Lauren Neuburger
Quiz von , erstellt am more than 1 year ago

SRO Nuclear Operations (Practice Exams) Quiz am Systems 3 - Secondary , erstellt von Lauren Neuburger am 28/10/2016.

4
0
0
Lauren Neuburger
Erstellt von Lauren Neuburger vor fast 8 Jahre
Schließen

Systems 3 - Secondary

Frage 1 von 1

1

Which of the following describes the operation of the Circulating Water System?

Wähle eine der folgenden:

  • A. A reduction in Squaw Creek Reservoir temperature decreases main turbine efficiency.

  • B. Starting of a circulating water pump is delayed until the discharge valve is 55 degrees open.

  • C. A pump stop signal is delayed until the discharge valve is 55 degrees from the fully open position.

  • D. Circulating water pump will automatically stop if the discharge valve goes to 35 degrees from the fully open position.

Erklärung