing a guaranteed space in a lottery system

  • providing a randomly assigned parking space

Erklärung

Frage 6 von 92

1

When are CFC based refrigerants allowed to be used in a LEED project?

Wähle eine der folgenden:

  • if a CFC phase out is economically infeasible

  • if the refrigerant leakage rate is below 10% annually

  • in existing buildings

  • anytime

Erklärung

Frage 7 von 92

1

Which of the following is not a required design consideration for the recycling collection and storage area prerequisite?

Wähle eine der folgenden:

  • protection from the elements

  • collection truck access

  • appropriate signage

  • convenient location

Erklärung

Frage 8 von 92

1

A project team is using cotton insulation that is grown and manufactured 100 miles from the project site. What credit(s) will the use of this material count toward?

Wähle eine der folgenden:

  • rapidly renewable materials

  • recycled content

  • regional materials

  • recycled content and regional materials

  • rapidly renewable materials and regional materials

Erklärung

Frage 9 von 92

1

Which of the following project is considered to be a "soft cost"?

Wähle eine der folgenden:

  • the architect's fees

  • carpet

  • money paid to the brick mason for labor

  • the project's structural steel

  • landscaping costs

Erklärung

Frage 10 von 92

1

What is required as documentation for each and every prerequisite and credit in the LEED for BUilding Designa nd Construction Rating System?

Wähle eine der folgenden:

  • a project drawings

  • a required signatory

  • a letter template

  • photos

  • a project narrative

Erklärung

Frage 11 von 92

1

What is the minimum amount of pervious area a paving system must have to be considered "open grid"?

Wähle eine der folgenden:

  • 40%

  • 50%

  • 30%

  • 60%

  • 20%

Erklärung

Frage 12 von 92

1

Solar reflectance is roughly synonymous with what term?

Wähle eine der folgenden:

  • aquifer

  • glare

  • shielding

  • albedo

  • lumen

Erklärung

Frage 13 von 92

1

Which of the following is not considered to be a "basic service"?

Wähle eine der folgenden:

  • Parking lot

  • church

  • bank

  • beauty salon

  • grocery store

Erklärung

Frage 14 von 92

1

One of the most cost effective ways to ensure optimal ongoing energy performance is to ______?

Wähle eine der folgenden:

  • commission building systems

  • upgrade mechanical systems

  • maintain trees and landscaping features

  • install renewable energy systems

Erklärung

Frage 15 von 92

1

Which federal act has been adopted by many local jurisdictions and contains requirements for building accessibility?

Wähle eine der folgenden:

  • EPAct

  • ANSI

  • ADA

  • Civil Rights Act

  • ASHRAE

Erklärung

Frage 16 von 92

1

A project generates 100 tons of waste throughout construction. 50 tons are collected off site and sent to a sorting facility with a facility wide diversion rate of 60%. 40 tons are separated on site and sent directly to recyclers. The final 10 tons are incinerated off site. What percentage of waste does LEED consider to have been recycled?

Wähle eine der folgenden:

  • 40%

  • 50%

  • 80%

  • 70%

Erklärung

Frage 17 von 92

1

Which specific refrigerant has the highest global warming potential (GWP) of all the common refrigerants?

Wähle eine der folgenden:

  • HCFC-123

  • CFC-502

  • CFC-11

  • HFC-404A

  • HFC-23

Erklärung

Frage 18 von 92

1

A project team is considering pursuing an innovation in design credit for a strategy that will require a large capital expense. The team decides that it will implement the strategy only if the strategy will be eligible for an innovation in design credit. What steps should the team take to determine whether its strategy will be eligible for the credit?

Wähle eine der folgenden:

  • Research existing CIRs to see whether the strategy has been previously addressed

  • Draft a compelling narrative for the LEED submittal

  • Calculate the strategy's overall environmental impact and self evaluate whether it is significant

  • Check the LEED rating system

Erklärung

Frage 19 von 92

1

Which strategy supports improved indoor air quality?

Wähle eine der folgenden:

  • avoid the use of products with high carbon dioxide concentrations

  • use filters with a low minimum efficiency reporting value (MERV) rating

  • use materials with recycled content

  • design systems to deliver ample outside air

  • eliminate refrigerants with ozone depletion potential

  • use advanced framing techniques

Erklärung

Frage 20 von 92

1

A new high rise residential building should use what LEED rating system for certification?

Wähle eine der folgenden:

  • LEED for New Construction

  • LEED for Homes

  • LEED for Operations and Maintenance

  • LEED for Core and Shell

  • LEED for Interior Design and Construction

Erklärung

Frage 21 von 92

1

The regional priority credits for a project are based on what?

Wähle eine der folgenden:

  • The project's city

  • the project's state

  • the project's county

  • the project's zip code

Erklärung

Frage 22 von 92

1

What costing model should be used to demonstrate the true cost of sustainability strategies?

Wähle eine der folgenden:

  • simple payback

  • benefit analysis

  • return on investment

  • life cycle costing

Erklärung

Frage 23 von 92

1

What is the energy policy act used for in the LEED rating systems?

Wähle eine der folgenden:

  • to set indoor air quality requirements

  • to establish baseline building plumbing fixture performance

  • to establish baseline building energy performance

  • to set product VOC limits

Erklärung

Frage 24 von 92

1

What is the first step in a successful waste management policy?

Wähle eine der folgenden:

  • determine the embodied energy of the product

  • specify recyclable materials

  • recycle all possible construction materials

  • reduce the total quantity of waste

  • reuse existing materials

Erklärung

Frage 25 von 92

1

What is the first step a project team should consider when trying to save energy?

Wähle eine der folgenden:

  • install sub metering equipment

  • use onsite renewable energy

  • reduce energy demand

  • adopt energy efficient measures

Erklärung

Frage 26 von 92

1

What happens if USBC finds out that a project does not meet the minimum program requirements (MPRs)?

Wähle eine der folgenden:

  • the project's certification level is lowered by one level

  • the project must be resubmitted

  • certification can be revoked

  • a fine must be paid

Erklärung

Frage 27 von 92

1

The heat island effect may raise the temperature in an urban area by how many degrees above the temperature in nearby rural areas?

Wähle eine der folgenden:

  • 10

  • 8

  • 2

  • 6

  • 4

Erklärung

Frage 28 von 92

1

What percentage of the solid waste stream each year is attributable to construction and demolition of waste?

Wähle eine der folgenden:

  • 50%

  • 20%

  • 10%

  • 40%

  • 30%

Erklärung

Frage 29 von 92

1

What factor should a project team not consider when calculating life cycle costs?

Wähle eine der folgenden:

  • maintenance costs

  • operating costs

  • initial costs

  • life span

  • none of the above

Erklärung

Frage 30 von 92

1

Which of the following transportation methods does not count as public transportation for LEED purposes?

Wähle eine der folgenden:

  • subway system

  • campus shuttle or school bus system

  • bus

  • elevated rail system

  • taxi

Erklärung

Frage 31 von 92

1

Use of a dry urinal would decrease the fixture's water use form the Energy Policy Act baseline urinal water usage by how much?

Wähle eine der folgenden:

  • 1.6 GPF

  • 2.5 GPF

  • 0.5 GPF

  • 1.0 GPF

Erklärung

Frage 32 von 92

1

LEED defined regional materials as originating within ____ miles of the project site?

Wähle eine der folgenden:

  • 500

  • 700

  • 100

  • 250

Erklärung

Frage 33 von 92

1

Projects can identify which credits have regional priority by ____?

Wähle eine der folgenden:

  • Checking the USGBC website

  • researching locally pertinent environmental issues

  • calculating the net environmental impact

  • submitting a CIR

Erklärung

Frage 34 von 92

1

Which type of refrigerant has an essentially zero ozone depletion potential (ODP) but still has high global warming potential (GWP)?

Wähle eine der folgenden:

  • HCFCs

  • HFCs

  • CFCs

  • natural refrigerants

Erklärung

Frage 35 von 92

1

Which of the following is not a LEED accepted strategy for decreasing single rider, conventional automobile use?

Wähle eine der folgenden:

  • providing preferred parking for fuel efficient and low emitting vehicles

  • charging fees for parking

  • locating the project near mass transit

  • providing only the amount of parking required by the zoning code

  • providing bicycle storage and showers

Erklärung

Frage 36 von 92

1

A building material that is made from recycled soda bottles contains _____?

Wähle eine der folgenden:

  • pre-fabricated recycled content

  • post-industrial recycled content

  • pre-consumer content

  • post-consumer recycled content

Erklärung

Frage 37 von 92

1

Which LEED category has the most available LEED points?

Wähle eine der folgenden:

  • water efficiency

  • indoor environmental air quality

  • location and transportation

  • energy and atmosphere

  • sustainable sites

  • materials and resources

Erklärung

Frage 38 von 92

1

Which strategy is not effective in reducing potable water use for irrigation?

Wähle eine der folgenden:

  • mulching

  • rainwater harvesting

  • drip irrigation

  • spray irrigation

  • using native or adapted plants

Erklärung

Frage 39 von 92

1

What environmental problem is associated with CFC and HCFC use?

Wähle eine der folgenden:

  • soil erosion

  • ozone depletion

  • the heat island effect

  • water pollution

  • air pollution

Erklärung

Frage 40 von 92

1

Which of the following strategies would not be appropriate for mitigating the heat island effect potential of the parking lot of a large office building?

Wähle eine der folgenden:

  • use paving with a SRI of 35

  • place half of the parking underground

  • use open grid paving

  • use mature trees to shade 50% of the parking lot

  • plant seedling conifers to shade the parking

Erklärung

Frage 41 von 92

1

Which of the following is not a strategy for reducing stormwater runoff volume?

Wähle eine der folgenden:

  • installing a vegetated roof

  • rainwater harvesting

  • minimizing the building footprint

  • increasing impervious paving

  • using bio retention

Erklärung

Frage 42 von 92

1

Which of the following types of vehicles does not qualify as an alternative fuel vehicle for the purposes of LEED?

Wähle eine der folgenden:

  • Diesel powered

  • ethanol pwered

  • hydrogen powered

  • electric powered

  • hybrid (gas-electric)

Erklärung

Frage 43 von 92

1

How many of the 110 available points in most of the rating systems are considered bonus points?

Wähle eine der folgenden:

  • 10

  • 20

  • 15

  • 5

Erklärung

Frage 44 von 92

1

Why should a project team aim to significantly exceed the established threshold of a LEED credit?

Wähle eine der folgenden:

  • to save the world

  • to be an overachiever

  • as a precaution against a credit being audited

  • to earn exemplary performance

Erklärung

Frage 45 von 92

1

What strategy is being used for a project design that orients windows to allow the building to be warm in the winter, stay cool in the summer and capture daylight?

Wähle eine der folgenden:

  • energy simulation modeling

  • high performance mechanical systems

  • passive design concepts

  • efficiencies of scale

Erklärung

Frage 46 von 92

1

Which type of system or equipment would not be a consumer of process water?

Wähle eine der folgenden:

  • dishwasher

  • cooling tower

  • domestic hot water heater

  • clothes washer

  • food steamer

Erklärung

Frage 47 von 92

1

What is one potential disadvantage of using comingled recycling as a part of a construction waste management plan?

Wähle eine der folgenden:

  • It is more difficult to document than site separated recycling

  • it may be more expensive than site separated recycling

  • it takes up more site area than site separated recycling

  • it may require a greater time investment from the project team

Erklärung

Frage 48 von 92

1

The CRI green label plus certification program certifies what type of building material?

Wähle eine der folgenden:

  • furniture

  • adhesives

  • wood products

  • paint

  • carpet

Erklärung

Frage 49 von 92

1

Which of the following is not an acceptable form of renewable energy under the LEED rating systems?

Wähle eine der folgenden:

  • low impact hydro-electricity

  • wind turbines

  • nuclear pwoer

  • geothermal

  • photovoltaic panels

Erklärung

Frage 50 von 92

1

Which type of refrigerant in general is the most efficient?

Wähle eine der folgenden:

  • HFCs

  • CFCs

  • Natural refrigerants

  • HCFCs

Erklärung

Frage 51 von 92

1

Which of the following is not required of an Innovation and design strategy?

Wähle eine der folgenden:

  • it must be a strategy not already covered in the LEED rating systems

  • it must be quantifiable

  • it must be cost effective

  • it must be repeatable by other projects

  • it must be comprehensive

Erklärung

Frage 52 von 92

1

Which of the following is not an approved strategy for minimizing the non-roof heat island effect?

Wähle eine der folgenden:

  • shading hardscape with photovoltaiv panels

  • placing parking underground

  • using paving materials with an SRI of 29 or higher

  • using asphalt for parking areas

  • using open grid paving

Erklärung

Frage 53 von 92

1

Which rating system has a required recertification process?

Wähle eine der folgenden:

  • Operations and Maintenance

  • Homes

  • Interior Design and Construction

  • Building Design and Construction

  • Neighborhood Development

Erklärung

Frage 54 von 92

1

If a project has 1 full time employee and 6 part time employees, what is the projects full time equivalent value (FTE)?

Wähle eine der folgenden:

  • 6

  • 3

  • 5

  • 7

  • 4

Erklärung

Frage 55 von 92

1

What is the best use for potable water?

Wähle eine der folgenden:

  • Drinking

  • cooling towers

  • toilet flushing

  • irrigation

  • swimming pools

Erklärung

Frage 56 von 92

1

What type of plant material is most appropriate for use on a green roof?

Wähle eine der folgenden:

  • annuals

  • cultivated plant species

  • native plants

  • trees and shrubs

Erklärung

Frage 57 von 92

1

Which type of water is not allowed to be used for irrigation purposes?

Wähle eine der folgenden:

  • Well water

  • gray water

  • captured rain water

  • potable water

  • black water

Erklärung

Frage 58 von 92

1

What is an appropriate use of the LEED logo?

Wähle eine der folgenden:

  • for a link to the website

  • by a project pursuing LEED certificaiton

  • on product packaging

  • to indicate an organization's USGBC membership

Erklärung

Frage 59 von 92

1

What is not a possible source of graywater?

Wähle eine der folgenden:

  • Washing machine

  • Toilets

  • Bathroom sink

  • showers

  • drinking fountain

Erklärung

Frage 60 von 92

1

What is true of the CIR process?

Wähle eine der folgenden:

  • CIRs can be submitted by anyone with a USGBC account

  • all projects must use CIRs

  • CIRs cost $220 each

  • a successful CIR can aware LEED points

Erklärung

Frage 61 von 92

1

Demand controlled ventilation is typically adjusted in response to___?

Wähle eine der folgenden:

  • VOC concentrations

  • a time schedule

  • occupant requests to the building operator

  • carbon dioxide concentraions

Erklärung

Frage 62 von 92

1

What sustainability concept can xeriscaping contribute to?

Wähle eine der folgenden:

  • reducing the heat island effect

  • certified wood

  • indoor air quality

  • construction waste management

  • water efficient irrigation

Erklärung

Frage 63 von 92

1

Which material below is not considered a rapidly renewable resource?

Wähle eine der folgenden:

  • bamboo

  • wood

  • cork

  • silk

  • straw

Erklärung

Frage 64 von 92

1

What is the best time to incorporate an integrative approach for a building project?

Wähle eine der folgenden:

  • design development

  • construction documents

  • construction

  • schematic design

  • predesign

Erklärung

Frage 65 von 92

1

Which of the following regulations is likely to be contained in zoning regulations? (pick 3)

Wähle eine oder mehr der folgenden:

  • landscaping regulations

  • stormwater management regulations

  • regulations on energy usage

  • open space requirements

  • parking space requirements

Erklärung

Frage 66 von 92

1

Projects that achieve a projected water savings of at least ___ are eligible for an exemplary performance ID credit in addition to earning 4 points in WE indoor water use reduction.

Wähle eine der folgenden:

  • 55%

  • 40%

  • 45%

  • 50%

  • 35%

Erklärung

Frage 67 von 92

1

What are some other possible LEED certifications a project may be able to receive if it has already received LEED core and shell certification? (pick 2)

Wähle eine oder mehr der folgenden:

  • LEED for schools

  • LEED for new construction

  • LEED for operation and maintenance

  • LEED for Homes

  • LEED for commercial interiors

Erklärung

Frage 68 von 92

1

A fuel efficient vehicle must meet which requirement to qualify as low emission and fuel efficient vehicles?

Wähle eine der folgenden:

  • green label score of 30 or more

  • green label score of 45 or more

  • green e score of 25 or more

  • green seal score of 30 or more

  • green score of 45 or more

Erklärung

Frage 69 von 92

1

Which of the following products would be considered to contain post consumer recycled content that wuold contribute to the LEED credit for recycled content?

Wähle eine oder mehr der folgenden:

  • plumbing pipe made from recycled plastic components

  • steel beams made from used railroad ties

  • glass tiles made from glass broken during manufacturing

  • carpet made from recycled soda bottles

  • a countertop made from newspapers

Erklärung

Frage 70 von 92

1

During construction, if permanently installed air handlers are used, what is the minimum MERV rating for the filtration media needed to achieve IEQ credit: construction IAQ management plan?

Wähle eine der folgenden:

  • MERV 8

  • MERV 6

  • MERV 7

  • MERV 10

  • MERV 5

  • MERV 9

Erklärung

Frage 71 von 92

1

What 3 standards can be used to achieve EA credit 1 Optimize energy performance? (pick 3)

Wähle eine oder mehr der folgenden:

  • Advanced buildings benchmark

  • CBECS

  • ASHRAE 90.1-2010

  • ASHRAE 62.1-2010

  • ASHRAE advanced energy design guide

Erklärung

Frage 72 von 92

1

What may prevent pedestrian access to a community resource? (pick 3)

Wähle eine oder mehr der folgenden:

  • a parking lot

  • a public park

  • a freeway interchange

  • distance

  • a wall

Erklärung

Frage 73 von 92

1

Which of the following materials may not contribute to construction waste management strategies? (pick 2)

Wähle eine oder mehr der folgenden:

  • concrete

  • product packaging

  • scrap wood

  • asbestos floor tiles

  • land clearing debris

Erklärung

Frage 74 von 92

1

What does the construction activity pollution prevention plan aim to prevent? (pick 3)

Wähle eine oder mehr der folgenden:

  • carbon emissions

  • solid waste generation

  • erosion

  • airborne dust pollution

  • sedimentation

  • construction worker accidents

Erklärung

Frage 75 von 92

1

Which standards are used to establish what vehicles qualify as low emitting and fuel efficient vehicles?

Wähle eine der folgenden:

  • California air resources

  • green seal standard

  • american council for an energy efficient economy green book

  • green e prodcut

  • the greenguard certification program

Erklärung

Frage 76 von 92

1

The cost of LEED certification for new construction is based on which of the following?

Wähle eine der folgenden:

  • USGBC membership and project type

  • project size

  • project size and USGBC membership

  • USGBC membership

  • project size and project type

  • project type

Erklärung

Frage 77 von 92

1

What is the cost of submitting a CIR?

Wähle eine der folgenden:

  • 100

  • 0

  • 220

  • 500

  • 50

Erklärung

Frage 78 von 92

1

In addition to prohibiting smoking within the building, where is it also important to prohibit smoking to reduce occupant exposure to harmful airborne chemicals? (pick 2)

Wähle eine oder mehr der folgenden:

  • in covered parking spaces

  • in wooded areas

  • adjacent to building air intakes

  • near building entrances

Erklärung

Frage 79 von 92

1

Which of the following groups would be considered transient occupants? (pick 2)

Wähle eine oder mehr der folgenden:

  • college students

  • retail customers

  • office workers

  • factory workers

  • elementary school students

Erklärung

Frage 80 von 92

1

What happens after the construction submittal?

Wähle eine der folgenden:

  • the full application is ruled upon by USGBC

  • construction points are awarded

  • the design submittal

  • design and construction points are awarded

Erklärung

Frage 81 von 92

1

What types of water on a residential condo project could not be used to qualify for WE credit 1 outdoor water use reduction? (pick 2)

Wähle eine oder mehr der folgenden:

  • captured rainwater

  • laundry water

  • recycled waste water

  • public water, non potable

  • kitchen sink water

  • black water

Erklärung

Frage 82 von 92

1

What are the two primary benefits of using regional materials? (pick 2)

Wähle eine oder mehr der folgenden:

  • minimizing the impacts of transportation

  • reducing costs

  • assuring quality craftsmanship

  • supporting the local economy

Erklärung

Frage 83 von 92

1

At minimum, which of the following basic materials should a recycling program designed to meet the storage and collection of recyclables prerequisite accommodate? (pick 3)

Wähle eine oder mehr der folgenden:

  • glass

  • plastics

  • cardboard

  • bulbs

  • ink cartridges

Erklärung

Frage 84 von 92

1

How can a project purchase green power? pick 2

Wähle eine oder mehr der folgenden:

  • By purchasing green e certified RECs

  • by buying energy directly from nearby wind farm

  • through a program by the local utility company

  • by purchasing and installing solar panels

Erklärung

Frage 85 von 92

1

Which of the following projects would definitely not meet minimum program requirements?

Wähle eine oder mehr der folgenden:

  • 5,000 SF fire station

  • casino on a riverboat

  • a brand new elementary school

  • renovation/addition to large office building

  • temporary sports practice facility

Erklärung

Frage 86 von 92

1

What two specific types of refrigerants does the Montreal Protocol phase out the use of? pick 2

Wähle eine oder mehr der folgenden:

  • CFCs

  • HFCs

  • natural

  • HCFCs

Erklärung

Frage 87 von 92

1

Two primary sources of potable water:

Wähle eine oder mehr der folgenden:

  • private/public well

  • ocean

  • captured rainwater

  • lake or stream

  • municipal water systems

Erklärung

Frage 88 von 92

1

What are some useful strategies to achieve WE credit: outdoor water use reduction? pick 3

Wähle eine oder mehr der folgenden:

  • use bioswales

  • use drip irrigation

  • remove turf grass

  • implement mulching

  • create a sediment basin

Erklärung

Frage 89 von 92

1

Which approaches can be taken to achieve WE credit outdoor water use reduction? pick 3

Wähle eine oder mehr der folgenden:

  • avoid mulch around flower beds

  • irrigate shrubs

  • micro misters

  • irrigate with captured rain water

  • native plants

  • use only mono species

Erklärung

Frage 90 von 92

1

What are ways to reduce storm water runoff volume?

Wähle eine oder mehr der folgenden:

  • create retention ponds

  • impervious paving

  • slowing water run off rates

  • use high albedo roof covering

  • use smaller building footprint

  • install bioswales

Erklärung

Frage 91 von 92

1

Local codes and regulations may affect which of the following strategies? pick 2

Wähle eine oder mehr der folgenden:

  • purchasing green power

  • minimizing parking capacity

  • managing indoor air quality

  • construction waste management

  • use of rainwater for toilet flushing

Erklärung

Frage 92 von 92

1

What is reduced when a project uses reclaimed water in its cooling towers?

Wähle eine der folgenden:

  • process water use

  • irrigation water use

  • potable water use

  • nonpotable water use

  • indoor plumbing water use

Erklärung