Frage 1
Frage
Which of the following items is part of a team charter, developed in the Define step?
Frage 2
Frage
Which of the following techniques is most likely to help you in the first step within Improve where you are identifying all potential solutions?
Antworten
-
Priority based matrix
-
Paired comparisons
-
Random Words
Frage 3
Frage
You have been asked to measure the queuing time for customers at the branch of a bank. Which of the following sampling options will be most appropriate.?
Antworten
-
Measure all day, every day for the first week of the next month
-
Measure each morning every day for the first two weeks of the next month
-
Measure for a period of 10 minutes in every hour for the next month
Frage 4
Frage
Which of the following is a measure of process capability?
Frage 5
Frage
If the team fails to spend time in the Control phase of DMAIC which of these is most likely to occur?
Antworten
-
The team will have the wrong composition
-
The process improvement will not be maintained
-
The wrong root cause will be identified
Frage 6
Frage
Which of the following tools would be most appropriate to display ongoing cycle time performance in the credit dispatch process?
Antworten
-
Scatter diagram
-
Histogram
-
Pareto
-
X-moving R control chart
Frage 7
Frage
If a process is in statistical control:
Frage 8
Frage
The stakeholder analysis
Antworten
-
Is used mainly in the Define phase
-
Is used mainly in the Measure phase
-
Is used mainly in the Improve phase
-
Should be reviewed throughout the project and updated accordingly
Frage 9
Frage
Guage R and R stands for:
Antworten
-
Roles and Responsibilities
-
Repeatability and Reproducibility
-
Rolls Royce
-
Reliability and Regularity
Frage 10
Frage
We set the control limits around +/-3 standard deviations because:
Antworten
-
99.73 of data will fall within this so it is unlikely a point will naturally fall outside
-
Operating at three sigma is good enough for most processes
-
Motorolla identified a 1.5 sigma shift in either direction.
Frage 11
Frage
Using the XmR Control Charts, calculate the control limits for X, where the mean of the first 20 data points is 25, and the mean for the moving range is 3.5. Give your answer rounded to 2 decimal places. Please use this format 00.00
UCLx = [blank_start]34.31[blank_end]
Frage 12
Frage
Using the XmR Control Charts, calculate the control limits for X, where the mean of the first 20 data points is 25, and the mean for the moving range is 3.5. Give your answer rounded to 2 decimal places. Please use this format 00.00
LCLx = [blank_start]15.69[blank_end]
Frage 13
Frage
The difference between defects and defectives is:
Frage 14
Frage
If you have a severity rating of 6, an occurrence rating of 5 and a detection rating of 6, what is your RPN?
RPN = [blank_start]180[blank_end]
Frage 15
Frage
The key output of Analyse is:
Frage 16
Frage
One use of sigma measures is to:
Antworten
-
Understand if there is a correlation between the X and the Y
-
Understand how well different processes perform
-
Identify the type of variation in the process
Frage 17
Frage
Which of the following steps are Customer value added (identify all)?
Antworten
-
Take order
-
Transfer order onto suppliers database
-
Check the address is correct
-
Ring the customer to obtain missing information
-
Deliver order
-
Copy the signed order to accounts
Frage 18
Antworten
-
A way of predicting what will go wrong with a project
-
An indicator of measure system reliability
-
The method used to determine R squared
Frage 19
Antworten
-
is less data rich than attribute data
-
Will need a smaller sample size than attribute data
-
Cannot be used in a scatter diagram
Frage 20
Frage
Calculate the sigma value for the following process where:
The number of units process is 250, the number of defects is 106 and there are 2 defect opportunities per unit. (Answer to 1 decimal point)
Sigma Value = [blank_start]2.3[blank_end]
Frage 21
Frage
What is the mean of this data set: ( 3, 5, 7, 18, 11, 6, 18, 6, 12, 8) Please use the format 0.0
Mean = [blank_start]9.4[blank_end]
Frage 22
Frage
An Xbar R chart is used:
Frage 23
Frage
The most important CTQs are derived from:
Antworten
-
Your manager or team leader
-
Last years performance + 10%
-
Beating your competitors performance
-
The external customer
Frage 24
Frage
The correlation co-efficient:
Antworten
-
Helps validate your ideas about the vital few root causes
-
Identified the difference between the performance in 2 teams
-
Confirms whether an improvement initiative has worked
-
Is either zero or a positive number
Frage 25
Frage
A full factoral experiment with 2 levels and 5 factors will require?
Number of runs = [blank_start]32[blank_end]
Frage 26
Frage
A process has been analysed and the temperature measured with a mean of 104.5. The upper control limit is 131 and the lower control limit is 76. The process is in control. Assuming the CTQ is a temperature range between 68 and 130 – how would you describe the “state of the process”?
Antworten
-
Ideal (meets CTQ and in control)
-
Threshold (not meeting the CTQ and in control)
-
On the brink (meeting the CTQ but out of control)
-
Chaos (not meeting CTQ and out of control)
Frage 27
Frage
Which of the following would usually indicate natural (common cause) variation?
Antworten
-
A point outside the control limits
-
An increasing trend over time
-
Usual small variations in data between the control limits
Frage 28
Frage
Which of the following is a continuous measure?
Frage 29
Frage
Scope creep is often a problem with projects. Which of these tools would NOT help manage it?
Antworten
-
Tollgate reviews
-
SIPOC
-
ANOVA
-
In/Out of Frame
Frage 30
Frage
Histograms which two or humps suggest?
Antworten
-
There is an error in the data collection
-
Segmentation would be useful
-
Data transformation is needed
Frage 31
Frage
To move our client from dissatisfied to satisfied which of these requirements will be of LEAST importance?
Antworten
-
Dissatisfiers
-
Satisfiers
-
Delighters
Frage 32
Frage
When you make a change in a process to improve performance should you expect the process initially to:
Antworten
-
Stay in control
-
Go out of control
Frage 33
Frage
In the scatter diagram the vertical axis is:
Frage 34
Frage
When analyzing Voice of the Customer data to derive CTQs which of the following tools is LEAST likely to be useful?
Antworten
-
Affinity diagram
-
Tree diagram
-
Kano model
-
Theory of constraints
Frage 35
Frage
Another way to describe cause and effect is?
Antworten
-
Y’s and X’s
-
P’s and Q’s
-
X’s and Y’s
Frage 36
Frage
SIPOC is a clear deliverable of which DMAIC phase (select 1)?
Antworten
-
Define
-
Measure
-
Analyse
-
Improve
-
Control
Frage 37
Frage
A display of data in a time sequence is called?
Antworten
-
A histogram
-
A pie chart
-
A run chart
-
A scatter diagram
Frage 38
Frage
Histograms are used to:
Antworten
-
Display the distribution of historical process data
-
Identify special cause variation
-
Display a time series plot
Frage 39
Frage
CTQs should be expressed in a format that?
Frage 40
Frage
The Risk Priority Number applies to:
Antworten
-
Priority based matrix
-
Force Field analysis
-
Scatter diagram
-
FMEA
Frage 41
Antworten
-
Representative
-
Large
-
Segmented
Frage 42
Frage
Poke Yoke is about:
Frage 43
Frage
The sampling formula n = 2s/dy)² gives a confidence level of:
Frage 44
Frage
The upper and lower control limits on a control chart are derived from:
Frage 45
Frage
Which of the following techniques is a form of hypothesis testing?
Antworten
-
Fishbone
-
R&R
-
ANOVA
-
Pareto
Frage 46
Frage
Operational Definitions help ensure:
Antworten
-
Consistent measurement
-
An accurate team charter
-
A comprehensive SIPOC
Frage 47
Frage
Which of the following statements best describes DPMO?
Antworten
-
Defects per manufacturing operation and is a lean measure of waste
-
Defects per million opportunities and is a lean measure of value add
-
Defects per manufacturing operation and is often referred to as parts per million
-
Defects per million opportunities and is a six sigma measure of process capability
Frage 48
Frage
If a company is operating at 2 sigma, what percentage of its customers are experiencing defects?
Antworten
-
Approx. 10%
-
Approx. 20%
-
Approx. 30%
-
Approx. 70%
Frage 49