Zusammenfassung der Ressource
Frage 1
Frage
Certainteed requires that the minimum thickness for a plywood deck be ½”:
Frage 2
Frage
Certainteed requires that the minimum thickness of a OSB deck be 7/16”.
Frage 3
Frage
Spacing panels 1/8” apart on all sides can be a factor to prevent buckling.
Frage 4
Frage
Wide Boards can cause buckling.
Frage 5
Frage
Ventilated nail-base roof insulation can not be used over cathedral-type ceilings.
Frage 6
Frage
Ventilated nail-base roof insulation can not be used over cathedral-type ceilings.
Frage 7
Frage
Certainteed allows the application of a nailable deck over an unacceptable deck.
Frage 8
Frage
The slope of a deck has no effect on the materials specified for the roof.
Frage 9
Frage
An inspection conducted to decide if a roof should be torn off should always include an examination of the rafters and the attic side of the sheathing.
Frage 10
Frage
Before tearing off a roof, drop cloths should be placed over everything in the attic because: