Frage 1
Frage
1. Which of the following information is not required for an isometric drawing?
Antworten
-
a. Location of building
-
b. Room dimensions
-
c. Positions of walls
-
d. Window specifications
Frage 2
Frage
2. Which of the following is a benefit of isometric drawings?
Antworten
-
a. Provides a pictorial view of the finished product
-
b. Helps the customer understand what the product will look like
-
c. Provides a pictorial view of the design concept
-
d. All of the above
Frage 3
Frage
Which of the following is not required to produce isometric projection drawings?
Antworten
-
a. Isometric axis
-
b. Customer details
-
c. Scale
-
d. Object dimensions
Frage 4
Frage
4. Which construction method is used to ensure heat loss is at a minimum?
Frage 5
Frage
What does EPC stand for?
Antworten
-
a. Energy Presence Critical
-
b. Energy Presence Certificate
-
c. Energy Performance Critical
-
d. Energy Performance Certificate
Frage 6
Frage
What insulation material is abbreviated to PIR?
Antworten
-
a. Polyisurate
-
b. Polyisocyanurate
-
c. Polyisocyan
-
d. Polyisorate
Frage 7
Frage
What insulation material is abbreviated to EP?
Antworten
-
a. Excellent polystyrene
-
b. Expanding polystyrene
-
c. Energy polystyrene
-
d. Expanded polystyrene
Frage 8
Frage
Which sustainable product is sourced by FSC?
Antworten
-
a. Timber
-
b. Bricks
-
c. Stone
-
d. Cement