Frage 1
Frage
Which role is responsible for carrying out the activities of a process?
Antworten
-
A. Process owner
-
B. Change manager
-
C. Service manager
-
D. Process practitioner
Frage 2
Frage
Which process or function is responsible for monitoring activities and events in the IT infrastructure?
Frage 3
Frage
Which of the following options is a hierarchy that is used in knowledge management?
Antworten
-
A. Wisdom - Information - Data - Knowledge
-
B. Data - Information - Knowledge - Wisdom
-
C. Knowledge - Wisdom - Information - Data
-
D. Information - Data - Knowledge - Wisdom
Frage 4
Frage
At which stage of the service lifecycle should the processes necessary to operate a new servicebe
defined?
Antworten
-
A. Service design: Design the processes
-
B. Service strategy: Develop the offerings
-
C. Service transition: Plan and prepare for deployment
-
D. Service operation: IT operations management
Frage 5
Frage
Why are public frameworks, such as 1TIL, attractive when compared to proprietary knowledge?
Antworten
-
A. Proprietary knowledge may be difficult to adopt, replicate or transfer since it is often undocumented
-
B. Public frameworks are always cheaper to adopt
-
C. Public frameworks are prescriptive and tell you exactly what to do
-
D. Proprietary knowledge has been tested in a wide range of environments
Frage 6
Frage
Which of the following is an objective of business relationship management?
Antworten
-
A. To identify patterns of business activity
-
B. To ensure high levels of customer satisfaction
-
C. To secure funding to manage the provision of services
-
D. To ensure strategic plans for IT services exist
Frage 7
Frage
The design of IT services requires the effective and efficient use of "the four Ps". What are these four
Ps?
Antworten
-
A. People, process, partners, performance
-
B. Performance, process, products, plans
-
C. People, process, products, partners
-
D. People, products, plans, partners
Frage 8
Frage
Which of the following BEST describes service strategies value to the business?
Antworten
-
A. Allows higher volumes of successful change
-
B. Reduction in unplanned costs through optimized handling of service outages
-
C. Reduction in the duration and frequency of service outages
-
D. Enabling the service provider to have a clear understanding of what levels of service will make
their customers successful
Frage 9
Frage
Which two processes will contribute MOST to enabling effective problem detection?
Antworten
-
A. Incident and financial management
-
B. Change and release and deployment management
-
C. Incident and event management
-
D. Knowledge and service level management
Frage 10
Frage
Which of the following would be used to communicate a high level description of a major change that
involved significant cost and risk to the organization?
Antworten
-
A. Change proposal
-
B. Change policy
-
C. Service request
-
D. Risk register
Frage 11
Frage
Which of the following should be documented in an incident model?
1. Details of the service level agreement (SLA) pertaining to the incident
2. Chronological order of steps to resolve the incident
Antworten
-
A. 1 only
-
B. 2 only
-
C. Both of the above
-
D. Neither of the above
Frage 12
Frage
Why is it important for service providers to understand patterns of business activity (PBA)?
Antworten
-
A. PBA are based on organizational roles and responsibilities
-
B. IT service providers CANNOT schedule changes until they understand PBA
-
C. Demand for the services delivered by service providers are directly influenced by PBA
-
D. Understanding PBA is the only way to enable accurate service level reporting
Frage 13
Frage
Which one of the following would NOT be defined as part of every process?
Antworten
-
A. Roles
-
B. Inputs and outputs
-
C. Functions
-
D. Metrics
Frage 14
Frage
Which process is responsible for recording the current details, status, interfaces and dependencies of
all services that are being run or being prepared to run in the live environment?
Frage 15
Frage
A process owner has been identified with an “I” in a RACI matrix. Which one of the following would be
expected of them?
Frage 16
Frage
Which of the following are objectives of service level management?
1: Defining, documenting and agreeing the level of FT services to be provided
2: Monitoring, measuring and reporting the actual level of services provided
3: Monitoring and improving customer satisfaction
4: Identifying possible future markets that the service provider could operate in
Antworten
-
A. 1, 2 and 3 only
-
B. 1 and 2 only
-
C. 1, 2 and 4 only
-
D. All of the above
Frage 17
Frage
Which one of the following do technology metrics measure?
Frage 18
Frage
Which process includes business, service and component sub-processes?
Frage 19
Frage
Which one of the following is NOT part of the service design stage of the service life cycle?
Antworten
-
A. Designing and maintaining all necessary service transition packages
-
B. Producing quality, secure and resilient designs for new or improved services
-
C. Taking service strategies and ensuring they are reflected in the service design processes and the
service designs that are produced
-
D. Measuring the effectiveness and efficiency of service design and the supporting processes
Frage 20
Frage
What is the result of carrying out an activity, following a process or delivering an IT service known as?
Antworten
-
A. Outcome
-
B. Incident
-
C. Change
-
D. Problem
Frage 21
Frage
Which process is responsible for managing relationships with vendors?
Frage 22
Frage
Which of the following service desk organizational structures are described in service operation?
1. Local service desk
2. Virtual service desk
3. IT help desk
4. Follow the sun
Antworten
-
A. 1, 2 and 4 only
-
B. 2, 3 and 4 only
-
C. 1, 3 and 4 only
-
D. 1, 2 and 3 only
Frage 23
Frage
What are the categories of event described in the UIL service operation book?
Antworten
-
A. Informational, scheduled, normal
-
B. Scheduled, unscheduled, emergency
-
C. Informational, warning, exception
-
D. Warning, reactive, proactive
Frage 24
Frage
What would you call the groups of people who have an interest in the activities, targets, resources
and deliverables from service management?
Antworten
-
A. Employers
-
B. Stakeholders
-
C. Regulators
-
D. Accreditors
Frage 25
Frage
Which of the following are the MAIN objectives of incident management?
1. To automatically detect service-affecting events
2. To restore normal service operation as quickly as possible
3. To minimize adverse impacts on business operations
Antworten
-
A. 1 and 2 only
-
B. 2 and 3 only
-
C. 1 and 3 only
-
D. All of the above
Frage 26
Frage
What is the name of the group that should review changes that must be implemented faster than the
normal change process?
Frage 27
Frage
Which of the following is NOT an objective of service transition?
Antworten
-
A. To ensure that a service can be operated, managed and supported
-
B. To provide training and certification in project management
-
C. To provide quality knowledge and information about services and service assets
-
D. To plan and manage the capacity and resource requirements to manage a release
Frage 28
Frage
Which of the following types of service should be included in the scope of service portfolio
management?
1. Those planned to be delivered
2. Those being delivered
3. Those that have been withdrawn from service
Antworten
-
A. 1 and 3 only
-
B. All of the above
-
C. 1 and 2 only
-
D. 2 and 3 only
Frage 29
Frage
The BEST description of an incident is:
Antworten
-
A. An unplanned disruption of service unless there is a backup to that service
-
B. An unplanned interruption to service or a reduction in the quality of service
-
C. Any disruption to service whether planned or unplanned
-
D. Any disruption to service that is reported to the service desk, regardless of whether the service is
impacted or not
Frage 30
Frage
Which one of the following is the CORRECT set of steps for the continual service improvement
approach?
Antworten
-
A. Devise a strategy; Design the solution; Transition into production; Operate the solution;Continually
improve
-
B. Where do we want to be?; How do we get there?; How do we check we arrived?; How do we keep
the momentum going?
-
C. Identify the required business outcomes; Plan how to achieve the outcomes; Implement the plan;
Check the plan has been properly implemented; Improve the solution
-
D. What is the vision?; Where are we now?; Where do we want to be?; How do we get there?; Did we
get there?; How do we keep the momentum going?
Frage 31
Frage
When can a known error record be raised?
1. At any time it would be useful to do so
2. After a workaround has been found
Antworten
-
A. 2 only
-
B. 1 only
-
C. Neither of the above
-
D. Both of the above
Frage 32
Frage
What body exists to support the authorization of changes and to assist change management in the
assessment and prioritization of changes?
Antworten
-
A. The change authorization board
-
B. The change advisory board
-
C. The change implementer
-
D. The change manager
Frage 33
Frage
Which process is responsible for discussing reports with customers showing whether services have
met their targets?
Antworten
-
A. Continual service improvement
-
B. Change management
-
C. Service level management
-
D. Availability management
Frage 34
Frage
What do customer perceptions and business outcomes help to define?
Antworten
-
A. The value of a service
-
B. Governance
-
C. Total cost of ownership (TCO)
-
D. Key performance indicators (KPIs)
Frage 35
Frage
Which of the following are basic concepts used in access management?
Antworten
-
A. Personnel, electronic, network, emergency, identity
-
B. Rights, access, identity, directory services, service/service components
-
C. Physical, personnel, network, emergency, service
-
D. Normal, temporary, emergency, personal, group
Frage 36
Frage
Which of these statements about resources and capabilities is CORRECT?
Antworten
-
A. Resources are types of service asset and capabilities are not
-
B. Resources and capabilities are both types of service asset
-
C. Capabilities are types of service asset and resources are not
-
D. Neither capabilities nor resources are types of service asset
Frage 37
Frage
Within service design, what is the key output handed over to service transition?
Antworten
-
A. Measurement, methods and metrics
-
B. Service design package
-
C. Service portfolio design
-
D. Process definitions
Frage 38
Frage
What should a service always deliver to customers?
Antworten
-
A. Applications
-
B. Infrastructure
-
C. Value
-
D. Resources
Frage 39
Frage
Which process is responsible for the availability, confidentiality and integrity of data?
Antworten
-
A. Service catalog management
-
B. Service asset and configuration management
-
C. Change management
-
D. Information security management
Frage 40
Frage
Availability management is directly responsible for the availability of which of the following?
Antworten
-
A. IT services and components
-
B. IT services and business processes
-
C. Components and business processes
-
D. IT services, components and business processes
Frage 41
Frage
What type of baseline captures the structure, contents and details of the infrastructure and represents
a set of items that are related to each other?
Frage 42
Frage
Which of the following BEST describes the purpose of access management?
Antworten
-
A. To provide a channel for users to request and receive standard services
-
B. Provides the rights for users to be able to use a service or group of services
-
C. To prevent problems and resulting Incidents from happening
-
D. To detect security events and make sense of them
Frage 43
Frage
Which of the following are reasons why ITIL is successful?
1. ITIL is vendor neutral
2. It does not prescribe actions
3. ITIL represents best practice
Antworten
-
A. All of the above
-
B. 1 and 3 only
-
C. 1 and 2 only
-
D. 2 and 3 only
Frage 44
Frage
Which one of the following includes four stages called Plan, Do, Check and Act?
Frage 45
Frage
The consideration of value creation is a principle of which stage of the service lifecycle?
Frage 46
Frage
Which process is responsible for dealing with complaints, comments, and general inquiries from
users?
Frage 47
Frage
Which of the following BEST describes partners' in the phrase people, processes, products and
partners"?
Frage 48
Frage
Which process will perform risk analysis and review of all suppliers and contracts on a regular basis?
Antworten
-
A. The service level management
-
B. The IT service continuity management
-
C. The service catalogue management
-
D. The supplier management
Frage 49
Frage
The experiences, ideas, insights and values of individuals are examples of which level of
understanding within knowledge management?
Antworten
-
A. Data
-
B. Information
-
C. Knowledge
-
D. Governance
Frage 50
Frage
Which one of the following contains information that is passed to service transition to enable the
implementation of a new service?
Frage 51
Frage
Which of the following would commonly be found in a contract underpinning an IT service?
1. Financial arrangements related to the contract
2. Description of the goods or service provided
3. Responsibilities and dependencies for both parties
Antworten
-
A. 1 and 2 only
-
B. 1 and 3 only
-
C. 2 and 3 only
-
D. All of the above
Frage 52
Frage
Service transition contains detailed descriptions of which processes?
Antworten
-
A. Change management, service asset and configuration management, release and deployment
management
-
B. Change management, capacity management event management, service request management
-
C. Service level management, service portfolio management, service asset and configuration
management
-
D. Service asset and configuration management, release and deployment management, request
fulfillment
Frage 53
Frage
Which statement should NOT be part of the value proposition for Service Design?
Antworten
-
A. Reduced total cost of ownership
-
B. Improved quality of service
-
C. Improved Service alignment with business goals
-
D. Better balance of technical skills to support live services
Frage 54
Frage
Which process would be used to compare the value that newer services have offered over those they
have replaced?
Antworten
-
A. Availability management
-
B. Capacity management
-
C. Service portfolio management
-
D. Service catalogue management
Frage 55
Frage
Consider the following list:
1. Change authority
2. Change manager
3. Change advisory board (CAB)
Which one of the following is the BEST description of the items above?
Frage 56
Frage
Hierarchic escalation is BEST described as?
Antworten
-
A. Notifying more senior levels of management about an incident
-
B. Passing an incident to people with a greater level of technical skill
-
C. Using more senior specialists than necessary to resolve an Incident to maintain customer
satisfaction
-
D. Failing to meet the incident resolution times specified in a service level agreement
Frage 57
Frage
Which one of the following functions would be responsible for the management of a data center?
Frage 58
Frage
Which one of the following would be the MOST useful in helping to define roles and responsibilities in
an organizational structure?
Frage 59
Frage
Which process will regularly analyse incident data to identify discernible trends?
Frage 60
Frage
Which is the correct definition of a customer facing service?
Antworten
-
A. One which directly supports the business processes of customers
-
B. A service that cannot be allowed to fail
-
C. One which is not covered by a service level agreement
-
D. A service not directly used by the business
Frage 61
Frage
Which one of the following is the BEST definition of the term service management?
Antworten
-
A. A set of specialized organizational capabilities for providing value to customers in the form of
services
-
B. A group of interacting, interrelated, or independent components that form a unified whole,operating
together for a common purpose
-
C. The management of functions within an organization to perform certain activities
-
D. Units of organizations with roles to perform certain activities
Frage 62
Frage
Which of the following is NOT a valid objective of problem management?
Antworten
-
A. To prevent problems and their resultant Incidents
-
B. To manage problems throughout their lifecycle
-
C. To restore service to a user
-
D. To eliminate recurring incidents
Frage 63
Frage
Which one of the following is an objective of service catalogue management?
Antworten
-
A. Negotiating and agreeing service level agreement
-
B. Negotiating and agreeing operational level agreements
-
C. Ensuring that the service catalogue is made available to those approved to access it
-
D. Only ensuring that adequate technical resources are available
Frage 64
Frage
Which of the following statements BEST describes the aims of release and deployment
management?
Antworten
-
A. To build, test and deliver the capability to provide the services specified by service design
-
B. To ensure that each release package specified by service design consists of a set of related assets
and service components
-
C. To ensure that all changes can be tracked, tested and verified if appropriate
-
D. To record and manage deviations, risks and issues related to the new or changed service
Frage 65
Frage
Which one of the following activities are carried out during the "Where do we want to be?" step of the
continual service improvement (CSI) approach?
Antworten
-
A. Implementing service and process improvements
-
B. Reviewing measurements and metrics
-
C. Creating a baseline
-
D. Defining measurable targets
Frage 66
Frage
Which one of the following can help determine the level of impact of a problem?
Antworten
-
A. Definitive media library (DML)
-
B. Configuration management system (CMS)
-
C. Statement of requirements (SOR)
-
D. Standard operating procedures (SOP)
Frage 67
Frage
The effective management of risk requires specific types of action. Which of the following pairs of
actions would be BEST to manage risk?
Antworten
-
A. Training in risk management for all staff and identification of risks
-
B. Identification of risk, analysis and management of the exposure to risk
-
C. Control of exposure to risk and investment of capital
-
D. Training of all staff and investment of capital
Frage 68
Frage
Which of the following is an enabler of best practice?
Antworten
-
A. Standards
-
B. Technology
-
C. Academic research
-
D. Internal experience
Frage 69
Frage
Service design emphasizes the importance of the "Four Ps". These "Four Ps" include
Partners,People, Processes and one other "P". Which of the following is the additional "P"?
Antworten
-
A. Profit
-
B. Preparation
-
C. Products
-
D. Potential
Frage 70
Frage
Which of the following is NOT one of the five individual aspects of service design?
Antworten
-
A. The design of the service portfolio, including the service catalogue
-
B. The design of new or changed services
-
C. The design of market spaces
-
D. The design of the technology architectures
Frage 71
Frage
Where would you expect incident resolution targets to be documented?
Frage 72
Frage
Which of the following provide value to the business from service strategy?
1. Enabling the service provider to have a clear understanding of what levels of service will make their
customer's successful
2. Enabling the service provider to respond quickly and effectively to changes in the business
environment
3. Reduction in the duration and frequency of service outages
Antworten
-
A. All of the above
-
B. 1 and 3 only
-
C. 1 and 2 only
-
D. 2 and 3 only
Frage 73
Frage
What are the categories of event described in the ITIL service operation book?
Antworten
-
A. Informational, scheduled, normal
-
B. Scheduled, unscheduled, emergency
-
C. Informational, warning, exception
-
D. Warning, reactive, proactive
Frage 74
Frage
A process owner is responsible for which of the following?
1. Defining the process strategy
2. Assisting with process design
3. Improving the process
4. Performing all activities involved in a process
Antworten
-
A. 2, 3 and 4 only
-
B. All of the above
-
C. 1, 2 and 3 only
-
D. 1, 2 and 4 only
Frage 75
Frage
Which one of the following is concerned with policy and direction?
Frage 76
Frage
Which of the following should be considered when designing measurement systems, methods and
metrics?
1. The services
2. The architectures
3. The configuration items
4. The processes
Antworten
-
A. 1, 2 and 3 only
-
B. 1, 3 and 4 only
-
C. 2, 3 and 4 only
-
D. All of the above
Frage 77
Frage
Which of the following is the best definition of IT service management?
Antworten
-
A. An internal service provider that is embedded within a business unit
-
B. A complete set of all the documentation required to deliver world class services to customers
-
C. Technical implementation of supporting IT infrastructure components
-
D. The implementation and management of quality IT services that meet business needs
Frage 78
Frage
Which of the following is service transition planning and support NOT responsible for?
Antworten
-
A. Prioritizing conflicts for service transition resources
-
B. Coordinating the efforts required to manage multiple simultaneous transitions
-
C. Maintaining policies, standards and models for service transition activities and processes
-
D. Detailed planning of the build and test of individual changes
Frage 79
Frage
What are underpinning contracts used to document?
Antworten
-
A. The provision of IT services or business services by a service provider
-
B. The provision of goods and services by third party suppliers
-
C. Service levels that have been agreed between the internal service provider and their customer
-
D. Metrics and critical success factors (CSFs) for internal support teams
Frage 80
Frage
In which document would you expect to see an overview of actual service achievements again
sttargets?
Antworten
-
A. Operational level agreement (OLA)
-
B. Capacity plan
-
C. Service level agreement (SLA)
-
D. SLA monitoring chart (SLAM)
Frage 81
Frage
Who is responsible for ensuring that the request fulfillment process is being performed according to
the agreed and documented standard?
Antworten
-
A. The IT director
-
B. The process owner
-
C. The service owner
-
D. The customer
Frage 82
Frage
Which process is responsible for ensuring that appropriate testing takes place?
Antworten
-
A. Knowledge management
-
B. Release and deployment management
-
C. Service asset and configuration management
-
D. Service level management
Frage 83
Frage
Which of the following identify the purpose of business relationship management?
1. To establish and maintain a business relationship between service provider and customer
2. To identify customer needs and ensure that the service provider is able to meet
Antworten
-
A. Both of the above
-
B. 1 only
-
C. 2 only
-
D. Neither of the above
Frage 84
Frage
Which of the following is the correct definition of an outcome?
Antworten
-
A. The results specific to the clauses in a service level agreement (SLA)
-
B. The result of carrying out an activity, following a process or delivering an IT service
-
C. All the accumulated knowledge of the service provider
-
D. All incidents reported to the service desk
Frage 85
Frage
Understanding what to measure and why it is being measured are key contributors to which part of
the Service Lifecycle?
Frage 86
Frage
Which process would ensure that utility and warranty requirements are properly addressed in service
designs?
Frage 87
Frage
What would you call the groups of people who have an interest in the activities, targets, resources
and deliverables from service management?
Antworten
-
A. Employers
-
B. Stakeholders
-
C. Regulators
-
D. Accreditors
Frage 88
Frage
What would be the next step in the continual service improvement (CSI) model after?
1. What is the vision?
2. Where are we now?
3. Where do we want to be?
4. How do we get there?
5. Did we get there?
6. ?
Antworten
-
A. What is the return on investment (ROI)?
-
B. How much did it cost?
-
C. How do we keep the momentum going?
-
D. What is the value on investment (VOI)?
Frage 89
Frage
Which statement about the emergency change advisory board (ECAB) is CORRECT?
Antworten
-
A. The ECAB considers every high priority request for change (RFC)
-
B. Amongt the duties of the ECAB is the review of completed emergency changes
-
C. The ECAB will be used for emergency changes where there may not be time to call a full CAB
-
D. The ECAB will be chaired by the IT Director
Frage 90
Frage
Which of the following BEST describes a problem?
Antworten
-
A. An issue reported by a user
-
B. The cause of two or more incidents
-
C. A serious incident which has a critical impact to the business
-
D. The cause of one or more incidents
Frage 91
Frage
Which of the following is NOT a recognized example of a service provider type within the ITIL
framework?
Antworten
-
A. Internal
-
B. External
-
C. Service desk
-
D. Shared services unit
Frage 92
Frage
Which one of the following statements about incident reporting and logging is CORRECT?
Antworten
-
A. Incidents can only be reported by users
-
B. Incidents can be reported by anyone who detects a disruption or potential disruption to normal
service
-
C. All calls to the service desk must be logged as incidents
-
D. Incidents reported by technical staff must also be logged as problems
Frage 93
Frage
Which process is responsible for providing the rights to use an IT service?
Antworten
-
A. Incident management
-
B. Access management
-
C. Change management
-
D. Request fulfillment
Frage 94
Frage
What type of services are NOT directly used by the business but are required by the service provider
to deliver customer facing services?
Antworten
-
A. Business services
-
B. Component services
-
C. Supporting services
-
D. Customer services
Frage 95
Frage
Which of the following areas would technology help to support during the service lifecycle?
1. Data mining and workflow
2. Measurement and reporting
3. Release and deployment
4. Process design
Antworten
-
A. 2, 3 and 4 only
-
B. 1, 3 and 4 only
-
C. 1, 2 and 3 only
-
D. All of the above
Frage 96
Frage
How many people should be accountable for a process as defined in the RACI model?
Antworten
-
A. As many as necessary to complete the activity
-
B. Only one - the process owner
-
C. Two - the process owner and the process enactor
-
D. Only one - the process architect
Frage 97
Frage
The addition, modification or removal of an authorized, planned or supported service or service
component and its associated documentation is a definition of what?
Frage 98
Frage
Where should the following information be stored?
1. The experience of staff
2. Records of user behavior
3. Supplier's abilities and requirements
4. User skill levels
Antworten
-
A. The forward schedule of change
-
B. The service portfolio
-
C. A configuration management database (CMDB)
-
D. The service knowledge management system (SKMS)
Frage 99
Frage
Which of the following statements about standard changes are CORRECT?
1. The approach is pre-authorized
2. The risk is usually low and well understood
3. Details of the change will be recorded
4. Some standard changes will be triggered by the request fulfillment process
Antworten
-
A. 1 only
-
B. 2 and 3 only
-
C. 1, 2 and 4 only
-
D. All of the above
Frage 100
Frage
Which one of the following provides the CORRECT list of processes within the service operation
stage of the service lifecycle?
Antworten
-
A. Event management, incident management, problem management, request fulfillment, and access
management
-
B. Event management, incident management, change management, and access management
-
C. Incident management, problem management, service desk, request fulfillment, and event
management
-
D. Incident management, service desk, request fulfillment, access management, and event
management
Frage 101
Frage
With which process is problem management likely to share categorization and impact coding
systems?
Frage 102
Frage
What guidance does ITIL give on the frequency of production of service reporting?
Antworten
-
A. Service reporting intervals must be defined and agreed with the customers
-
B. Reporting intervals should be set by the service provider
-
C. Reports should be produced weekly
-
D. Service reporting intervals must be the same for all services
Frage 103
Frage
Which one of the following does service metrics measure?
Frage 104
Frage
Which one of the following is NOT a valid purpose or objective of problem management?
Antworten
-
A. To prevent problems and resultant incidents
-
B. To manage problems throughout their lifecycle
-
C. To restore service to a user
-
D. To eliminate recurring incidents
Frage 105
Frage
Which process is responsible for low risk, frequently occurring, low cost changes?
Frage 106
Frage
Which function or process would provide staff to monitor events in an operations bridge?
Frage 107
Frage
Which of the following activities are performed by a service desk?
1. Logging details of incidents and service requests
2. Providing first-line investigation and diagnosis
3. Restoring service
4. Implementing all standard changes
Antworten
-
A. All of the above
-
B. 1, 2 and 3 only
-
C. 2 and 4 only
-
D. 3 and 4 only
Frage 108
Frage
Which of the following is NOT an objective of Continual Service Improvement?
Antworten
-
A. Review and analyze Service Level Achievement results
-
B. Identify activities to improve the efficiency of service management processes
-
C. Improve the cost effectiveness of IT services without sacrificing customer satisfaction
-
D. Conduct activities to deliver and manage services at agreed levels to business users
Frage 109
Frage
Check, Act and Plan are three of the stages of the Deming Cycle. Which is the fourth?
Antworten
-
A. Do
-
B. Perform
-
C. Implement
-
D. Measure
Frage 110
Frage
What are the three types of metrics that an organization should collect to support continual service
improvement (CSI)?
Antworten
-
A. Return on investment (ROI), value on investment (VOI), quality
-
B. Strategic, tactical and operational
-
C. Critical success factors (CSFs), key performance indicators (KPIs), activities
-
D. Technology, process and service
Frage 111
Frage
Which of the following are classed as stakeholders in service management?
1. Customers
2. Users
Antworten
-
A. All of the above
-
B. 1 and 3 only
-
C. 1 and 2 only
-
D. 2 and 3 only
Frage 112
Frage
From the perspective of the service provider, what is the person or group who defines or and agrees
their service targets known as?
Antworten
-
A. User
-
B. Customer
-
C. Supplier
-
D. Administrator
Frage 113
Frage
Which process is responsible for sourcing and delivering components of requested standard
services?
Frage 114
Frage
Which of the following is the best definition of service management?
Antworten
-
A. The ability to keep services highly available to meet the business needs
-
B. A set of specialized organizational capabilities for providing value to customers in the form of
services
-
C. A complete set of all the documentation required to deliver world class services to customers
-
D. An internationally recognized methodology to provide valuable services to customers
Frage 115
Frage
Which of the following CANNOT be provided by a tool?
Antworten
-
A. Knowledge
-
B. Information
-
C. Wisdom
-
D. Data
Frage 116
Frage
Which one of the following is the purpose of service level management?
Antworten
-
A. To carry out the service operations activities needed to support current IT services
-
B. To ensure that sufficient capacity is provided to deliver the agreed performance of services
-
C. To create and populate a service catalogue
-
D. To ensure that an agreed level of IT service is provided for all current IT services
Frage 117
Frage
Which one of the following activities does application management perform?
Antworten
-
A. Defining where the vendor of an application should be located
-
B. Ensuring that the required functionality is available to achieve the required business outcome
-
C. Deciding who the vendor of the storage devices will be
-
D. Agreeing the service levels for the service supported by the application
Frage 118
Frage
What is a RACI model used for?
Frage 119
Frage
The remediation plan should be evaluated at what point in the change lifecycle?
Antworten
-
A. Before the change is approved
-
B. Immediately after the change has failed and needs to be backed out
-
C. After implementation but before the post implementation review
-
D. After the post implementation review has identified a problem with the change
Frage 120
Frage
Which of the following statements MOST correctly identifies the scope of design coordination
activities?
Antworten
-
A. Only changes that introduce new services
-
B. It is mandatory that all changes are subject to design coordination activity
-
C. Only changes to business critical systems
-
D. Any change that the organization believes could benefit
Frage 121
Frage
What is the PRIMARY process for strategic communication with the service provider's customers?
Antworten
-
A. Service catalogue management
-
B. Service portfolio management
-
C. Service desk
-
D. Business relationship management
Frage 122
Frage
Which one of the following is NOT an aim of the change management process?
Antworten
-
A. To ensure the impact of changes are understood
-
B. To ensure that changes are recorded and evaluated
-
C. To ensure that all changes to configuration items (CIs) are recorded in the configuration
management system (CMS)
-
D. To deliver and manage IT services at agreed levels to business users
Frage 123
Frage
What are customers of IT services who work in the same organization as the service provider known
as?
Antworten
-
A. Strategic customers
-
B. External customers
-
C. Valued customers
-
D. Internal customers
Frage 124
Frage
124. Access management is closely related to which other process?
Frage 125
Frage
In which core ITIL publication can you find detailed descriptions of service catalogue
management,information security management, and supplier management?
Antworten
-
A. Service strategy
-
B. Service design
-
C. Service transition
-
D. Service operation
Frage 126
Frage
Which of the following is the BEST reason for categorizing incidents?
Antworten
-
A. To establish trends for use in problem management and other IT service management
(ITSM)activities
-
B. To ensure service levels are met and breaches of agreements are avoided
-
C. To enable the incident management database to be partitioned for greater efficiency
-
D. To identify whether the user is entitled to log an incident for this particular service
Frage 127
Frage
A known error has been created after diagnosis of a problem was complete but before a work around
has been found. Is this a valid approach?
Antworten
-
A. Yes: for information purposes, a known error record can be created at any time it is prudent to do
so
-
B. No: the Known Error should be created before the problem is logged
-
C. No: a known error record is created when the original incident is raised
-
D. No: a known error record should be created with the next release of the service
Frage 128
Frage
Which of the following provide value to the business from service strategy?
1. Enabling the service provider to have a clear understanding of what levels of service will make their
customers successful
2. Enabling the service provider to respond quickly and effectively to changes in the business
environment
3. Support the creation of a portfolio of quantified services
Antworten
-
A. All of the above
-
B. 1 and 3 only
-
C. 1 and 2 only
-
D. 2 and 3 only
Frage 129
Frage
Which of the following would be examined by a major problem review?
1. Things that were done correctly
2. Things that were done incorrectly
3. How to prevent recurrence
4. What could be done better in the future
Antworten
-
A. 1 only
-
B. 2 and 3 only
-
C. 1, 2 and 4 only
-
D. All of the above
Frage 130
Frage
Which one of the following is the BEST description of a relationship in service asset and configuration
management?
Antworten
-
A. Describes the topography of the hardware
-
B. Describes how the configuration items (CIs) work together to deliver the services
-
C. Defines which software should be installed on a particular piece of hardware
-
D. Defines how version numbers should be used in a release
Frage 131
Frage
Which of the following are sources of best practice?
1. Academic research
2. Internal experience
3. Industry practices
Antworten
-
A. All of the above
-
B. 1 and 3 only
-
C. 1 and 2 only
-
D. 2 and 3 only
Frage 132
Frage
Which of these should a change model include?
1. The steps that should be taken to handle the change
2. Responsibilities; who should do what, including escalation
3. Timescales and thresholds for completion of the actions
4. Complaints procedures
Antworten
-
A. 1, 2 and 3 only
-
B. All of the above
-
C. 1 and 3 only
-
D. 2 and 4 only
Frage 133
Frage
Which one of the following is NOT an objective of problem management?
Antworten
-
A. Minimizing the impact of incidents that cannot be prevented
-
B. Preventing problems and resulting incidents from happening
-
C. Eliminating recurring incidents
-
D. Restoring normal service operation as quickly as possible
Frage 134
Frage
Which of the following statements about service asset and configuration management is/are
CORRECT?
1. A configuration item (CI) can exits as part of any numbers other CIs at the same time
2. Choosing which CIs to record will depend on the level of control an organization wishes to exert.
Antworten
-
A. 1 only
-
B. 2 only
-
C. Both of the above
-
D. Neither of the above
Frage 135
Frage
Which of the following are types of service defined in ITIL?
1. Enabling
2. Core
3. Enhancing
4. Computer
Antworten
-
A. 1, 3 and 4 only
-
B. 2, 3 and 4 only
-
C. 1, 2 and 4 only
-
D. 1, 2 and 3 only
Frage 136
Frage
In which of the following should details of a workaround be documented?
Frage 137
Frage
Which one of the following is NOT a characteristic of a process?
Antworten
-
A. It is measurable
-
B. It delivers specific results
-
C. It responds to specific events
-
D. It structure an organization
Frage 138
Frage
Which one of the following is NOT a responsibility of the service transaction stage of the service
lifecycle?
Antworten
-
A. To ensure that a service managed and operated accordance with constraints specified during
design
-
B. To design and develop capabilities for service management
-
C. To provide good-quality knowledge and information about services
-
D. To plan the resources required to manage a release
Frage 139
Frage
Which of the following BEST describes technical management?
Antworten
-
A. A function responsibilities for facilities management and building control systems
-
B. A function that provides hardware repair services for technology involved in the delivery of service
to customers
-
C. Senior managers responsibilities for all staff within the technical support function
-
D. A function that includes providing technical expertise and overall management of the IT
Frage 140
Frage
Which of the following is not a service desk type recognized in the service operation volume ofITIL?
Antworten
-
A. Local
-
B. Centralized
-
C. Outsourced
-
D. Virtual
Frage 141
Frage
What is the primary focus of the business management?
Antworten
-
A. Management, control and prediction of the performance, utilization and capacity of individual
elements of IT technology
-
B. Review of all capacity supplier agreements and underpinning contracts with supplier management
-
C. Management, control and prediction of the end-to-end performance and capacity of the
live,operational IT services
-
D. Future business requirements for IT services are quantified, designed, planned and implemented
in a timely fashion
Frage 142
Frage
Which process has the purpose to ensure that, by managing the risks which could seriously affect IT
services, the IT service provider can always provide minimum agreed business-related service levels?
Antworten
-
A. Change management
-
B. IT service continuity management
-
C. Financial management for IT services
-
D. Service catalog management
Frage 143
Frage
Which one of the following is the BEST description of a service request?
Antworten
-
A. A request from a user for information, advice or for a standard change
-
B. Anything that the customer wants and is prepared to pay for
-
C. Any request or demand that is entered by a user via a self-help web-based interface
-
D. Any request for change (RFC) that is low-risk and which can be approved by the change manager
without a change advisory board (CAB) meeting
Frage 144
Frage
Which process is involved in monitoring an IT service and detecting when the performance drops
below acceptable limits?
Frage 145
Frage
Which one of the following do major incidents require?
Antworten
-
A. Separate procedures
-
B. Less urgency
-
C. Longer timescales
-
D. Less documentation
Frage 146
Frage
What is the BEST description of the purpose of the service operation stage of the service lifecycle?
Antworten
-
A. To decide how IT will engage with suppliers during the service lifecycle
-
B. To proactively prevent all outages to IT services
-
C. To design and build processes that will meet business needs
-
D. To deliver and manage IT services at agreed levels to business users and customers
Frage 147
Frage
In terms of adding value to the business, which one of the following describes service operations
contribution?
Antworten
-
A. The cost of the service is designed, predicted and validated
-
B. Measures for optimization are identified
-
C. Service value is modeled
-
D. Service value is visible to customers
Frage 148
Frage
Which one of the following are the two primary elements that create value for customers?
Antworten
-
A. Value on investment (VOI) and return on investment (ROI)
-
B. Customer and user satisfaction
-
C. Service requirements and warranty
-
D. Resources and capabilities
Frage 149
Frage
Which one of the following statements BEST describes a definitive media library (DML)?
Antworten
-
A. A secure location where definitive hardware spares are held
-
B. A secure library where definitive authorized versions of all media configuration items (CIs)
arestored and protected
-
C. A database that contains definitions of all media CIs
-
D. A secure library where definitive authorized versions of all software and back-ups are stored and
protected
Frage 150
Frage
Which one of the following is it the responsibility of supplier management to negotiate and agree?
Frage 151
Frage
Which one of the following is NOT a responsibility of the service transition stage of the service
lifecycle?
Antworten
-
A. To ensure that a service can be managed and operated in accordance with constraints specified
during design
-
B. To design and develop capabilities for service management
-
C. To provide good-quality knowledge and information about services
-
D. To plan the resources required to manage a release
Frage 152
Frage
Which of the following are managed by facilities management?
1. Hardware within a data center or computer room
2. Applications
3. Power and cooling equipment
4. Recovery sites
Antworten
-
A. 1, 2 and 3 only
-
B. All of the above
-
C. 1, 3 and 4 only
-
D. 1 and 3 only
Frage 153
Frage
Which stage of the service lifecycle is MOST concerned with defining policies and objectives?
Frage 154
Frage
Which areas of service management can benefit from automation?
1. Design and modeling
2. Reporting
3. Pattern recognition and analysis
4. Detection and monitoring
Antworten
-
A. 1, 2 and 3 only
-
B. 1, 3 and 4 only
-
C. 2, 3 and 4 only
-
D. All of the above
Frage 155
Frage
Which one of the following is the BEST definition of reliability?
Antworten
-
A. The availability of a service or component
-
B. The level of risk that affects a service or process
-
C. How long a service or configuration item (CI) can perform its function without failing
-
D. How quickly a service or component can be restored to normal working order
Frage 156
Frage
Which one of the following is NOT the responsibility of service catalogue management?
Antworten
-
A. Ensuring that information in the service catalogue is accurate
-
B. Ensuring that service level agreements are maintained
-
C. Ensuring that information in the service catalogue is consistent with information in the service
portfolio
-
D. Ensuring that all operational services are recorded in the service catalogue
Frage 157
Frage
Which one of the following is an objective of release and deployment management?
Antworten
-
A. To standardize methods and procedures used for efficient and prompt handling of all changes
-
B. To ensure all changes to service assets and configuration items (CIs) are recorded in the
configuration management system (CMS)
-
C. To ensure that the overall business risk of change is optimized
-
D. To define and agree release and deployment plans with customers and stakeholders
Frage 158
Frage
Which one of the following statements is CORRECT?
Antworten
-
A. The configuration management system is part of the known error database
-
B. The service knowledge management system is part of the configuration management system
-
C. The configuration management system is part of the service knowledge management system
-
D. The configuration management system is part of the configuration management database
Frage 159
Frage
Implementation of ITIL service management requires the preparation and planning of the effective
and efficient use of "the four Ps." What are these four Ps?
Antworten
-
A. People, process, partners, performance
-
B. Performance, process, products, problems
-
C. People, process, products, partners
-
D. People, products, perspective, partners
Frage 160
Frage
Which of the following should IT service continuity strategy be based on?
1. Design of the service metrics
2. Business continuity strategy
3. Business impact analysis (BIA)
4. Risk assessment
Antworten
-
A. 1, 2 and 4 only
-
B. 1, 2 and 3 only
-
C. 2, 3 and 4 only
-
D. 1, 3 and 4 only
Frage 161
Frage
What is the BEST description of an operational level agreement (OLA)?
Antworten
-
A. An agreement between the service provider and another part of the same organization
-
B. An agreement between the service provider and an external organization
-
C. A document that describes to a customer how services will be operated on a day-to-day basis
-
D. A document that describes business services to operational staff
Frage 162
Frage
Which one of the following generates demand for services?
Antworten
-
A. Infrastructure trends
-
B. Patterns of business activity (PBA)
-
C. Cost of providing support
-
D. Service level agreements (SLA)
Frage 163
Frage
Which one of the following is an objective of service transition?
Antworten
-
A. To negotiate service levels for new services
-
B. To ensure that service changes create the expected business value
-
C. To minimize the impact of service outages on day-to-day business activities
-
D. To plan and manage entries in the service catalogue
Frage 164
Frage
Which one of the following is the BEST definition of an event?
Antworten
-
A. Any change of state that has significance for the management of a configuration item (CI) or IT
service
-
B. An unplanned interruption to an IT service or a reduction in the quality of an IT service
-
C. The unknown cause of one or more incidents that have an impact on an IT service
-
D. Reducing or eliminating the cause of an incident or problem
Frage 165
Frage
Which one of the following is the BEST description of the purpose of the service operation stage of
the service lifecycle?
Antworten
-
A. To decide how IT will engage with suppliers during the service lifecycle
-
B. To proactively prevent all outages to IT services
-
C. To design and build processes which will meet business needs
-
D. To deliver and manage IT services at agreed levels to business users and customers
Frage 166
Frage
Which one of the following is the BEST description of a major incident?
Antworten
-
A. An incident which is so complex that it requires root cause analysis before a workaround can be
found
-
B. An incident which requires a large number of people to resolve
-
C. An incident logged by a senior manager
-
D. An incident which has a high priority or a high impact on the business
Frage 167
Frage
Which of the following availability management activities is/are considered to be proactive as opposed
to reactive?
1. Monitoring system availability
2. Designing availability into a proposed solution
Antworten
-
A. None of the above
-
B. Both of the above
-
C. 1 only
-
D. 2 only
Frage 168
Frage
Which one of the following would NOT involve event management?
Antworten
-
A. Intrusion detection
-
B. Recording and monitoring environmental conditions in the data center
-
C. Recording service desk staff absence
-
D. Monitoring the status of configuration items
Frage 169
Frage
The multi-level SLA' is a three-layer structure. Which one of the following layers is NOT part of this
type of SLA?
Antworten
-
A. Customer level
-
B. Service level
-
C. Corporate level
-
D. Configuration level
Frage 170
Frage
Which processes are responsible for the regular review of underpinning contracts?
Antworten
-
A. Supplier management and service level management
-
B. Supplier management and change management
-
C. Availability management and service level management
-
D. Supplier management and availability management
Frage 171
Frage
Which process is responsible for controlling, recording and reporting on the relationships between
components of the IT infrastructure?
Frage 172
Frage
Which one of the following activities is NOT part of the Deming Cycle?
Antworten
-
A. Act
-
B. Plan
-
C. Do
-
D. Co-ordinate
Frage 173
Frage
Which one of the following is the BEST description of a service level agreement (SLA)?
Antworten
-
A. The part of a contract that specifies the responsibilities of each party
-
B. An agreement between the service provider and an internal organization
-
C. An agreement between a service provider and an external supplier
-
D. An agreement between the service provider and their customer
Frage 174
Frage
Which of the following is an objective/are objectives of the service strategy stage of the service
lifecycle?
1. Providing an understanding of what strategy is
2. Ensuring a working relationship between the customer and service provider
3. Defining how value is created
Antworten
-
A. 1 only
-
B. 2 only
-
C. 3 only
-
D. All of the above
Frage 175
Frage
In which of the following areas would ITIL complementary guidance provide assistance?
1. Adapting best practice for specific industry sectors
2. Integrating ITIL with other operating models
Antworten
-
A. Both of the above
-
B. Neither of the above
-
C. Option 1 only
-
D. Option 2 only
Frage 176
Frage
Which one of the following is the BEST description of a service-based service level agreement (SLA)?
Antworten
-
A. An agreement with an individual customer group, covering all the services that they use
-
B. An agreement that covers one service for a single customer
-
C. An agreement that covers service specific issues in a multi-level SLA structure
-
D. An agreement that covers one service for all customers of that service
Frage 177
Frage
Which one of the following activities would be performed by access management?
Antworten
-
A. Providing physical security for staff at data centers and other buildings
-
B. Managing access to computer rooms and other secure locations
-
C. Managing access to the service desk
-
D. Managing the rights to use a service or group of services
Frage 178
Frage
Which one of the following provides the CORRECT list of processes within the service operation
stage of the service lifecycle?
Antworten
-
A. Event management, incident management, problem management, request fulfillment, and access
management
-
B. Event management, incident management, change management, and access management
-
C. Incident management, problem management, service desk, request fulfillment, and event
management
-
D. Incident management, service desk, request fulfillment, access management, and
eventmanagement
Frage 179
Frage
Which of the following activities are performed by a desk?
1. Logging details of incidents and service requests
2. Providing first-line investigation and diagnosis
3. Restoring service
4. Implementing all standard changes
Antworten
-
A. All of the above
-
B. 1, 2 and 3 only
-
C. 2 and 4 only
-
D. 3 and 4 only
Frage 180
Frage
Who is responsible for defining metrics for change management?
Antworten
-
A. The change management process owner
-
B. The change advisory board (CAB)
-
C. The service owner
-
D. The continual service improvement manager
Frage 181
Frage
Which of the following are within the scope of service asset and configuration management?
1. Identification of configuration items (CIs)
2. Recording relationships between CIs
3. Recording and control of virtual CIs
4. Approving finance for the purchase of software to support service asset and configuration
management
Antworten
-
A. 1, 2 and 3 only
-
B. All of the above
-
C. 1, 2 and 4 only
-
D. 3 and 4 only
Frage 182
Frage
Looking for ways to improve process efficiency and cost effectiveness is a purpose of which part of
the service lifecycle?
Frage 183
Frage
Which stage of the continual service improvement (CSI) approach is BEST described by the phrase
'Understand and agree on the priorities for improvement based on a deeper development of the
principles defined in the vision'?
Frage 184
Frage
Which of the following processes contributes MOST to quantifying the financial value of IT services to
the business?
Frage 185
Frage
Which of the following is the BEST description of a service-based service level agreement (SLA)?
Antworten
-
A. The SLA covers one service, for all the customers of that service
-
B. The SLA covers an individual customer group for all services they use
-
C. An SLA that covers all customers for all services
-
D. An SLA for a service with no customers
Frage 186
Frage
Which of the following is NOT a source of best practice?
Antworten
-
A. Standards
-
B. Technology
-
C. Academic research
-
D. Internal experience
Frage 187
Frage
What is a service delivered between two business units in the same organization known as?
Antworten
-
A. Strategic service
-
B. Delivered service
-
C. Internal service
-
D. External service
Frage 188
Frage
What is the act of transforming resources and capabilities into valuable service better known as?
Antworten
-
A. Service management
-
B. Incident management
-
C. Resource management
-
D. Service support
Frage 189
Frage
From the perspective of the service provider, who is the person or group that agrees their service
targets?
Antworten
-
A. The user
-
B. The customer
-
C. The supplier
-
D. The administrator
Frage 190
Frage
Which of the following identifies the purpose of service transition planning and support?
Antworten
-
A. Provide overall planning for service transitions and co-ordinate the resources they require
-
B. Ensure that all service transitions are properly authorized
-
C. Provide the resources to allow all infrastructure elements of a service transition to be recorded and
tracked
-
D. To define testing scripts to ensure service transitions are unlikely to ever fail
Frage 191
Frage
Which process would maintain policies, standards and models for service transition activities
and processes?
Frage 192
Frage
Which of the following identifies the purpose of design coordination?
Antworten
-
A. Provide a single point of control for all activities and processes within the service design stage of
the lifecycle
-
B. Ensuring all service designs have availability designed into them
-
C. Designing of all the links between every service design process and all other processes in the
service lifecycle
-
D. Control of all supplier relationships from design right through to the production environment
Frage 193
Frage
Which process has the following objective, 'Produce service design packages (SDPs) based on
service charters and change requests'?
Frage 194
Frage
Which of the following activities would be performed by a process manager?
1. Monitoring and reporting on process performance
2. Identifying improvement opportunities
3. Appointing people to required roles
Antworten
-
A. All of the above
-
B. 1 and 3 only
-
C. 1 and 2 only
-
D. 2 and 3 only
Frage 195
Frage
Which role is accountable for the operational management of a process?
Antworten
-
A. Process practitioner
-
B. Process manager
-
C. Service manager
-
D. Change manager
Frage 196
Frage
Which of the following statements is CORRECT for every process?
1. It delivers its primary results to a customer or stakeholder
2. It defines activities that are executed by a single function
Antworten
-
A. Both of the above
-
B. 1 only
-
C. Neither of the above
-
D. 2 only
Frage 197
Frage
Which of the following should be done when closing an incident?
1. Check the incident categorization and correct it if necessary
2. Check that the user is satisfied with the outcome
Antworten
-
A. 1 only
-
B. Both of the above
-
C. 2 only
-
D. Neither of the above
Frage 198
Frage
Which of the following is NOT an objective of request fulfillment?
Antworten
-
A. To provide information to users about what services are available and how to request them
-
B. To update the service catalogue with services that may be requested through the service desk
-
C. To provide a channel for users to request and receive standard services
-
D. To source and deliver the components of standard services that have been requested
Frage 199
Frage
Which process would you MOST expect to be involved in the management of under pinning
contracts?
Frage 200
Frage
Which of the following are valid parts of the service portfolio?
1. Service pipeline
2. Service knowledge management system (SKMS)
3. Service catalogue
Antworten
-
A. 1 and 2 only
-
B. 3 only
-
C. 1 and 3 only
-
D. All of the above