Which of the following terms represents the form of heat removed from the refrigerant in the condenser of a refrigeration system?

Wähle eine der folgenden:

  • Latent heat of vaporization, Heat of compression, Superheat

  • Vaporization and compression

  • Vaporization

  • Thermodynamics

Erklärung

Frage 2 von 128

1

Heat which brings about a change in the physical state of a substance without a change in temperature, is called____.

Wähle eine der folgenden:

  • latent heat

  • specific heat

  • sensible heat

  • ambient heat

Erklärung

Frage 3 von 128

1

The degree to which the viscosity of an oil will change with a change in temperature is indicated by the_______.

Wähle eine der folgenden:

  • viscosity index

  • pour point

  • thermal change value

  • weight designation

Erklärung

Frage 4 von 128

1

Latent heat can be defined as the heat which must be added to a substance in order to change its_______.

Wähle eine der folgenden:

  • physical state

  • temperature

  • volume

  • pressure

Erklärung

Frage 5 von 128

1

It is a form of energy which crosses the boundary of a system during a change of state produced by a difference of temperature between the system and its surroundings.

Wähle eine der folgenden:

  • Heat

  • Kinetic energy

  • Potential energy

  • First Law of Thermodynamics

Erklärung

Frage 6 von 128

1

Heat may be transferred by __________.

Wähle eine der folgenden:

  • conduction, convection, and radiation

  • transmission, conduction, and radiation

  • transmission, conduction, and convection

Erklärung

Frage 7 von 128

1

The principle which states that "energy cannot be created nor be destroyed", is known as the law of _______.

Wähle eine der folgenden:

  • conservation of energy

  • impulse and momentum

  • action and reaction

  • Dalton's law

Erklärung

Frage 8 von 128

1

The purpose of end clearance on a diesel engine piston ring is to __________.

Wähle eine der folgenden:

  • prevent buckling and breaking of the ring as it expands

  • allow the combustion gases to press the ring down on the land

  • allow the combustion gases to get behind the ring and press it against the cylinder liner

  • aid in protecting the oil film

Erklärung

Frage 9 von 128

1

An impulse-reaction turbine is characterized by which of the following arrangements?

Wähle eine der folgenden:

  • Velocity-compounded stages followed by reaction blading.

  • Reaction blading followed by impulse diaphragms.

  • Stationary nozzles with impulse blading stages.

  • Reaction stages followed by velocity- compounded blading.

Erklärung

Frage 10 von 128

1

An increase in clearance between reaction blade tips and the turbine casing will result to_______________ .

Wähle eine der folgenden:

  • a decrease in rotor torque

  • an increase in rotor thrust load

  • an increase pressure drop across the blades

  • increase in rotor vibration

Erklärung

Frage 11 von 128

1

What is carried out whenever any repairs or renewals are made which could materially affect the safety and condition of the ship?

Wähle eine der folgenden:

  • Surveys

  • Inspections

  • Investigations

  • Audit and inspection

Erklärung

Frage 12 von 128

1

Classification society ship surveyors perform which of the following surveys?

Wähle eine der folgenden:

  • Examines accident damage

  • Ships registration surveys

  • Enforcement of ship safety standards

  • Surveys of foreign-going ships and local craft

Erklärung

Frage 13 von 128

1

How long is the survey cycle for all CMS items?

Wähle eine der folgenden:

  • Every five years

  • Once a year

  • Once every two years

  • Once every four years

Erklärung

Frage 14 von 128

1

What kind of survey is to be carried out after the vessel had been delivered to an owner?

Wähle eine der folgenden:

  • Annual survey

  • Intermediate survey

  • Special survey

  • Confirmatory Survey

Erklärung

Frage 15 von 128

1

In reference to air conditioning, when air attains the maximum amount of moisture it can hold at a specific temperature, it is said to be __________.

Wähle eine der folgenden:

  • saturated

  • superheated

  • condensed

  • convected

Erklärung

Frage 16 von 128

1

Which of the following problems may be encountered when using an oil having a viscosity higher than that specified for an operating a hydraulic system?

Wähle eine der folgenden:

  • Increased power consumption

  • Hydraulic film breakdown

  • External leakage

  • Hunting due to fast response

Erklärung

Frage 17 von 128

1

The unbalanced force, which is directed toward the center of the circular path is called ________.

Wähle eine der folgenden:

  • Centripetal Force

  • Torque

  • Centrifugal Force

  • Force

Erklärung

Frage 18 von 128

1

As steam accomplishes work in an engine or turbine, the pressure of the steam is reduced because it __________.

Wähle eine der folgenden:

  • expands in volume

  • diminishes in volume

  • becomes saturated again

  • becomes superheated again

Erklärung

Frage 19 von 128

1

It is the responsibility of the ship’s staff to obtain from the fuel supplier a sealed, labeled, and representative fuel sample at each bunker operation, and retain on board for at least ___________ days.

Wähle eine der folgenden:

  • 90

  • 30

  • 180

  • 360

Erklärung

Frage 20 von 128

1

Failure of the fuel oil service pump to maintain fuel oil flow to the burner could be caused by ____________.

Wähle eine der folgenden:

  • dirty fuel oil strainers

  • a high relief valve setting

  • excessive return line oil pressure

  • excessive fuel pump speed

Erklärung

Frage 21 von 128

1

The replacement piping for diesel engine high pressure fuel systems must be the same length and diameter as the original piping to _____________.

Wähle eine der folgenden:

  • maintain specified injection characteristics

  • avoid unnecessary parts inventory

  • use existing supports and braces

  • keep torsional vibration constant

Erklärung

Frage 22 von 128

1

The location of a vessel’s frame stations may be obtained from which of the listed drawings?

Wähle eine der folgenden:

  • Profile

  • Base line

  • Cross section

  • Buttock

Erklärung

Frage 23 von 128

1

Which of the listed operational checks should be continuously made on the main propulsion reduction gears?

Wähle eine der folgenden:

  • Check lube oil bearing temperatures

  • Check radial bearing wear

  • Inspect alignment between gears and turbine

  • Check teeth for pitting and scuffing

Erklärung

Frage 24 von 128

1

In the distribution of heat balance in a four-stroke diesel engine, which of the following has the least part?

Wähle eine der folgenden:

  • Radiation

  • Cooling Water

  • Exhaust Gases

  • Indicated Power

Erklärung

Frage 25 von 128

1

Fuel injection systems meter fuel, atomize fuel and ____________.

Wähle eine der folgenden:

  • inject fuel at the proper time

  • create turbulence in the combustion chamber

  • aid in completing cylinder scavenging

  • minimize fuel penetration into the cylinder

Erklärung

Frage 26 von 128

1

After a long period of operation, a wear ridge, caused by piston ring action, will develop near the top of the cylinder liner. This ridge must be removed when piston rings are renewed in order to prevent ____________.

Wähle eine der folgenden:

  • breaking of the top ring, ring land, or both

  • excessive wear during the seating period

  • excessive lubrication of the top ring

  • improper spreading of lubrication on the cylinder wall

Erklärung

Frage 27 von 128

1

In running on fuel with bad ignition quality and long ignition delay, what is the best method to reduce this delay?

Wähle eine der folgenden:

  • Increase scavenging Temperature

  • Increase Engine Load

  • Increase Jacket-cooling Temperature

  • Lower Scavenging Temperature

Erklärung

Frage 28 von 128

1

What requirements have to be met to carry out a cold standby starting on marine diesel oil?

Wähle eine der folgenden:

  • Jacket-cooling Water above 0°C

  • Jacket-cooling water above 50°C

  • Jacket-cooling water above 50°C and nozzle oil temperature above 50°C

  • Jacket-cooling water above 50°C and nozzle oil temperature above 80°C

Erklärung

Frage 29 von 128

1

A diesel engine fails to start due to excessive water in the fuel. Before the engine can be started, the water should be removed from the ____________.

Wähle eine der folgenden:

  • fuel lines

  • lube oil filter

  • crank case pump

  • rocker arm reservoir

Erklärung

Frage 30 von 128

1

What is the best way to recondition a defective fuel injector?

Wähle eine der folgenden:

  • Send to the nearest authorized repairer

  • Overhaul and clean each parts

  • Overhaul, clean and lap with grinding compound

  • Lap the needle to its seat with metal polish

Erklärung

Frage 31 von 128

1

Which of the following clearance readings should be taken and recorded in drydock?

Wähle eine der folgenden:

  • The rudder bearing clearances

  • The clearances between the propeller blade tips and the hull

  • The clearances between the propeller hub and the fair water cone

  • The clearances between the stern tube packing gland and the retaining ring

Erklärung

Frage 32 von 128

1

When the tailshaft is drawn from a vessel in drydock, which of the following inspections listed below is required to be carried out?

Wähle eine der folgenden:

  • The propeller hub taper and shaft keyway should be inspected for cracks or corrosion

  • The stern bearing alignment with the stern frame should be checked

  • The interior of the stern tube should be inspected for leaks

  • The shaft liner should be removed and inspected for cracks

Erklärung

Frage 33 von 128

1

What causes carbon to adhere to the inside surfaces of a fuel oil heater?

Wähle eine der folgenden:

  • Excessive fuel oil temperature

  • Too much carbon in the fuel

  • Deteriorated zinc strips

  • Vanadium in the fuel

Erklärung

Frage 34 von 128

1

When reconditioning fuel injector nozzle, the needle should ______ to its seat.

Wähle eine der folgenden:

  • Not Be lapped

  • Be lapped

  • Be Replaced

  • Be Ground

Erklärung

Frage 35 von 128

1

An interlock in the remote operating valve line of air starting system, stops the valve opening when the engine ________ is engaged.

Wähle eine der folgenden:

  • Turning Gear

  • Clutch Lever

  • Shifting Lever

  • Starting Air Valve

Erklärung

Frage 36 von 128

1

Which of the following reason the Society may cancel approval of the PMS when it is considered difficult to be continued?    I.        the PMS is found not operated in accordance with the approved scheme  
II.       damage or deficiency found on items covered by the PMS has not been rectified at date recommended   
III.      when the shipowner/ ship management company is changed

Wähle eine der folgenden:

  • I, II and III

  • I only

  • II only

  • I and II

Erklärung

Frage 37 von 128

1

As a management level officer in a crosshead type propulsion diesel engine, what is the appropriate action if you found that oil consumption is increasing in every voyage?
I.        Replace worn out stuffing box rings
II.       Overhaul piston/ replace o-rings   
III.      Replace broken piston rings

Wähle eine der folgenden:

  • I, II and III

  • I only

  • II only

  • I and II

Erklärung

Frage 38 von 128

1

Under the rules of Classification Societies, which of the following items is/are NOT permitted to be surveyed by the Chief Engineer?
I. Tanks forming part of the vessel’s hull structure
II. Main and auxiliary boiler III. Main air compressor

Wähle eine der folgenden:

  • I and II

  • I only

  • II only

  • I, II and III

Erklärung

Frage 39 von 128

1

Confirmatory survey on auxiliary engines carried out by the Surveyors includes which of the following?
I - engine to be examined running under load and the governor and circuit breaker tested
II – all safety devices, remote controls, and automatic alarms to be tested
III – engine performance data to be taken for evaluation

Wähle eine der folgenden:

  • I & II

  • I only

  • II only

  • I, II & III

Erklärung

Frage 40 von 128

1

Which of the following items is/are NOT covered by CMS?
I.    Tail shaft  
II.   Boiler  
III.  Air compressor

Wähle eine der folgenden:

  • I and II

  • I only

  • II only

  • I, II and III

Erklärung

Frage 41 von 128

1

What are the areas usually covered during Safety Equipment Inspection?
I. Firefighting and distress equipment
II. Navigational equipment
III. Details of required navigational lights and sound signals

Wähle eine der folgenden:

  • I, II and III

  • I only

  • II only

  • I and II

Erklärung

Frage 42 von 128

1

On the following list, what is/are the important documentation that is/are included in the Planned Maintenance System?
I. Maintenance documentation and history
II. Reference documentation III. Signing instruction

Wähle eine der folgenden:

  • I, II and III

  • I only

  • II only

  • I and II

Erklärung

Frage 43 von 128

1

Harmonizing system of ship survey certification provides which from the following choices?
I. one-year standard intervals between surveys.
II. a maximum period of validity of five years for all certificates for cargo ships.
III. a maximum period of validity for 6 months for “Passenger Ship Safety”

Wähle eine der folgenden:

  • I and II

  • I only

  • II only

  • I,II and III

Erklärung

Frage 44 von 128

1

On the following ship’s machinery, which of these may exclusively be surveyed by the surveyors?
I.Main and aux. steam boilers
II.Apparatus under pressure
III.Main drive gears and shafting

Wähle eine der folgenden:

  • I, II and III

  • I only

  • II only

  • I and II

Erklärung

Frage 45 von 128

1

Why does survey of the boiler safety valves have to be carried out?  
I.        Safety valves need to be adjusted under steam to a pressure not more than 103% of the approved working pressure.
II.       The pressure gauge used for adjustment of safety valves is to be calibrated   
III.      The popping pressure of safety valves fitted on the boiler is to be ascertained

Wähle eine der folgenden:

  • I, II and III

  • I only

  • II only

  • I and II

Erklärung

Frage 46 von 128

1

Despite the CMS Program, a thorough examination may be required on similar parts when ____________.   
I.defects or failures are found on areas surveyed    
II.surveyor is in doubt of maintenance records
III.survey schedules are not followed

Wähle eine der folgenden:

  • I only

  • II only

  • I and II

  • I, II and III

Erklärung

Frage 47 von 128

1

What kind of the survey system which alleviates the problem caused by survey dates and interval between surveys that does not coincide?

Wähle eine der folgenden:

  • Harmonizing survey

  • Implementation survey

  • Classification survey

  • Special survey

Erklärung

Frage 48 von 128

1

What survey ensures that the necessary repairs or renewals have been effectively made and that the ship is fit to proceed to sea without presenting an unreasonable threat of harm to safety or marine environment?

Wähle eine der folgenden:

  • Additional survey

  • Intermediate survey

  • Renewal survey

  • Periodical survey

Erklärung

Frage 49 von 128

1

Which of the following is NOT included in the Planned Maintenance System documentation?

Wähle eine der folgenden:

  • Maintenance objectives

  • Inventory control

  • Maintenance time interval

  • Special survey

Erklärung

Frage 50 von 128

1

Which of the following list of machinery cannot be surveyed by the Chief Engineer?

Wähle eine der folgenden:

  • Screwshafts

  • Intermediate shafts

  • Forced or induced draught fans

  • Main engine fresh water and lubricating oil coolers

Erklärung

Frage 51 von 128

1

Which of the following is NOT included in the Planned Maintenance System documentation?

Wähle eine der folgenden:

  • Maintenance objectives

  • Inventory control

  • Maintenance time interval

  • Maintenance instructions

Erklärung

Frage 52 von 128

1

When is the best time to give a boiler a bottom blow?

Wähle eine der folgenden:

  • Just after taking it off the line

  • Just before placing it on the line

  • Just after placing it on the line

  • When the boiler pressure has dropped to zero

Erklärung

Frage 53 von 128

1

A diesel engine fails to start due to excessive water in the fuel. Before the engine can be started, where could water be removed from?

Wähle eine der folgenden:

  • Fuel lines

  • Lube oil filter

  • Crank case pump

  • Rocker arm reservoir

Erklärung

Frage 54 von 128

1

Which of the following is NOT part of the survey arrangement base on planned maintenance and therefore, excluded in the Continuous machinery Survey scheme?

Wähle eine der folgenden:

  • Safety equipment

  • Machinery

  • Automatic equipment

  • None of these

Erklärung

Frage 55 von 128

1

What are the surveys performed by a government ship surveyor?

Wähle eine der folgenden:

  • Surveys of foreign-going ships and local craft

  • Make sure that ships components and machinery are built and maintained according to standards required for their class

  • Examines accident damage

  • None of these choices

Erklärung

Frage 56 von 128

1

If a ship does not operate an approved PMS, who is responsible to arrange the attendance of a Surveyor on the first port?

Wähle eine der folgenden:

  • Ship operator

  • Master of the vessel

  • Ship superintendent

  • None of these choices

Erklärung

Frage 57 von 128

1

Which of the listed substances is used as an absorbing agent in the shipboard dehydration of refrigeration system?

Wähle eine der folgenden:

  • Silica gel

  • Methyl

  • Ethylene glycol

  • Sodium bromide

Erklärung

Frage 58 von 128

1

What other chemical test is conducted daily in a boiler water aside from the Alkalinity Test?

Wähle eine der folgenden:

  • Chloride content test

  • Nitrogen content test

  • Soap hardness Test

  • Dissolve CO2 test

Erklärung

Frage 59 von 128

1

How many In-water Surveys (IWS) is being required by Classification Societies in each five-year survey cycle?

Wähle eine der folgenden:

  • Two

  • One

  • Five

  • Three

Erklärung

Frage 60 von 128

1

What kind of maintenance system is adopted when records indicate that it is necessary and not at arbitrary chosen intervals?

Wähle eine der folgenden:

  • Condition-based maintenance

  • Planned Maintenance System

  • Annual machinery audit

  • Reliability-centered maintenance

Erklärung

Frage 61 von 128

1

The oil separator trap is located between the/or __________.

Wähle eine der folgenden:

  • near accumulator drum

  • receiver and expansion valve

  • condenser & receiver

  • in between evaporator

Erklärung

Frage 62 von 128

1

The oil separator trap is located between the/or __________.

Wähle eine der folgenden:

  • near accumulator drum

  • receiver and expansion valve

  • condenser & receiver

  • in between evaporator

Erklärung

Frage 63 von 128

1

On a diesel engine jacket cooling water system, the low pressure alarm should be set...

Wähle eine der folgenden:

  • Exactly equal to the static system pressure, with the pump stopped.

  • Slightly lower than normal pressure, with the pump working.

  • Slightly lower than the static system pressure, with the pump stopped.

  • Slightly higher than the static system pressure, with the pump stopped.

Erklärung

Frage 64 von 128

1

Which of the following items of machinery can be surveyed by the Chief Engineer?

Wähle eine der folgenden:

  • Reciprocating refrigerant compressors

  • Starting air pipes

  • Manoeuvring valves

  • Bulkhead stop valves

Erklärung

Frage 65 von 128

1

Which admits air to the piston of a cylinder relay valves in a correct sequence for engine starting?

Wähle eine der folgenden:

  • Starting Air Distributor

  • Starting Air Valve

  • Reversing Air Valve

  • Brake-Air Valve

Erklärung

Frage 66 von 128

1

Which of the following items of machinery can be surveyed by the Chief Engineer?

Wähle eine der folgenden:

  • Brine pumps

  • Stern bearings

  • Sea connections

  • Starting air pipes

Erklärung

Frage 67 von 128

1

On a auxiliary diesel engine, after a major overhaul and survey, which of the following would the classification surveyor wish to check before returning it into service?

Wähle eine der folgenden:

  • That all of the covers have been replaced.

  • That the lubricating oil charge has been renewed.

  • That the over speed trip operates at the correct setting.

  • That the engine can be started and stopped from the control room.

Erklärung

Frage 68 von 128

1

Which of the following listed construction details of internal combustion engines is required?

Wähle eine der folgenden:

  • A warning notice to caution against the opening of a hot crankcase for a specified period of time after shut down

  • The use of end block construction for engines development over 1000 brake horsepower

  • Removable cylinder liners must be used for engines developing over 1000 brake horsepower

  • All engines shall be provided with an exhaust gas pressure monitoring system

Erklärung

Frage 69 von 128

1

Which of the following listed construction details of internal combustion engines is required?

Wähle eine der folgenden:

  • A warning notice to caution against the opening of a hot crankcase for a specified period of time after shut down

  • The use of end block construction for engines development over 1000 brake horsepower

  • Removable cylinder liners must be used for engines developing over 1000 brake horsepower

  • All engines shall be provided with an exhaust gas pressure monitoring system

Erklärung

Frage 70 von 128

1

What is the reason why replacement of piping for diesel engine high pressure fuel systems must be of the same length and diameter as the original piping?

Wähle eine der folgenden:

  • To maintain specified injection characteristics

  • To avoid unnecessary parts inventory

  • To use existing supports and braces

  • To keep torsional vibration constant

Erklärung

Frage 71 von 128

1

What is the purpose of the expansion tank in a closed type jacket cooling water system of a diesel engine?

Wähle eine der folgenden:

  • To accommodate for an increase in water volume

  • To have reserve cooling water

  • To maintain pressure in the system

  • To increase the pressure of the jacket cooling

Erklärung

Frage 72 von 128

1

Why is it necessary to blow down a gage glass periodically?

Wähle eine der folgenden:

  • To remove any sediment from the glass

  • To maintain the proper water level in the steam drum

  • To provide water samples for the second assistant

  • To test the feedwater stop-check valve

Erklärung

Frage 73 von 128

1

What is the purpose of the heater module in the jacket-cooling water system?

Wähle eine der folgenden:

  • To keep the jacket-cooling water temperature high enough when the engine has stopped, to ensure a warm start up can be performed

  • To prevent freezing of jacket cooling water

  • To keep the jacket-cooling water temperature charge air cooler during low load operation.

  • To keep the lube oil warm.

Erklärung

Frage 74 von 128

1

What causes carbon to adhere to the inside surfaces of a fuel oil heater?

Wähle eine der folgenden:

  • Excessive fuel oil temperature

  • Too much carbon in the fuel

  • Deteriorated zinc strips

  • Vanadium in the fuel

Erklärung

Frage 75 von 128

1

When should you blow down the boiler water gage glasses?

Wähle eine der folgenden:

  • When you are in doubt about the water level

  • Twice each day on the midnight and afternoon watches

  • Every 12 hours of steady boiler steaming operation

  • When the boiler water level changes in a steaming boiler

Erklärung

Frage 76 von 128

1

An interlock in the remote operating valve line of air starting system, stops the valve opening in what condition?

Wähle eine der folgenden:

  • When the engine turning gear is engaged

  • When the Clutch Lever is engaged

  • When shifting lever is engaged

  • When starting air valve is open

Erklärung

Frage 77 von 128

1

What is the purpose of the expansion tank in a closed type jacket cooling water system of a diesel engine?

Wähle eine der folgenden:

  • To accommodate for an increase in water volume

  • To have reserve cooling water

  • To maintain pressure in the system

  • To increase the pressure of the jacket cooling

Erklärung

Frage 78 von 128

1

Which of the following items of machinery can be surveyed by the Chief Engineer?
I.     Screwshafts
II.    Reciprocating refrigerant compressors
III.   Brine pumps

Wähle eine der folgenden:

  • II and III

  • I and II

  • I and III

  • I, II and III

Erklärung

Frage 79 von 128

1

Which of the following items of machinery can be surveyed by the Chief Engineer?
I.      Boiler fuel oil heaters
II.     Circulating pumps
III.    Governor

Wähle eine der folgenden:

  • II and III

  • I and II

  • I and III

  • I, II and III

Erklärung

Frage 80 von 128

1

All spaces shall be made safe for access i.e. gas freed, ventilated and illuminated, and prepared for the surveyor to examine the structure in a safe and practical way. Which of the following means of access, acceptable to the surveyor shall be provided?
I.      Portable light
II.    lifts and moveable platforms
III.    portable ladders

Wähle eine der folgenden:

  • II and III

  • I and II

  • I and III

  • I, II and III

Erklärung

Frage 81 von 128

1

The steering gear and all working parts should be inspected and lubricated by engine room watch keepers. As these parts if neglected will ________.

Wähle eine der folgenden:

  • eventually seize and put the gear out of action

  • continue to operate efficiently

  • accumulate dust and rust

  • need more oil to operate

Erklärung

Frage 82 von 128

1

Which of the following equipment is covered by CMS?

Wähle eine der folgenden:

  • Cooling water pumps

  • Boiler

  • Propellers and propeller shaft

  • Boiler water separator and pump

Erklärung

Frage 83 von 128

1

In some instances, some survey items deemed appropriate by the Society could be delegated to ship’s owners, however, when satisfactory maintenance has not been carried out, the Society will require _________.
I – Emergency survey
II – Open-up survey
III – Preventive Machinery Maintenance Survey

Wähle eine der folgenden:

  • II only

  • I only

  • I, II and III

  • I and II

Erklärung

Frage 84 von 128

1

The steering gear and all working parts should be inspected and lubricated by engine room watch keepers. As these parts if neglected will ________.

Wähle eine der folgenden:

  • eventually seize and put the gear out of action

  • continue to operate efficiently

  • accumulate dust and rust

  • need more oil to operate

Erklärung

Frage 85 von 128

1

Which of the following equipment is covered by CMS?

Wähle eine der folgenden:

  • Cooling water pumps

  • Boiler

  • Propellers and propeller shaft

  • Boiler water separator and pump

Erklärung

Frage 86 von 128

1

In some instances, some survey items deemed appropriate by the Society could be delegated to ship’s owners, however, when satisfactory maintenance has not been carried out, the Society will require _________.
I – Emergency survey
II – Open-up survey
III – Preventive Machinery Maintenance Survey

Wähle eine der folgenden:

  • II only

  • I only

  • I, II and III

  • I and II

Erklärung

Frage 87 von 128

1

Machinery or equipment are required to be opened if any defect or damage has been noted during CMS and repaired to the satisfaction of ____________.

Wähle eine der folgenden:

  • surveyor

  • marine superintendent

  • owner

  • chief engineer

Erklärung

Frage 88 von 128

1

Which of the following reason the Society may cancel approval of the PMS when it is considered difficult to be continued?    I.        the PMS is found not operated in accordance with the approved scheme  
II.       damage or deficiency found on items covered by the PMS has not been rectified at date recommended   
III.      when the shipowner/ ship management company is changed

Wähle eine der folgenden:

  • I, II and III

  • I only

  • II only

  • I and II

Erklärung

Frage 89 von 128

1

As a management level officer in a crosshead type propulsion diesel engine, what is the appropriate action if you found that oil consumption is increasing in every voyage?
I.        Replace worn out stuffing box rings
II.       Overhaul piston/ replace o-rings   
III.      Replace broken piston rings

Wähle eine der folgenden:

  • I, II and III

  • I only

  • II only

  • I and II

Erklärung

Frage 90 von 128

1

What kind of survey is to be carried out at each anniversary after the vessel delivery?

Wähle eine der folgenden:

  • Annual survey

  • Special survey

  • Intermediate survey

  • Initial survey

Erklärung

Frage 91 von 128

1

All CMS items have a survey cycle of _______.

Wähle eine der folgenden:

  • every five years

  • annually

  • every two years

  • every four years

Erklärung

Frage 92 von 128

1

A kind of survey which is systematically, continuously and sequentially done in accordance with survey schedule table as approved by the Society is ___________.   
I.        Planned Maintenance Survey
II.       Continuous Machinery Survey
III.      Preventive Maintenance Survey

Wähle eine der folgenden:

  • II only

  • I only

  • I,II and III

  • I and II

Erklärung

Frage 93 von 128

1

During the CMS, when any defect or damage is found, similar machinery or equipment are required to be opened and repaired to the satisfaction of the __________.

Wähle eine der folgenden:

  • Surveyor

  • Chief engineer

  • Marine superintendent

  • Owner

Erklärung

Frage 94 von 128

1

Despite the CMS Program, a thorough examination may be required on similar parts when ____________.   
I.defects or failures are found on areas surveyed    
II.surveyor is in doubt of maintenance records
III.survey schedules are not followed

Wähle eine der folgenden:

  • I only

  • II only

  • I and II

  • I, II and III

Erklärung

Frage 95 von 128

1

Under the rules of Classification Societies, which of the following items is/are NOT permitted to be surveyed by the Chief Engineer?
I.Tanks forming part of the vessel’s hull structure
II.Main and auxiliary boiler III. Main air compressor

Wähle eine der folgenden:

  • I and II

  • I only

  • II only

  • I, II and III

Erklärung

Frage 96 von 128

1

Who among the following surveyors is tasked to examine ship cargoes, investigate accident at sea and prepare accident reports for insurance purposes?

Wähle eine der folgenden:

  • Private ship surveyors

  • Classification society ship surveyor

  • None of these choices

  • Government ship surveyors

Erklärung

Frage 97 von 128

1

Classification societies recognize survey performed by the Chief Engineer under which of the following conditions?
I. Must have held that position for at least one year on ship with same type of propelling machinery.
II. Must hold a valid license required for the machinery issued by respective authorities.
III. Surveys done on pressureless service tanks which do not form part of all hull structure.

Wähle eine der folgenden:

  • I, II and III

  • I and II

  • I only

  • II only

Erklärung

Frage 98 von 128

1

What are the surveys performed by a government ship surveyor?

Wähle eine der folgenden:

  • Surveys of foreign-going ships and local craft

  • Make sure that ships components and machinery are built and maintained according to standards required for their class

  • Examines accident damage

  • None of these choices

Erklärung

Frage 99 von 128

1

What kind of the survey system which alleviates the problem caused by survey dates and interval between surveys that does not coincide?

Wähle eine der folgenden:

  • Harmonizing survey

  • Implementation survey

  • Classification survey

  • Special survey

Erklärung

Frage 100 von 128

1

Which of the following is NOT part of the survey arrangement base on planned maintenance and therefore, excluded in the Continuous machinery Survey scheme?

Wähle eine der folgenden:

  • Safety equipment

  • Machinery

  • Automatic equipment

  • None of these

Erklärung

Frage 101 von 128

1

Confirmatory survey on auxiliary engines carried out by the Surveyors includes the following such as _________.
I - engine to be examined running under load and the governor and circuit breaker tested
II – all safety devices, remote controls, and automatic alarms to be tested
III – engine performance data to be taken for evaluation

Wähle eine der folgenden:

  • I & II

  • I only

  • II only

  • I, II & III

Erklärung

Frage 102 von 128

1

Under which instrument is enhanced survey for class requirement of dry bulk carriers belong?
I.      MARPOL 73/78
II.     IMO Resolution
III.    Solas

Wähle eine der folgenden:

  • II only

  • I only

  • I, II and III

  • III only

Erklärung

Frage 103 von 128

1

Which of the following items is/are NOT covered by CMS?
I.    Tail shaft  
II.    Boiler  
III.    Air compressor

Wähle eine der folgenden:

  • I and II

  • I only

  • II only

  • I, II and III

Erklärung

Frage 104 von 128

1

By what means the vessel can effectively be monitored of its sea worthiness by the classification society in order for classed continuity?

Wähle eine der folgenden:

  • Surveys

  • Inspections

  • Investigations

  • Audit and inspection

Erklärung

Frage 105 von 128

1

What are the areas usually covered during Safety Equipment Inspection?
I. Firefighting and distress equipment
II. Navigational equipment
III. Details of required navigational lights and sound signals

Wähle eine der folgenden:

  • I, II and III

  • I only

  • II only

  • I and II

Erklärung

Frage 106 von 128

1

Which of the following is NOT included in the Planned Maintenance System documentation?

Wähle eine der folgenden:

  • Maintenance objectives

  • Inventory control

  • Maintenance time interval

  • Maintenance instructions

Erklärung

Frage 107 von 128

1

On the following list, what is/are the important documentation that is/are included in the Planned Maintenance System?
I. Maintenance documentation and history
II. Reference documentation
III. Signing instruction

Wähle eine der folgenden:

  • I, II and III

  • I only

  • II only

  • I and II

Erklärung

Frage 108 von 128

1

You should blow down a gage glass periodically to ______.

Wähle eine der folgenden:

  • remove any sediment from the glass

  • maintain the proper water level in the steam drum

  • provide water samples for the second assistant

  • test the feedwater stop-check valve

Erklärung

Frage 109 von 128

1

What is the maximum time interval for hydrostatically testing boilers on a cargo vessel having water-tube boilers as required by regulation?

Wähle eine der folgenden:

  • 5 years

  • 1 year

  • 2 years

  • 8 years

Erklärung

Frage 110 von 128

1

The studs and bolts on marine boiler mountings must be removed for examination at least every _____.

Wähle eine der folgenden:

  • 10 years

  • 3 years

  • 4 years

  • 5 years

Erklärung

Frage 111 von 128

1

When is the best time to give a boiler a bottom blow?

Wähle eine der folgenden:

  • Just after taking it off the line

  • Just before placing it on the line

  • Just after placing it on the line

  • When the boiler pressure has dropped to zero

Erklärung

Frage 112 von 128

1

The boiler water gage glasses should be blown down _______.

Wähle eine der folgenden:

  • when you are in doubt about the water level

  • twice each day on the midnight and afternoon watches

  • every 12 hours of steady boiler steaming operation

  • when the boiler water level changes in a steaming boiler

Erklärung

Frage 113 von 128

1

What kind of maintenance system is adopted where invention only happens when records indicate that it is necessary and not at arbitrary chosen intervals?

Wähle eine der folgenden:

  • Condition-based maintenance

  • Planned Maintenance System

  • Annual machinery audit

  • Reliability-centered maintenance

Erklärung

Frage 114 von 128

1

With computerized systems, the access to update the maintenance documentation and the maintenance program lies on the ________.

Wähle eine der folgenden:

  • Chief Engineer

  • Duty Engineer

  • Second Engineer

  • Engine cadet

Erklärung

Frage 115 von 128

1

If a ship does not operate an approved PMS, who is responsible to arrange the attendance of a Surveyor on the first port?

Wähle eine der folgenden:

  • Ship operator

  • Master of the vessel

  • Ship superintendent

  • None of these choices

Erklärung

Frage 116 von 128

1

Which of the following item is NOT being checked by the surveyor during the Annual Survey of the Planned Maintenance System?

Wähle eine der folgenden:

  • Previous training of the Chief Engineer regarding Planned Maintenance System

  • All jobs had been carried out at their due dates, and no overdue jobs are present

  • Function test and random check of the system

  • Whether the Chief Engineer is familiar with the system

Erklärung

Frage 117 von 128

1

What particular machinery item on main propulsion diesel engines is NOT to be surveyed by the Chief Engineer?

Wähle eine der folgenden:

  • Crankshaft and bearing

  • Fuel injection pumps and fuel booster pumps.

  • Camshaft and camshaft drive.

  • Turbocharger.

Erklärung

Frage 118 von 128

1

Harmonizing system of ship survey certification provides _______.
I. one-year standard intervals between surveys.
II. a maximum period of validity of five years for all certificates for cargo ships.
III. a maximum period of validity for 6 months for “Passenger Ship Safety”

Wähle eine der folgenden:

  • I and II

  • I only

  • II only

  • I,II and III

Erklärung

Frage 119 von 128

1

What survey ensures that the necessary repairs or renewals have been effectively made and that the ship is fit to proceed to sea without presenting an unreasonable threat of harm to safety or marine environment?

Wähle eine der folgenden:

  • Additional survey

  • Intermediate survey

  • Renewal survey

  • Periodical survey

Erklärung

Frage 120 von 128

1

On the following ship’s machinery, which of these may exclusively be surveyed by the surveyors?
I.Main and aux. steam boilers
II.Apparatus under pressure
III.Main drive gears and shafting

Wähle eine der folgenden:

  • I, II and III

  • I only

  • II only

  • I and II

Erklärung

Frage 121 von 128

1

How many In-water Surveys (IWS) is being required by Classification Societies in each five-year survey cycle?

Wähle eine der folgenden:

  • Two

  • One

  • Five

  • Three

Erklärung

Frage 122 von 128

1

One of the two docking surveys should coincide with the _______.

Wähle eine der folgenden:

  • Special Survey

  • Initial survey

  • Periodical survey

  • annual survey

Erklärung

Frage 123 von 128

1

Why does survey of the boiler safety valves have to be carried out?  
I.        Safety valves need to be adjusted under steam to a pressure not more than 103% of the approved working pressure. II.       The pressure gauge used for adjustment of safety valves is to be calibrated  
III.      The popping pressure of safety valves fitted on the boiler is to be ascertained

Wähle eine der folgenden:

  • I, II and III

  • I only

  • II only

  • I and II

Erklärung

Frage 124 von 128

1

What kind of survey is carried out by the Surveyor within one year from the date of approval for application of the PMS?

Wähle eine der folgenden:

  • initial survey

  • classification survey

  • annual survey

  • continuous machinery survey

Erklärung

Frage 125 von 128

1

Which of the following items of machinery can be surveyed by the Chief Engineer?

Wähle eine der folgenden:

  • Fuel injection pumps and fuel booster pumps

  • Boiler fuel oil heaters

  • Steam pipes

  • Manoeuvring valves and bulkhead stop valves

Erklärung

Frage 126 von 128

1

Which of the following items of machinery can be surveyed by the Chief Engineer?

Wähle eine der folgenden:

  • Reciprocating refrigerant compressors

  • Starting air pipes

  • Manoeuvring valves

  • Bulkhead stop valves

Erklärung

Frage 127 von 128

1

Which of the following items of machinery can be surveyed by the Chief Engineer?

Wähle eine der folgenden:

  • Brine pumps

  • Stern bearings

  • Sea connections

  • Starting air pipes

Erklärung

Frage 128 von 128

1

Which of the following list of machinery canNOT be surveyed by the Chief Engineer?

Wähle eine der folgenden:

  • Screwshafts

  • Intermediate shafts

  • Forced or induced draught fans

  • Main engine fresh water and lubricating oil coolers

Erklärung