B O
Quiz von , erstellt am more than 1 year ago

A Quiz for Scrum developers

1596
1
0
B O
Erstellt von B O vor etwa 8 Jahre
Schließen

Scrum Developer

Frage 1 von 30

1

What is pair programming?

Wähle eine der folgenden:

  • The Scrum Team is divided into several two-person Development Teams that consolidate work in a Scrum of Scrums.

  • A developer and a tester work together to write and test code.

  • Two programmers write code separately. A third programmer integrates the work.

  • Managers doing performance reviews by comparing one programmer's code to another's.

  • Two developers writing code together, providing constant peer review.

Erklärung

Frage 2 von 30

1

Which are benefits of Test Driven Development?

Wähle eine oder mehr der folgenden:

  • It improves quality and reduces bugs.

  • Which are benefits of Test Driven Development

  • It speeds the overall development process.

  • It promotes good design and separation of concerns.

Erklärung

Frage 3 von 30

1

You are on a Scrum Team that is enhancing an existing product. Which is the LEAST useful piece of documentation you want to have at your disposal?

Wähle eine der folgenden:

  • Well-structured and named code.

  • Detailed designs.

  • The full history of retrospective plans and lessons learned.

  • Acceptance tests.

Erklärung

Frage 4 von 30

1

Which describes the practice of expressing requirements as acceptance tests?

Wähle eine der folgenden:

  • Acceptance Test Driven Development

  • Object Driven Requirements Definition

  • Quality Oriented Requirements Definition

  • Regression Testing

Erklärung

Frage 5 von 30

1

What is code coverage?

Wähle eine der folgenden:

  • The number of developers that understand how the code works.

  • The percent of code in version control included in a build.

  • An insurance policy that covers the code for defects.

  • The degree to which the system under test has been exercised by tests.

Erklärung

Frage 6 von 30

1

When is a system's architecture decided?

Wähle eine der folgenden:

  • Whenever the assigned architect can join the Development Team.

  • It is designed along with the vision, before the first Sprint.

  • In the beginning of the project, during Sprint 0, when the groundwork is done.

  • Throughout the project, as understanding emerges and the Development Team learns more about the project.

Erklärung

Frage 7 von 30

1

What happens during Sprint 0?

Wähle eine der folgenden:

  • Requirements gathering, version control setup, and continuous integration setup.

  • Overall planning, base system architecture, base design, version control and continuous integration setup.

  • There is no such thing as Sprint 0.

  • Base system architecture and design.

  • Establish base system architecture and design, install version control and continuous integration setup.

Erklärung

Frage 8 von 30

1

What is test first development?

Wähle eine der folgenden:

  • Designing tests before satisfying them.

  • Having the tester in the Development Team write the test plans before coding.

  • Testing existing code before adding more code to it.

  • The continuous restructuring of software to retain flexibility.

Erklärung

Frage 9 von 30

1

Which are attributes of a good bug report (choose all that apply)?

Wähle eine oder mehr der folgenden:

  • Simple and repeatable reproduction steps.

  • Build or version where bug was found.

  • Screenshots or other pictures of bug in action when user interfaces are involved.

  • Clear title and proper grammar in report.

  • Expected results and observed results.

  • One bug per report.

Erklärung

Frage 10 von 30

1

When are testers and quality experts ideally included in a project?

Wähle eine der folgenden:

  • From the beginning and throughout all Sprints

  • After Sprint Review

  • When the product is feature complete

  • After developer handoff

Erklärung

Frage 11 von 30

1

Programmers and testers should not be included in refining Product Backlog items.

Wähle eins der folgenden:

  • WAHR
  • FALSCH

Erklärung

Frage 12 von 30

1

The definition of "Done" describes the work that must be completed for every Product Backlog item before it can be deemed releasable. What should the Development Team do when, during the Sprint, it finds out that a problem outside of their control blocks them from doing all this work?

Wähle eine der folgenden:

  • Complete the work that can be done on as much scope as possible and use the Sprint Review to plan the rest with the stakeholders.

  • Immediately raise the issue to the Scrum Master as an impediment.

  • Cancel the Sprint.

  • Complete the work that can be done on as much scope as possible and complete the rest during the "hardening" sprints at the end of the release.

  • Stop using Scrum.

Erklärung

Frage 13 von 30

1

Select four (4) desirable characteristics of a unit test.

Wähle eine oder mehr der folgenden:

  • Each test makes assertions about only one logical concept.

  • The test executes fast.

  • Each test is independent of other unit tests.

  • Code in each test is as small as possible.

  • They exercise the persistence layer of a solution.

Erklärung

Frage 14 von 30

1

What are two (2) reasons to automate the software build process?

Wähle eine oder mehr der folgenden:

  • To get feedback on changes to the code early and often.

  • Code reviews are much faster if you automate your build.

  • Automation improves the quality of software by making builds less error-prone.

  • You can't run automated tests without an automated build.

Erklärung

Frage 15 von 30

1

While changing software, you find a bug in a previously delivered piece of functionality. What should you do?

Wähle eine der folgenden:

  • Fix the bug if it is critical or easily fixed. Otherwise, put the new bug into the Product Backlog to be prioritized and fixed in an upcoming Sprint.

  • Stub out the code that caused the bug so it no longer occurs.

  • Revise the tests so that the bug no longer appears on the bug report.

  • Fix the bug.

Erklärung

Frage 16 von 30

1

Select two (2) benefits of Continuous Integration.

Wähle eine oder mehr der folgenden:

  • Causes team members to consider each other's work and context.

  • It eliminates bugs completely.

  • The build is executed once every night and at least once each weekend.

  • It leads to higher transparency and rapid feedback to the team.

Erklärung

Frage 17 von 30

1

Who is responsible for the system architecture of a product being developed using Scrum?

Wähle eine der folgenden:

  • The software architect.

  • The architect chosen by the Development Team.

  • The corporate architect.

  • The Development Team

Erklärung

Frage 18 von 30

1

Which of the following best describes Continuous Integration?

Wähle eine der folgenden:

  • A software development practice used by Integration Teams to create best practice branching and merging strategies.

  • A software development practice where members of a development team integrate and verify their work frequently, often multiple times each day, to detect integration errors as quickly as possible.

  • A software development practice where members of a development team all work on the same computer to ensure a common code base.

  • A software development practice that continuously integrates feedback from users into software design.

Erklärung

Frage 19 von 30

1

What are three advantages of Continuous Integration?

Wähle eine oder mehr der folgenden:

  • The software is generally kept in a buildable state.

  • Readability of code is improved.

  • Know immediately how a check-in affected the build.

  • Broken builds are detected quickly.

Erklärung

Frage 20 von 30

1

Select three (3) reasons why automated builds are important.

Wähle eine oder mehr der folgenden:

  • The build process is clearly defined and scripted, making it easy consistent and repeatable.

  • They allow frequent validation of the unit of software being worked on, ensuring it remains in a potentially shippable state.

  • They ensure your product remains bug free.

  • They eliminate the need for Build Engineers.

  • They support continuous integration.

Erklärung

Frage 21 von 30

1

What is a unit test?

Wähle eine der folgenden:

  • A test that isolates and verifies individual units of source code.

  • A technique for ensuring that units of co-dependent or clustered computers perform correctly.

  • A way in which units of programmers ensure their code works.

  • A way for the team to ensure that the system satisfies the user requirements.

Erklärung

Frage 22 von 30

1

Which are three attributes of a BAD bug report?

Wähle eine oder mehr der folgenden:

  • One bug per report.

  • Generic titles.

  • Assigning blame.

  • Vague statements or untested assumptions.

  • Simple and repeatable reproduction steps.

Erklärung

Frage 23 von 30

1

Which of the following are NOT metrics of code quality? (choose all that apply)

Wähle eine oder mehr der folgenden:

  • Cyclomatic complexity

  • Cycle time per feature

  • Class coupling

  • Depth of inheritance

  • Lines of Code

Erklärung

Frage 24 von 30

1

What are two (2) ways a Development Team can ensure a good application architecture?

Wähle eine oder mehr der folgenden:

  • A Development Team doesn't need an architecture model in Scrum and should focus on adding functionality. The architecture will come into place without fail as the Development Team adds functionality.

  • The Development Team should assign someone to the role of software architect whose job it is to make sure a consistent architecture is developed.

  • The Development Team plans some time each Sprint to discuss the architecture needed for the features planned in that Sprint.

  • The Development Team should have a set of guiding architecture principles that every Development Team member understands and follows when writing code.

  • The Development Team plans a Sprint 0 at the beginning of a project with the objective of developing an architecture model used during the following Sprints.

Erklärung

Frage 25 von 30

1

Who must be present at the Daily Scrum meeting?

Wähle eine der folgenden:

  • The Scrum Master and the Development Team

  • The entire Scrum Team (including PO and SM)

  • The Development Team

  • Anyone who wants to attend

  • No one is required, anyone who wishes to attend is welcome

Erklärung

Frage 26 von 30

1

Who writes tests in a Scrum Team?

Wähle eine der folgenden:

  • QA specialists

  • The Scrum Master

  • Coders

  • The Development Team

Erklärung

Frage 27 von 30

1

Should User Stories be part of the documentation generated by a Scrum project?

Wähle eine der folgenden:

  • Never.

  • Always.

  • If the architect requires it.

  • They must be provided to the Development Team as part of the user specifications documents.

  • If they are part of the Definition of "done".

Erklärung

Frage 28 von 30

1

When does the Development Team participate in Product Backlog refinement?

Wähle eine der folgenden:

  • Only during refinement meetings planned by the Product Owner.

  • Anytime during the Sprint.

  • As Part 1 of the Sprint Planning meeting.

  • Never. It is the sole responsibility of the Product Owner to refine the Product Backlog.

Erklärung

Frage 29 von 30

1

What is the value of refactoring code?

Wähle eine der folgenden:

  • To keep the code moving.

  • To make the software faster at runtime.

  • To improve readability and maintainability.

  • To have all code in a single file for easy printing and code reviews.

Erklärung

Frage 30 von 30

1

Which of the following describe an architecture spike?

Wähle eine der folgenden:

  • A small development activity to learn about technical elements of a proposed solution.

  • The result of an exhaustive architectural planning effort.

  • A decision made by a systems architect to settle disagreement within a Development Team.

  • A fundamental architectural problem found in an existing application.

Erklärung