Zusammenfassung der Ressource
Frage 1
Frage
What stage in the project lifecycle does testing come into?
Antworten
-
Initiation
-
Planning
-
Execution
-
Evaluation
Frage 2
Frage
The SMART objectives are Specific, Measureable, Achievable, Realistic and Time Bound
Frage 3
Frage
Tick the two boxes that are properties of a Pert Chart
Antworten
-
Nodes
-
Dates
-
Critical Path
Frage 4
Frage
Tick the box that has the correct inputs and outputs for the Initiation part of the project lifecycle
Antworten
-
Input: Feasibility Report
Output: Project and Test Plans
-
Input: User Requirements
Outputs: Feasibility Report
-
Input: Test Results
Output: Final Evaluation
Frage 5
Frage
This software type is used to store data that usually involves calculations. What type of software is it?
Antworten
-
Presentation Software
-
Database
-
Spreadsheet
-
Word processing
Frage 6
Frage
An integrated document (mail merge) is a feature of Desk Top Publishing