Frage 1

Frage
The Project Manager will utilize which of the following in performing Perform Qualitative Risk Analysis?
Antworten
  • a. A Risk Rating Matrix
  • b. Expected Monetary Value (EMV)
  • c. Workarounds
  • d. Risk Triggers

Frage 2

Frage
Plan Risk Management is:
Antworten
  • a. A process of identifying potential risks for a project.
  • b. Deciding how risk management activities will be structured and performed.
  • c. Assessing the impact and likelihood of project risks.
  • d. Numerical analysis of the probability of project risks.

Frage 3

Frage
1. Which of the following is not an objective of the Monitor Risk Process??
Antworten
  • a. Develop risk mitigation strategy.
  • b. Analyze contingency reserve.
  • c. Analyzing new risk.
  • d. Monitoring triggers.

Frage 4

Frage
The BEST definition of risk management is:
Antworten
  • a. The process of identifying, analyzing, and responding to risks.
  • b. The process of reducing risk to the minimum level possible for the project.
  • c. The process of proactively ensuring that all project risk is documented and controlled.
  • d. Creation of the risk response plan.

Frage 5

Frage
Multiplying the probabilities by the impact of the opportunity involves using which of the following??
Antworten
  • a. A Risk Rating Matrix
  • b. Expected Monetary Value (EMV)
  • c. Workarounds
  • d. Risk Triggers

Frage 6

Frage
What is one of the typical problem in Project Risk Management?
Antworten
  • a. The project have no risk.
  • b. The project manager are confuse about risk management
  • c. Identify Risks.
  • d. Monitor Risks.

Frage 7

Frage
Risk exist at two levels within the every project:
Antworten
  • a. Mitigation risks and Avoidance risks.
  • b. Light risks and hard risks
  • c. Project charter and scope statement
  • d. Individual project risk and overall project risk

Frage 8

Frage
A risk probability and impact assessment is used in?
Antworten
  • a. Identify Risks
  • b. Qualitative Risk Analysis.
  • c. Quantitative Risk Analysis.
  • d. Plan Risk Responses

Frage 9

Frage
Risk Categorization and data analysis are used in which process
Antworten
  • a. As part of Monitor Risks.
  • b. As part of Qualitative Risk Analysis.
  • c. As part of Plan Risk Response.
  • d. As part of Plan Risk Management.

Frage 10

Frage
The Department of Defense is involved in performance risk monitoring as part of its overall risk strategy. Which of the following best describes Monitor Risk?
Antworten
  • a. Determining what the characteristics of the risks are on the project
  • b. Determining what risks are on the project and which ones have more impact.
  • c. Determining who will implement a Risk Response Plan and give them the needed tools.
  • d. Supervising the implementation of agreed-upon risk response plans, tracking identified risk, and looking for any new risks that could occur
Zusammenfassung anzeigen Zusammenfassung ausblenden

ähnlicher Inhalt

Imperialismus
sandya.zimmerman
EU, OHG, KG, GmbH
Stefan Kurtenbach
B, Kapitel 2, Arbeits- und Sozialordnung
Stefan Kurtenbach
Gemischte Klausur- und sonstige Fragen
Bibische
Einführung in die BWL: Kapitel 1
Anjay
English Idioms
Kasia Cz
Struktur und Entwicklung der Gegenwartgesellschaft Österreich im Wandel - Fragen
Anita Pitsch
Vetie Chirugie 2015
Svea Schill
Vetie Repro Bilderspaß
Tropsi B
Vetie Geflüglekrankheiten altfragen 2020
Taissa Fraga de Almeida
Vetie: Berufsrecht Altfragen 2013-2017 Teil 2
Johanna Tr