Central Heating Exam 2

Beschreibung

Construction / Engineering Quiz am Central Heating Exam 2, erstellt von Jarmo Tossavainen am 09/05/2018.
Jarmo Tossavainen
Quiz von Jarmo Tossavainen, aktualisiert more than 1 year ago
Jarmo Tossavainen
Erstellt von Jarmo Tossavainen vor mehr als 6 Jahre
425
1

Zusammenfassung der Ressource

Frage 1

Frage
1/ Which part of the Building Regulations deals with the energy efficient installation of central heating systems in domestic properties?
Antworten
  • a) Part G
  • b) Part L1
  • c) Part L2
  • d) Part M

Frage 2

Frage
2/ Details of the heat output requirement for a particular radiator can be found in which of the following documents?
Antworten
  • a) British Standards
  • b) Water Regulations
  • c) Building Regulations
  • d) Manufacturer’s brochure

Frage 3

Frage
3/ What is the likely outcome of rigidly fixing central heating pipework to the notched sections in timber first floor joists?
Antworten
  • a) Rupture of the pipework
  • b) A reduction in energy efficiency
  • c) Corrosion of the pipework
  • d) Expansion and contraction noise

Frage 4

Frage
4/ The main disadvantage of using a one pipe circuit to the radiators in a central heating system is that –
Antworten
  • a) The last radiator on the circuit will be fed with water at a lower temperature than the first
  • b) The first radiator on the circuit will be fed with water at a lower temperature than the last
  • c) Pipework feeding all radiators must be 22mm in diameter
  • d) The circuit cannot be pumped, gravity circulation must be used

Frage 5

Frage
5/ Which fully pumped central heating system control component is missing from ` the following diagram?
Antworten
  • a) Pump
  • b) Cylinder thermostat
  • c) Room thermostat
  • d) Mid-position valve

Frage 6

Frage
6/ What is the minimum size of open vent pipe to a fully pumped central heating system in a small domestic property?
Antworten
  • a) 10mm
  • b) 15mm
  • c) 22mm
  • d) 28mm

Frage 7

Frage
7/ Which one of the following additional components will require to be installed when replacing a single feed indirect cylinder with a double feed indirect cylinder?
Antworten
  • a) Frost thermostat
  • b) Feed and expansion cistern
  • c) Cold water storage cistern
  • d) Automatic bypass valve

Frage 8

Frage
What would be the main effect on the central heating system if the circulator was installed in the position shown in this diagram?
Antworten
  • a. The system would be under negative pressure
  • b. The system would be mostly under negative pressure
  • c. The system would be pumping over the open vent
  • d. The neutral position would be at the base of the open vent.

Frage 9

Frage
The feed and expansion cistern in an open vented central heating system should be capable of receiving what percentage volume of water from the heating system when heated –
Antworten
  • a) 2%
  • b) 4%
  • c) 8%
  • d) 16%

Frage 10

Frage
The recommended vertical height from floor level to the position of a room thermostat is –
Antworten
  • a) 1.0m
  • b) 1.5m
  • c) 2.0m
  • d) 2.5m

Frage 11

Frage
Which air separator port in the following diagram is the flow pipe from the boiler connected to?
Antworten
  • a) Port 1
  • b) Port 2
  • c) Port 3
  • d) Port 4

Frage 12

Frage
Which of the following statements is correct in relation to the installation of thermostatic radiator valves?
Antworten
  • a) Thermostatic radiator valves may only be fitted to ground floor radiators in a property
  • b) Thermostatic radiator valves may only be fitted to first floor radiators in a property
  • c) All radiators in a property should be fitted with thermostatic radiator valves
  • d) At least one radiator in a property should be fitted without a thermostatic radiator valve

Frage 13

Frage
Which pipe connects to the AB port of the mid-position valve in the following diagram?
Antworten
  • a) Open vent pipe
  • b) Flow pipe to the cylinder
  • c) Return pipe from the cylinder
  • d) Flow pipe from the pump

Frage 14

Frage
Which of the following components is fitted at the high points in pipework in central heating systems?
Antworten
  • a) Automatic air vent
  • b) Non-return valve
  • c) Automatic bypass valve
  • d) Drain valve

Frage 15

Frage
Central heating systems with metallic pipework materials are normally soundness tested to what test pressure?
Antworten
  • a) 0.5 times the maximum operating pressure
  • b) The maximum operating pressure
  • c) 1.5 times the maximum operating pressure
  • d) Twice the maximum operating pressure

Frage 16

Frage
Which of the following is part of the commissioning procedure for a new central heating system?
Antworten
  • a) Hot flushing to assist with flux removal
  • b) Disinfecting the system with chlorine
  • c) Removing the feed & expansion cistern during filling
  • d) Lubricating the circulating pump with oil

Frage 17

Frage
When replacing a radiator and its associated valves sited on the first floor of a property which is the most efficient way of draining the water to undertake the work?
Antworten
  • a) Turn off the valves and drain down the radiator
  • b) Completely drain the whole system
  • c) Drain the system to below the first floor
  • d) Isolate the cistern and empty its contents

Frage 18

Frage
The safest method of ensuring that the electrical controls in a central heating system cannot be re-activated during temporary decommissioning work is to –
Antworten
  • a) Isolate the system from the supply at the consumer unit and get on with the work
  • b) Switch off the supply to the system at the fused spur, retain the fuse and check for safe isolation
  • c) Switch off the supply to the system at the fused spur and check for safe isolation
  • d) Switch off the fused spur remove the wires from its outlet and tape up the ends

Frage 19

Frage
What is the likely problem arising from a bypass not being fitted to an open vented close-coupled fully pumped heating system controlled by 2 x two port valves on the heating and hot water circuits?
Antworten
  • a) ‘Sucking down’ and ‘pumping over’ the open vent pipe
  • b) Blockage occurring in the cold feed pipe
  • c) Rapid pinhole corrosion of the radiators
  • d) No cool water from the f & e cistern if the system overheats

Frage 20

Frage
Which of the following central heating components may contain a replaceable packing gland?
Antworten
  • a) Circulating pump
  • b) Automatic air vent
  • c) Thermostatic radiator valve
  • d) Room thermostat
Zusammenfassung anzeigen Zusammenfassung ausblenden

ähnlicher Inhalt

Stimmungen in Englisch lernen
Michelle Eichinger
Der Erste Weltkrieg
Laura Overhoff
BAS1 - Bau und Funktion des Bewegungsapparates (1)
susi.spakowski08
Oxford Academic Word List Sub1
torsten fab
Themen der Vektorrechnung
Paula Raithel
PAED
M T
PR 2017/18
Carmen Mai
Forschungs- und Anwendungsfelder der Soziologie Teil 1
stelly Welly
MEKO WS 18/19
max knoll
Vetie: Milch 2020 Matrikel 14
Johanna Tr