Zusammenfassung der Ressource
Frage 1
Frage
What information goes in the Project Code field?
Antworten
-
The client PO #
-
The EJR PO #
-
The vendor order #
Frage 2
Frage
Select the correct information below that should be entered in the Project Name field.
Antworten
-
180701
-
CARME-101: Check
-
Exact Repeat
Frage 3
Frage
When creating a new TimeFox job, the status of the job should be Closed.
Frage 4
Frage
The purpose of TimeFox is to [blank_start]track time spent on a project[blank_end].
Frage 5
Frage
TimeFox is not required on exact repeat jobs.