Frage 1

Frage
Which of the following are the advantages of using plastic pipes in plumbing systems? ๐—–๐—ต๐—ผ๐—ผ๐˜€๐—ฒ ๐˜๐—ต๐—ฒ ๐—ณ๐—ผ๐˜‚๐—ฟ ๐˜๐—ต๐—ฎ๐˜ ๐—ฎ๐—ฝ๐—ฝ๐—น๐˜†.
Antworten
  • Plastic pipes can be easily joined.
  • Plastic pipes can be used exposed due to their resistance to ultraviolet radiation.
  • Plastic pipes cost less compared to copper piping.
  • Plastic pipes produce low friction.
  • All plastic pipes are suitable for delivering drinking water.
  • Plastic pipes don't have the risk of corrosion.

Frage 2

Frage
Which of the following lumber thickness below is more likely to be a ๐˜ฅ๐˜ช๐˜ฎ๐˜ฆ๐˜ฏ๐˜ด๐˜ช๐˜ฐ๐˜ฏ๐˜ข๐˜ญ ๐˜ญ๐˜ถ๐˜ฎ๐˜ฃ๐˜ฆ๐˜ณ?
Antworten
  • 1"
  • 3"
  • 5"
  • 8"

Frage 3

Frage
What is the maximum recommended cavity space width in a typical brick veneer wall?
Antworten
  • 2"
  • 3"
  • 3 1/2"
  • 4 1/2"

Frage 4

Frage
What are the required hours of fire separation in a floor assembly between a 2300 square foot fully sprinklered food processing facility on the second floor and a fully sprinklered private garage on the first floor of a 2-story building? https://codes.iccsafe.org/content/IBC2021P2
Antworten
  • No separation required
  • Not permitted
  • 1 Hour
  • 2 Hours

Frage 5

Frage
Drag and drop the given components of the schematic door elevation across the highlighted letters given below accordingly. Not all of the given components are relevant to the given elevation detail.
Antworten
  • Top Rail
  • Lock Stile
  • Hinge Stile
  • Lock Rail
  • Cross Rail
  • Raised Panel
  • Muntin
  • Bottom Rail

Frage 6

Frage
An architect is red-lining the revised furniture plan of the building amenities floor of a residential apartment. He notices that the interior designer missed updating GL-FURN-1 as GL-FURN1A in new plans and elevations. Which of the following elevations should be revised as well as the plan itself to show the new furniture? ๐˜พ๐™๐™š๐™˜๐™  ๐™–๐™ก๐™ก ๐™ฉ๐™๐™–๐™ฉ ๐™–๐™ฅ๐™ฅ๐™ก๐™ฎ.
Antworten
  • 1/D615
  • 2/D615
  • 3/D615
  • 4/D615
  • 5/D615
  • 6/D615
  • 1/D619
  • 2/D619
  • 3/D619
  • 4/D619

Frage 7

Frage
What is the total U value of a 40โ€ฒ x 60โ€ฒ foot building with two 8โ€ฒ x 4โ€ฒ windows on each 60 feet wall if the height of the walls is 11 feet tall? (R-value of windows = 2, and R-value of the walls = 8.) https://www.ncarb.org/sites/default/files/ARE5-Handbook.pdf
Antworten
  • 0.132
  • 0.147
  • 0.154
  • 0.167

Frage 8

Frage
An architect is comparing the life-cycle costs of incandescent and CFL lamps for accent lighting in a retail project. Based on the table given below, what is the cost difference per lamp between the two lamp types if the use per lamp is expected to be 60,000 hours during the project's lifetime? (Ignore the long-term energy cost increase)
Antworten
  • $358.00
  • $272.00
  • $325.00
  • $448.00

Frage 9

Frage
An architect is working on the cost of a retaining wall. She already established the cost of excavation and the 12" tall footing required for this wall as $3,000. She is now calculating the above-ground cost of the retaining wall based on the $20 per square foot unit cost. If the pressure applied by the earth on the given retaining wall below is 25 pounds per cubic foot and the total lateral force applied on the retaining wall is 3200 #-ft, what is the total cost of this 25-foot-long retaining wall?
Antworten
  • $8,000
  • $10,050
  • $10,500
  • $11,000

Frage 10

Frage
Which of the following door hinge is more likely to be specified for a storage room door where large equipment is moved in and out?
Antworten
  • Swing Clear
  • Detention Hinge
  • Spring Hinges
  • Anchor Hinges

Frage 11

Frage
Which of the low-slope roofing insulation materials below is superior to the rest regarding; thermal properties, moisture protection, and compatibility with roofing membranes?
Antworten
  • Extruded polystyrene foam
  • Expanded polystyrene board
  • Polyisocyanurate foam
  • Perlite board

Frage 12

Frage
Which of the following option gives the sections given below in the correct order, from best to worst, based on their resistance to the exterior airborne sound transmission?
Antworten
  • Section I > Section II > Section III
  • Section II > Section I > Section III
  • Section I > Section III > Section II
  • Section II > Section III > Section I

Frage 13

Frage
Select the functions of "kerf" in wall assemblies. ๐˜พ๐™๐™š๐™˜๐™  ๐™ฉ๐™๐™š ๐™ฉ๐™ฌ๐™ค ๐™ฉ๐™๐™–๐™ฉ ๐™–๐™ฅ๐™ฅ๐™ก๐™ฎ.
Antworten
  • To create a capillary break at the bottom edge of an exterior surface.
  • To create room in stone panels to anchor them to the backup wall.
  • To increase the R-value of the wall assemblies.
  • To provide room for sealants in wall openings like windows and doors.

Frage 14

Frage
An architect is reviewing some coating options for her new school project with concrete floor finishes. Which of the following coating is more likely to provide a nonskid, waterproof finish for the project?
Antworten
  • Epoxy coal-tar based coating
  • Coal-tar-modified epoxy resin coating
  • Cementitious acrylic polymeric coating
  • Vinyl-ester based coating

Frage 15

Frage
Select the correct methods to attach the ISO board and cover board to the roofing membrane with a single-ply membrane roofing. ๐˜พ๐™๐™š๐™˜๐™  ๐™ฉ๐™๐™š ๐™ฉ๐™๐™ง๐™š๐™š ๐™ฉ๐™๐™–๐™ฉ ๐™–๐™ฅ๐™ฅ๐™ก๐™ฎ.
Antworten
  • Fully adhered
  • Mopping
  • Mechanically fastened
  • Ballasted
  • Torched

Frage 16

Frage
Select the correct statements regarding parapet details. ๐˜พ๐™๐™š๐™˜๐™  ๐™ฉ๐™๐™š ๐™›๐™ค๐™ช๐™ง ๐™ฉ๐™๐™–๐™ฉ ๐™–๐™ฅ๐™ฅ๐™ก๐™ฎ.
Antworten
  • As a coping material, brick is more water-resistant compared to sheet metal copings and works better to shed water away from the parapet wall.
  • Sheet metal copings are more water-resistant compared to brick copings, so their use is much more common.
  • In a typical roof parapet detail, metal cleats are used to secure roof flashing and to provide wind resistance.
  • The coping over a roof parapet is generally sloped away from the roof.
  • Stone copings over brick parapet walls are secured via steel dowels.
  • When through-the-wall or surface-mounted counter flashing options are not available, a reglet on the wall can be a solution to secure the counter flashing.
  • Counter flashings are typically installed under the base flashings to prevent water infiltration.

Frage 17

Frage
Which of the following component is used to transfer shear forces from the diaphragm to beams and shear walls?
Antworten
  • Hold downs
  • Drag struts
  • Post Caps
  • Mending Plates

Frage 18

Frage
An architect is working on a large high-school project with a complex and unique facade design, so she is considering GFRC panels rather than precast concrete panels on the facade. Which of the following are probably the reasons to justify this choice? ๐˜พ๐™๐™š๐™˜๐™  ๐™ฉ๐™๐™š ๐™ฉ๐™๐™ง๐™š๐™š ๐™ฉ๐™๐™–๐™ฉ ๐™–๐™ฅ๐™ฅ๐™ก๐™ฎ.
Antworten
  • GFRC panels are much lighter, so they are more convenient, especially when complex facade design can bring total building loads to critical levels.
  • Although precast concrete panels are much more effective in creating complex designs, GFRC is preferred due to its low cost.
  • GFRC panels have higher resistance to impact compared to precast concrete panels.
  • Compared to precast panels, GFRC panels are more durable and have a higher tensile strength.
  • Installation of precast concrete panels is less labor intensive and faster however, GFRC panels are preferred due to their lower material cost.
  • Since sustainability is not a concern of this project, the architect selected GFRC panels rather than precast panels.

Frage 19

Frage
Which of the following options are typically included in Project Documents? ๐˜พ๐™๐™š๐™˜๐™  ๐™ฉ๐™๐™š ๐™›๐™ค๐™ช๐™ง ๐™ฉ๐™๐™–๐™ฉ ๐™–๐™ฅ๐™ฅ๐™ก๐™ฎ.
Antworten
  • Bidding Requirements
  • Contract forms, conditions and modifications
  • Product warranties
  • Drawing and Specifications
  • Addendum
  • Zoning Requirements

Frage 20

Frage
An architect works on a residential project and wants to achieve the highest R-value possible. Which of the following window materials provides a better R-value compared to the rest? ๐˜พ๐™๐™š๐™˜๐™  ๐™ฉ๐™๐™š ๐™ฉ๐™ฌ๐™ค ๐™ฉ๐™๐™–๐™ฉ ๐™–๐™ฅ๐™ฅ๐™ก๐™ฎ.
Antworten
  • Wood
  • Vinyl
  • Steel
  • Aluminum
Zusammenfassung anzeigen Zusammenfassung ausblenden

รคhnlicher Inhalt

BS, BDCS, SS
Tess Wolverton
vebr to be
Sarah Abdullah
Problem Seeking
Kara Biczykowski
la web
arevalob727
The Microwave Oven by Timothy Ramer
Timothy Ramer
Slides|Lesson 2: Quality Management and Coordination
Molly Vaughan
Project Closeout
Kara Biczykowski
PJM 2
M. A.
PDD Quiz I
a a
PDD Quiz IX
a a