Chapter 3 - CTFL ISTQB

Beschreibung

Quiz am Chapter 3 - CTFL ISTQB, erstellt von America LH am 06/06/2022.
America LH
Quiz von America LH, aktualisiert more than 1 year ago
America LH
Erstellt von America LH vor mehr als 2 Jahre
212
0

Zusammenfassung der Ressource

Frage 1

Frage
Which of the following is a correct definition of a review?
Antworten
  • The review is mostly a manual activity in which work products like requirements, code, and design are reviewed in order to find defects in them
  • The review is an automated activity in which work products like requirements, code, and design are reviewed in order to find defects in them
  • The review is an automated activity in which the code is reviewed in order to find warnings and errors in it

Frage 2

Frage
Which of the following is correct?
Antworten
  • Reviews rely on the manual examination of work products while static analysis is tool-driven
  • Static analysis relies on the manual examination of work products while reviews are tool-driven
  • Both reviews and static analysis are tool-driven

Frage 3

Frage
What is the difference between warning and errors in the code?
Antworten
  • Code can run without solving errors, but it can't run without solving warnings
  • Code can run without solving warnings, but it can't run without solving errors
  • All warnings and errors must be solved before running the code

Frage 4

Frage
Which of the following is correct regarding static analysis? 1-Static analysis is an important part of security testing 2-Static analysis is used only in sequential lifecycle models 3-Static analysis is important for safety-critical computer systems
Antworten
  • 1 & 2 are correct; 3 is wrong
  • 1 & 3 are correct; 2 is wrong
  • 2 & 3 are correct; 1 is wrong

Frage 5

Frage
When we find a defect in requirements or design, this will cost (...) finding the same defect in production.
Antworten
  • more than
  • less than
  • the same as

Frage 6

Frage
If we want to categorize the reviews into two types, they would be:
Antworten
  • static and dynamic review
  • experience-based and metrics-based review
  • formal and informal review

Frage 7

Frage
Which of the following are the correct steps of the review process?
Antworten
  • Planning, monitoring, analysis, design and executing
  • Planning, initial review, technical review, checklist based and roles
  • Planning, initial review, individual review, issue communication and analysis, and fixing and reporting
  • Planning, initial review, executing, technical review, and fixing and reporting

Frage 8

Frage
Which of the following occurs in the "Planning" step of the review process?
Antworten
  • Distributing the work product
  • Defining scope & estimating effort
  • Noting potential defects

Frage 9

Frage
What is the difference between Entry & Exit criteria in the review process?
Antworten
  • Entry criteria are goals that need to be achieved, while exit criteria are prerequisites that must be met in order to be able to begin our review
  • Entry criteria are prerequisites that must be met in order to be able to begin our review, while exit criteria are goals that need to be achieved

Frage 10

Frage
Which of the following occurs in review process step "Initiate review"?
Antworten
  • Evaluating and documenting quality characteristics
  • Gathering metrics (for more formal review types)
  • Answering any questions that participants may have about the review

Frage 11

Frage
Reviewing all or part of the work product, noting potential defects and questions, those activities occur in which step in the review process?
Antworten
  • Initiate review
  • Individual review
  • Planning

Frage 12

Frage
In which step in the review process does this activity happen "Evaluating the review findings against the exit criteria to make a review decision"?
Antworten
  • Fixing and reporting
  • Issue communication and analysis
  • Individual review (i.e., individual preparation)

Frage 13

Frage
In which step in the review process does this activity occur "Accepting the work product when the exit criteria are reached"?
Antworten
  • Issue communication and analysis
  • Individual review
  • Fixing and reporting

Frage 14

Frage
Who is responsible of creating the work product under review?
Antworten
  • Reviewer
  • Manager
  • Author
  • Facilitator

Frage 15

Frage
If we run a review meeting to review the code developed for a mobile application, who is the author in this review meeting?
Antworten
  • The tester
  • The developer
  • The product owner
  • The scrum master

Frage 16

Frage
The person who is responsible for review planning, assigning staff and budget, and monitoring cost-effectiveness is.....
Antworten
  • The reviewer
  • The facilitator
  • The author
  • The manager

Frage 17

Frage
Who is responsible of ensuring that the review meeting is run in an effective way?
Antworten
  • The reviewer
  • The facilitator
  • The manager
  • The author

Frage 18

Frage
One of the roles in the review is the moderator, we also call him...
Antworten
  • Facilitator
  • Author
  • Reviewer

Frage 19

Frage
Who takes the overall responsibility of the review?
Antworten
  • The scribe
  • The author
  • The moderator
  • The review leader

Frage 20

Frage
Who is responsible of collating potential defects found during the individual review activity?
Antworten
  • The moderator
  • The scribe
  • The author
  • The reviewer

Frage 21

Frage
Which review types aims at quickly solving minor problems?
Antworten
  • Pairing
  • Walkthrough
  • Technical Review
  • Inspection

Frage 22

Frage
The informal review is also called "buddy check" because it is performed by...
Antworten
  • a college of the facilitator
  • a college of the author
  • a college of the review leader

Frage 23

Frage
The main purposes of ….. review type include: improving the software product, considering alternative implementations and finding defects.
Antworten
  • Formal
  • Informal
  • Walkthrough
  • Technical

Frage 24

Frage
In the ‘’Walkthrough’’ review type the…. is mandatory and the leader of the review meeting is the...
Antworten
  • Scribe / Author of the work product
  • Moderator / Facilitator
  • Manager / Reviewer
  • Scribe / Moderator

Frage 25

Frage
The purposes of... review type include: detecting potential defects, evaluating quality and building confidence in the work product, preventing future similar defects through author learning and root cause analysis
Antworten
  • Formal
  • Inspection
  • Walkthrough
  • Technical

Frage 26

Frage
In the ‘’Technical review’’ type, the… are mandatory, and the technical peers of the author are the...
Antworten
  • Individual preparation and scribe / reviewers
  • Individual preparation and author / moderators
  • Product owner and facilitator / managers
  • checklists and scribe / reviewers

Frage 27

Frage
The purposes of ….. review type include: preventing future similar defects through author learning and root cause, and achieving consensus.
Antworten
  • Informal
  • Inspection
  • Walkthrough
  • Technical

Frage 28

Frage
Which of the following review types should have: a defined process, individual preparation and a scribe, and it might produce defect logs and a review report?
Antworten
  • Walkthrough review
  • Technical review
  • Informal review
  • Inspection review

Frage 29

Frage
In the Inspection review type, the leader of the review meeting is the...
Antworten
  • Facilitator
  • Author
  • Manager
  • Reviewer

Frage 30

Frage
Any types of reviews that are done by colleagues at a similar approximate organizational level, can be done as...
Antworten
  • Formal reviews
  • Peer reviews
  • Technical reviews
  • Inspection reviews

Frage 31

Frage
… is used when we depend mainly on reviewer skills and when we have little or no planning and little preparation.
Antworten
  • Ad hoc technique
  • Checklist-based technique
  • Scenario and dry run
  • Role based technique

Frage 32

Frage
... is a systematic technique where we set a group of questions that are distributed at review initiation based on potential defects.
Antworten
  • Ad hoc technique
  • Checklist-based technique
  • Scenario and dry runs technique
  • Role based technique

Frage 33

Frage
In..., reviewers are given better structured guidelines on how to read through the work product and to identify specific defects types.
Antworten
  • Ad hoc technique
  • Checklist-based technique
  • Scenario and dry runs technique
  • Role based technique

Frage 34

Frage
In... , reviewers evaluate the work product from the perspective of individual stakeholder roles including specific end user types and specific roles in the organization.
Antworten
  • Ad hoc technique
  • Checklist-based technique
  • Role-based technique
  • Perspective-based technique

Frage 35

Frage
…. is a very effective technique to review requirements and technical work products using different stakeholder viewpoints, and it is similar to role-based techniques.
Antworten
  • Ad hoc technique
  • Checklist technique
  • Scenario and dry runs
  • Perspective - based technique
Zusammenfassung anzeigen Zusammenfassung ausblenden

ähnlicher Inhalt

Chapter 6 - CTFL ISTQB
America LH
Chapter 4 - CTFL ISTQB
America LH
Chapter 5 - CTFL ISTQB
America LH
Chapter 1 - Quick Quiz - Principles of testing
America LH
Examen ISTQB Español Fundation Level-Modelo C - Preguntas
Heidy Blanco
Testing for ions
Joshua Rees
ISTQB 2018 Foundation Software Testing 1
Robyn Babbage
CTFL-AT
C B
ISTQB Foundation Software Testing A
Robyn Babbage
Chemistry Ion Testing Quiz
Ben Botting
Testing for ions
Joshua Rees