Screeding Quiz

Beschreibung

Quiz am Screeding Quiz, erstellt von Steve Lockwood am 05/11/2014.
Steve Lockwood
Quiz von Steve Lockwood, aktualisiert more than 1 year ago
Steve Lockwood
Erstellt von Steve Lockwood vor fast 10 Jahre
428
0

Zusammenfassung der Ressource

Frage 1

Frage
1. How much mixed material is needed to complete a floor screed 5.000 m long by 4.000 m wide and 0.050 m thick?
Antworten
  • 0.25 m3
  • 0.5 m3
  • 1 m3
  • 1.5 m3

Frage 2

Frage
2. Tools and equipment for floor screeding will generally include:
Antworten
  • sweeping brush, trowel, float, mixer, shovel
  • splash brush, small tool, gauger, trowel, float
  • spirit level, trowel, buckets, mixer, float
  • levelling equipment, trowel, float, shovel buckets, mixer

Frage 3

Frage
Plastic sheeting below the structural floor is the:
Antworten
  • damp proof membrane
  • vapour barrier
  • moisture trap
  • aid to curing the floor

Frage 4

Frage
The type of cement used in floor screeds is:
Antworten
  • Masonry Portland
  • Extra Portland
  • Rapid Portland
  • Ordinary Portland

Frage 5

Frage
Sands used for floor screeding:
Antworten
  • should contain a high proportion of fine grains
  • should contain a high proportion of large grains
  • can be any type
  • should be sharp and well graded

Frage 6

Frage
Ready-mixed screeds are:
Antworten
  • prepared off site and delivered as required
  • prepared after work for the following day
  • prepared in the morning for use during the day
  • used only for self-levelling floors

Frage 7

Frage
Screed rails or battens are used to:
Antworten
  • help delivery of screed material to the workstation
  • assist in forming the main area of floor
  • tamp down the surface of the screed
  • form channels for drainage

Frage 8

Frage
The purpose of a damp proof membrane is to:
Antworten
  • assist the passage of moisture
  • assist in the curing process
  • allow the screed to dry out quickly
  • prevent the passage of moisture

Frage 9

Frage
Cracking of large area floors may be reduced by:
Antworten
  • use of more cement
  • use of expansion strips
  • adding more sand
  • a self-levelling compound

Frage 10

Frage
Battens used as a guide for screeds may be:
Antworten
  • set out from datum lines
  • laid at 50 mm depth
  • set out from base floor
  • laid to form 75 mm depth

Frage 11

Frage
The most accurate proportioning of floor screeding materials:
Antworten
  • is by weight
  • is important near heavily trafficked areas
  • can be carried out using shovels
  • can be carried out using buckets

Frage 12

Frage
The correct consistency for floor screeding materials is:
Antworten
  • as dry as possible
  • slurry like
  • semi wet
  • semi dry

Frage 13

Frage
Mixing of screed material:
Antworten
  • does not have to be thorough as it will be spread by shovel
  • needs to be consistent or wear will take place
  • should be carried out as slowly as possible
  • can take place after water has been added

Frage 14

Frage
Compacting screeds results in a:
Antworten
  • lightweight screed
  • quicker set screed
  • more dense screed
  • slower set screed

Frage 15

Frage
Compacting can be carried out with a:
Antworten
  • screed rail
  • datum
  • rule or float
  • level

Frage 16

Frage
High volumes of ventilation:
Antworten
  • will aid the setting process
  • will not affect the screeds after laying
  • will allow the cement to harden quickly
  • may make the surface of the screed dusty

Frage 17

Frage
The finish on a floor screed:
Antworten
  • is not important as it will all be covered up
  • is important as it may show through the final covering
  • can be completed the next day
  • can be completed by the floor layer with the finish

Frage 18

Frage
Laying polythene sheet on the floor screed after laying will:
Antworten
  • act as an accelerator to the set
  • produce an even surface
  • allow the cement to set naturally
  • keep the floor soft for the next process

Frage 19

Frage
The purpose of curing is to:
Antworten
  • allow the cement to set and harden over a long period
  • produce an even surface
  • produce a lightweight screed
  • aid compaction to take place

Frage 20

Frage
Where drainage outlets are fitted:
Antworten
  • the floor must be laid from this point
  • they can be repositioned later
  • the floor can be altered to fit when finish is applied
  • the drainage contractor will alter them to suit
Zusammenfassung anzeigen Zusammenfassung ausblenden

ähnlicher Inhalt

Checkfragen - Kapitel 1: Empirische Sozialforschung und empirische Theorie
Melanie Najm
L' offre - Phrases - Chapitre 3
Gaelle Bourgeois
Kleines Latein-Quiz
anna.grillborzer0656
Analysis - Abiturvorbereitung Mathe
Laura Overhoff
Grundlagenwissen DaZ
p s
Wege, um mit GoConqr Tools zu unterrichten
Elena Koch
Molekulare Genetik
Gökhan Yesilyayla
Abitur Lernplan 2017
Justin Nolte
Forschungs- und Anwendungsfelder der Soziologie Teil 1
stelly Welly
Vetie Pharma 2017
Tropsi B
MS-1.3 Folienpaket 4
Lukas Imwalle