GB Mock Exam

Beschreibung

Goconqr Exam
Oliver Spencer
Quiz von Oliver Spencer, aktualisiert more than 1 year ago
Oliver Spencer
Erstellt von Oliver Spencer vor etwa 9 Jahre
85
0

Zusammenfassung der Ressource

Frage 1

Frage
Which of the following items is part of a team charter, developed in the Define step?
Antworten
  • The solution
  • The root cause
  • A Problem / Goal Statement

Frage 2

Frage
Which of the following techniques is most likely to help you in the first step within Improve where you are identifying all potential solutions?
Antworten
  • Priority based matrix
  • Paired comparisons
  • Random Words

Frage 3

Frage
You have been asked to measure the queuing time for customers at the branch of a bank. Which of the following sampling options will be most appropriate.?
Antworten
  • Measure all day, every day for the first week of the next month
  • Measure each morning every day for the first two weeks of the next month
  • Measure for a period of 10 minutes in every hour for the next month

Frage 4

Frage
Which of the following is a measure of process capability?
Antworten
  • FMEA
  • QFD
  • Cp

Frage 5

Frage
If the team fails to spend time in the Control phase of DMAIC which of these is most likely to occur?
Antworten
  • The team will have the wrong composition
  • The process improvement will not be maintained
  • The wrong root cause will be identified

Frage 6

Frage
Which of the following tools would be most appropriate to display ongoing cycle time performance in the credit dispatch process?
Antworten
  • Scatter diagram
  • Histogram
  • Pareto
  • X-moving R control chart

Frage 7

Frage
If a process is in statistical control:
Antworten
  • It is meeting the CTQs
  • It is stable and predictable
  • There are special causes present

Frage 8

Frage
The stakeholder analysis
Antworten
  • Is used mainly in the Define phase
  • Is used mainly in the Measure phase
  • Is used mainly in the Improve phase
  • Should be reviewed throughout the project and updated accordingly

Frage 9

Frage
Guage R and R stands for:
Antworten
  • Roles and Responsibilities
  • Repeatability and Reproducibility
  • Rolls Royce
  • Reliability and Regularity

Frage 10

Frage
We set the control limits around +/-3 standard deviations because:
Antworten
  • 99.73 of data will fall within this so it is unlikely a point will naturally fall outside
  • Operating at three sigma is good enough for most processes
  • Motorolla identified a 1.5 sigma shift in either direction.

Frage 11

Frage
Using the XmR Control Charts, calculate the control limits for X, where the mean of the first 20 data points is 25, and the mean for the moving range is 3.5. Give your answer rounded to 2 decimal places. Please use this format 00.00 UCLx = [blank_start]34.31[blank_end]
Antworten
  • 34.31

Frage 12

Frage
Using the XmR Control Charts, calculate the control limits for X, where the mean of the first 20 data points is 25, and the mean for the moving range is 3.5. Give your answer rounded to 2 decimal places. Please use this format 00.00 LCLx = [blank_start]15.69[blank_end]
Antworten
  • 15.69

Frage 13

Frage
The difference between defects and defectives is:
Antworten
  • There is no difference
  • A defect identifies a failure to meet a CTQ whereas a defective identifies a unit which may contain several defects
  • A defect is an error made by us whereas a defective is an error made by the customer

Frage 14

Frage
If you have a severity rating of 6, an occurrence rating of 5 and a detection rating of 6, what is your RPN? RPN = [blank_start]180[blank_end]
Antworten
  • 180

Frage 15

Frage
The key output of Analyse is:
Antworten
  • A solution to the problem
  • The vital few root causes
  • A response plan

Frage 16

Frage
One use of sigma measures is to:
Antworten
  • Understand if there is a correlation between the X and the Y
  • Understand how well different processes perform
  • Identify the type of variation in the process

Frage 17

Frage
Which of the following steps are Customer value added (identify all)?
Antworten
  • Take order
  • Transfer order onto suppliers database
  • Check the address is correct
  • Ring the customer to obtain missing information
  • Deliver order
  • Copy the signed order to accounts

Frage 18

Frage
Gauge R and R is:
Antworten
  • A way of predicting what will go wrong with a project
  • An indicator of measure system reliability
  • The method used to determine R squared

Frage 19

Frage
Continuous data:
Antworten
  • is less data rich than attribute data
  • Will need a smaller sample size than attribute data
  • Cannot be used in a scatter diagram

Frage 20

Frage
Calculate the sigma value for the following process where: The number of units process is 250, the number of defects is 106 and there are 2 defect opportunities per unit. (Answer to 1 decimal point) Sigma Value = [blank_start]2.3[blank_end]
Antworten
  • 2.3

Frage 21

Frage
What is the mean of this data set: ( 3, 5, 7, 18, 11, 6, 18, 6, 12, 8) Please use the format 0.0 Mean = [blank_start]9.4[blank_end]
Antworten
  • 9.4

Frage 22

Frage
An Xbar R chart is used:
Antworten
  • For attribute data
  • For data with varying sample sizes plus the range
  • For plotting the means and ranges of subgrouped samples

Frage 23

Frage
The most important CTQs are derived from:
Antworten
  • Your manager or team leader
  • Last years performance + 10%
  • Beating your competitors performance
  • The external customer

Frage 24

Frage
The correlation co-efficient:
Antworten
  • Helps validate your ideas about the vital few root causes
  • Identified the difference between the performance in 2 teams
  • Confirms whether an improvement initiative has worked
  • Is either zero or a positive number

Frage 25

Frage
A full factoral experiment with 2 levels and 5 factors will require? Number of runs = [blank_start]32[blank_end]
Antworten
  • 32

Frage 26

Frage
A process has been analysed and the temperature measured with a mean of 104.5. The upper control limit is 131 and the lower control limit is 76. The process is in control. Assuming the CTQ is a temperature range between 68 and 130 – how would you describe the “state of the process”?
Antworten
  • Ideal (meets CTQ and in control)
  • Threshold (not meeting the CTQ and in control)
  • On the brink (meeting the CTQ but out of control)
  • Chaos (not meeting CTQ and out of control)

Frage 27

Frage
Which of the following would usually indicate natural (common cause) variation?
Antworten
  • A point outside the control limits
  • An increasing trend over time
  • Usual small variations in data between the control limits

Frage 28

Frage
Which of the following is a continuous measure?
Antworten
  • Day of the week a service is completed
  • The type of defect
  • Cycle time to complete the service

Frage 29

Frage
Scope creep is often a problem with projects. Which of these tools would NOT help manage it?
Antworten
  • Tollgate reviews
  • SIPOC
  • ANOVA
  • In/Out of Frame

Frage 30

Frage
Histograms which two or humps suggest?
Antworten
  • There is an error in the data collection
  • Segmentation would be useful
  • Data transformation is needed

Frage 31

Frage
To move our client from dissatisfied to satisfied which of these requirements will be of LEAST importance?
Antworten
  • Dissatisfiers
  • Satisfiers
  • Delighters

Frage 32

Frage
When you make a change in a process to improve performance should you expect the process initially to:
Antworten
  • Stay in control
  • Go out of control

Frage 33

Frage
In the scatter diagram the vertical axis is:
Antworten
  • The cause
  • The effect

Frage 34

Frage
When analyzing Voice of the Customer data to derive CTQs which of the following tools is LEAST likely to be useful?
Antworten
  • Affinity diagram
  • Tree diagram
  • Kano model
  • Theory of constraints

Frage 35

Frage
Another way to describe cause and effect is?
Antworten
  • Y’s and X’s
  • P’s and Q’s
  • X’s and Y’s

Frage 36

Frage
SIPOC is a clear deliverable of which DMAIC phase (select 1)?
Antworten
  • Define
  • Measure
  • Analyse
  • Improve
  • Control

Frage 37

Frage
A display of data in a time sequence is called?
Antworten
  • A histogram
  • A pie chart
  • A run chart
  • A scatter diagram

Frage 38

Frage
Histograms are used to:
Antworten
  • Display the distribution of historical process data
  • Identify special cause variation
  • Display a time series plot

Frage 39

Frage
CTQs should be expressed in a format that?
Antworten
  • Is clearly measurable
  • Contains the solution
  • Represents the voice of the process

Frage 40

Frage
The Risk Priority Number applies to:
Antworten
  • Priority based matrix
  • Force Field analysis
  • Scatter diagram
  • FMEA

Frage 41

Frage
A sample must be:
Antworten
  • Representative
  • Large
  • Segmented

Frage 42

Frage
Poke Yoke is about:
Antworten
  • Identifying what is important to a customer
  • Inspection
  • Prevention
  • The 80:20 rule

Frage 43

Frage
The sampling formula n = 2s/dy)² gives a confidence level of:
Antworten
  • 99%
  • 95%
  • 99.9996%
  • 66%

Frage 44

Frage
The upper and lower control limits on a control chart are derived from:
Antworten
  • The customer specification and CTQs
  • The targets set by management
  • The actual process data

Frage 45

Frage
Which of the following techniques is a form of hypothesis testing?
Antworten
  • Fishbone
  • R&R
  • ANOVA
  • Pareto

Frage 46

Frage
Operational Definitions help ensure:
Antworten
  • Consistent measurement
  • An accurate team charter
  • A comprehensive SIPOC

Frage 47

Frage
Which of the following statements best describes DPMO?
Antworten
  • Defects per manufacturing operation and is a lean measure of waste
  • Defects per million opportunities and is a lean measure of value add
  • Defects per manufacturing operation and is often referred to as parts per million
  • Defects per million opportunities and is a six sigma measure of process capability

Frage 48

Frage
If a company is operating at 2 sigma, what percentage of its customers are experiencing defects?
Antworten
  • Approx. 10%
  • Approx. 20%
  • Approx. 30%
  • Approx. 70%

Frage 49

Frage
A process is:
Antworten
  • A series of steps and actions that produce an output
  • A one of task
  • Only applicable to manufacturing organisations
Zusammenfassung anzeigen Zusammenfassung ausblenden

ähnlicher Inhalt

The SAT Math test essentials list
lizcortland
How to improve your SAT math score
Brad Hegarty
RE Keywords - Paper 1 - Religion and life
Kerris Linney
IT - The Online World
Summir
Quick tips to improve your Exam Preparation
James Timpson
LOGARITHMS
pelumi opabisi
Flashcards for CPXP exam
Lydia Elliott, Ed.D
History- Home Front WW1
jessmitchell
Revision Timetable
katy.lay
GCSE Biology, Module B4
jessmitchell
Mind Maps with GoConqr
Manikandan Achan