Frage 1
Frage
Which of the following is a correct definition of a review?
Antworten
-
The review is mostly a manual activity in which work products like requirements, code, and design are reviewed in order to find defects in them
-
The review is an automated activity in which work products like requirements, code, and design are reviewed in order to find defects in them
-
The review is an automated activity in which the code is reviewed in order to find warnings and errors in it
Frage 2
Frage
Which of the following is correct?
Antworten
-
Reviews rely on the manual examination of work products while static analysis is tool-driven
-
Static analysis relies on the manual examination of work products while reviews are tool-driven
-
Both reviews and static analysis are tool-driven
Frage 3
Frage
What is the difference between warning and errors in the code?
Antworten
-
Code can run without solving errors, but it can't run without solving warnings
-
Code can run without solving warnings, but it can't run without solving errors
-
All warnings and errors must be solved before running the code
Frage 4
Frage
Which of the following is correct regarding static analysis?
1-Static analysis is an important part of security testing
2-Static analysis is used only in sequential lifecycle models
3-Static analysis is important for safety-critical computer systems
Antworten
-
1 & 2 are correct; 3 is wrong
-
1 & 3 are correct; 2 is wrong
-
2 & 3 are correct; 1 is wrong
Frage 5
Frage
When we find a defect in requirements or design, this will cost (...) finding the same defect in production.
Antworten
-
more than
-
less than
-
the same as
Frage 6
Frage
If we want to categorize the reviews into two types, they would be:
Antworten
-
static and dynamic review
-
experience-based and metrics-based review
-
formal and informal review
Frage 7
Frage
Which of the following are the correct steps of the review process?
Antworten
-
Planning, monitoring, analysis, design and executing
-
Planning, initial review, technical review, checklist based and roles
-
Planning, initial review, individual review, issue communication and analysis, and fixing and reporting
-
Planning, initial review, executing, technical review, and fixing and reporting
Frage 8
Frage
Which of the following occurs in the "Planning" step of the review process?
Frage 9
Frage
What is the difference between Entry & Exit criteria in the review process?
Antworten
-
Entry criteria are goals that need to be achieved, while exit criteria are prerequisites that must be met in order to be able to begin our review
-
Entry criteria are prerequisites that must be met in order to be able to begin our review, while exit criteria are goals that need to be achieved
Frage 10
Frage
Which of the following occurs in review process step "Initiate review"?
Antworten
-
Evaluating and documenting quality characteristics
-
Gathering metrics (for more formal review types)
-
Answering any questions that participants may have about the review
Frage 11
Frage
Reviewing all or part of the work product, noting potential defects and questions, those activities occur in which step in the review process?
Antworten
-
Initiate review
-
Individual review
-
Planning
Frage 12
Frage
In which step in the review process does this activity happen "Evaluating the review findings against the exit criteria to make a review decision"?
Frage 13
Frage
In which step in the review process does this activity occur "Accepting the work product when the exit criteria are reached"?
Frage 14
Frage
Who is responsible of creating the work product under review?
Antworten
-
Reviewer
-
Manager
-
Author
-
Facilitator
Frage 15
Frage
If we run a review meeting to review the code developed for a mobile application, who is the author in this review meeting?
Antworten
-
The tester
-
The developer
-
The product owner
-
The scrum master
Frage 16
Frage
The person who is responsible for review planning, assigning staff and budget, and monitoring cost-effectiveness is.....
Antworten
-
The reviewer
-
The facilitator
-
The author
-
The manager
Frage 17
Frage
Who is responsible of ensuring that the review meeting is run in an effective way?
Antworten
-
The reviewer
-
The facilitator
-
The manager
-
The author
Frage 18
Frage
One of the roles in the review is the moderator, we also call him...
Antworten
-
Facilitator
-
Author
-
Reviewer
Frage 19
Frage
Who takes the overall responsibility of the review?
Antworten
-
The scribe
-
The author
-
The moderator
-
The review leader
Frage 20
Frage
Who is responsible of collating potential defects found during the individual review activity?
Antworten
-
The moderator
-
The scribe
-
The author
-
The reviewer
Frage 21
Frage
Which review types aims at quickly solving minor problems?
Antworten
-
Pairing
-
Walkthrough
-
Technical Review
-
Inspection
Frage 22
Frage
The informal review is also called "buddy check" because it is performed by...
Frage 23
Frage
The main purposes of ….. review type include: improving the software product, considering alternative implementations and finding defects.
Antworten
-
Formal
-
Informal
-
Walkthrough
-
Technical
Frage 24
Frage
In the ‘’Walkthrough’’ review type the…. is mandatory and the leader of the review meeting is the...
Frage 25
Frage
The purposes of... review type include: detecting potential defects, evaluating quality and building confidence in the work product, preventing future similar defects through author learning and root cause analysis
Antworten
-
Formal
-
Inspection
-
Walkthrough
-
Technical
Frage 26
Frage
In the ‘’Technical review’’ type, the… are mandatory, and the technical peers of the author are the...
Antworten
-
Individual preparation and scribe / reviewers
-
Individual preparation and author / moderators
-
Product owner and facilitator / managers
-
checklists and scribe / reviewers
Frage 27
Frage
The purposes of ….. review type include: preventing future similar defects through author learning and root cause, and achieving consensus.
Antworten
-
Informal
-
Inspection
-
Walkthrough
-
Technical
Frage 28
Frage
Which of the following review types should have: a defined process, individual preparation and a scribe, and it might produce defect logs and a review report?
Antworten
-
Walkthrough review
-
Technical review
-
Informal review
-
Inspection review
Frage 29
Frage
In the Inspection review type, the leader of the review meeting is the...
Antworten
-
Facilitator
-
Author
-
Manager
-
Reviewer
Frage 30
Frage
Any types of reviews that are done by colleagues at a similar approximate organizational level, can be done as...
Antworten
-
Formal reviews
-
Peer reviews
-
Technical reviews
-
Inspection reviews
Frage 31
Frage
… is used when we depend mainly on reviewer skills and when we have little or no planning and little preparation.
Frage 32
Frage
... is a systematic technique where we set a group of questions that are distributed at review initiation based on potential defects.
Frage 33
Frage
In..., reviewers are given better structured guidelines on how to read through the work product and to identify specific defects types.
Frage 34
Frage
In... , reviewers evaluate the work product from the perspective of individual stakeholder roles including specific end user types and specific roles in the organization.
Frage 35
Frage
…. is a very effective technique to review requirements and technical work products using different stakeholder viewpoints, and it is similar to role-based techniques.