Frage 1
Frage
What can a contractor use to calculate his carbon footprint?
Frage 2
Frage
What are the three bi-products of energy production? [Choose three]
Antworten
-
CFC
-
HCFC
-
Sulfur Dioxide
-
Nitrogen Oxide
-
Carbon Dioxide
Frage 3
Frage
What contaminant is not naturally found in groundwater?
Antworten
-
Radon
-
Pesticide
-
Arsenic
-
Sodium
Frage 4
Frage
If a landscaped area utilizes fertilizers what are the byproducts of the fertilizer in the stormwater runoff? [Choose two]
Antworten
-
Suspended solids
-
Nitrogen
-
Sulfur Dioxide
-
Phosphorus
Frage 5
Frage
If a building has 1000 SF what qualifies as densely populated?
Antworten
-
10 people
-
15 people
-
20 people
-
25 people
Frage 6
Frage
What qualifies as documentation for Community Connectivity?
Antworten
-
Color photograph of the establishments
-
Map showing basic services
-
Building permits for the establishments
-
Records of the project site and building development area
Frage 7
Frage
How many levels are there of LEED building certification?
Frage 8
Frage
Which building systems generally include CFCs and HCFCs? [Choose two]
Antworten
-
Fire Hydrant
-
Fire Suppression
-
Roof Top Ventilator
-
Systems Insulators
-
Chiller Tower
Frage 9
Frage
Which building systems generally include CFCs and HCFCs? [Choose two]
Antworten
-
Fire Hydrant
-
Fire Suppression
-
Centrifugal Chiller
-
Systems Insulators
-
Chiller Tower
Frage 10
Frage
What is a benefit of using FSC certified lumber?
Antworten
-
Preserve wildlife habitat and biodiversity
-
FSC lumber is free of urea-formaldehyde
-
Lower grades of wood are more readily available
-
It is a regulated wood product at the growing/harvesting stage
Frage 11
Frage
What does a conventional project delivery method look like?
Antworten
-
The architect, construction contractors engineer, owner, and all others work relatively independently on their individual scopes of work.
-
All disciplines come together at the beginning to discuss project goals and requirements.
-
The property owner, facility managers, designer, construction contractors, and other project team members establish a mutual understating of the project’s goals and budget as early as possible.
-
All design professionals work in collaboration and not in isolation.
Frage 12
Frage
What can be included in comingled recycling? [Choose three]
Frage 13
Frage
What can be included in comingled recycling? [Choose three]
Antworten
-
Metals
-
Paper
-
Organic Material
-
Glass
-
Inkjet cartridges
Frage 14
Frage
What needs to be included in a waste management plan? [Choose three]
Antworten
-
Durable material leaving the project site
-
Hazardous materials leaving the project site
-
Materials going to a landfill
-
Incinerated materials
-
Recyclable materials
Frage 15
Frage
Where do projects adjust the credits based on the square footage of the building?
Antworten
-
LEED for Neighborhood Development
-
LEED for Homes
-
LEED for New Construction
-
LEED for Core & Shell
-
LEED for Schools
Frage 16
Frage
A new university lab wants to be LEED certified. Which rating system could they use? [Choose two]
Frage 17
Frage
What would be considered a passive design strategy?
Frage 18
Frage
If there is a CxA, 2 LEED AP’s, and a LEED GA all working on a project how many points would the project eligible for?
Frage 19
Frage
What would qualify for Innovation in Design?
Antworten
-
Meet the next incremental threshold percentage
-
Exceed the requirements by 10%
-
Exceed the requirements by 20%
-
Complete a credit from a different rating system
Frage 20
Frage
Which site would most effectively help a project to successfully earn credit in Sustainable Sites, Energy & Atmosphere, and Materials & Resources?
Antworten
-
Community Connectivity
-
Sustainable Site
-
Lengthy description of the site
-
Urban area close to services and public transportation
-
Previously undeveloped site that is 50 feet from a water body
Frage 21
Frage
Which of the following is a hydrocarbon?
Frage 22
Frage
What standard is used for recycled materials?
Antworten
-
Green-e
-
ASHRAE 52
-
SMACNA
-
ISO
-
EPA
Frage 23
Frage
If a project wanted to increase the buildings ventilation rate what strategies could be used? [Choose two]
Antworten
-
MERV 13 filter
-
Passive ventilation
-
Active ventilation
-
Increase fenestration
Frage 24
Frage
A project is keeping an existing HVAC system that utilizes CFCs and the building is going for LEED certification. What are their options? [Choose two]
Antworten
-
Replace CFC with HCFC
-
Phase-out equipment over 5 years and reduce annual leakage of CFC-based refrigerants to 5%
-
Completely replace the system
-
Phase-out equipment over 10 years and reduce annual leakage rate of CFC-based refrigerants to 2%
Frage 25
Frage
What is a benefit of purchasing local materials? [Choose three]
Frage 26
Frage
A project is located in an urban area and the project team is considering installing alternative fuel stations. Which credits would this help them to achieve? [Choose two]
Antworten
-
SS Credit 4.4: Alternative Transportation—Parking Capacity
-
SSC 2 Development Density and Community Connectivity
-
SSC 4.2 Alternative Transportation: Bicycle Storage and Changing Rooms
-
SSC4.3 Alternative Transportation: Low-Emitting and Fuel-Efficient Vehicles
Frage 27
Frage
How can a green project meet its budget? [Choose two]
Antworten
-
Develop a project schedule
-
Develop the project goals early
-
Higher a Green Consultant
-
Check Cost
Frage 28
Frage
What organization can assist in finding efficient appliances?
Antworten
-
Green-e
-
ASHRAE
-
ENERGY STAR
-
SMACNA
-
Green Seal
Frage 29
Frage
What should you do to ensure that green purchasing plans are effective? [Choose two]
Antworten
-
Develop a sustainable purchasing policy
-
Monitor
-
Only purchase cleaning product s with a Greenseal label
-
Use less harmful fertilizers and pesticides
-
Survey employees anonymously
Frage 30
Frage
A building is going to utilize High Efficiency Toilets with a flush rate of 1.2 GPF. What will be their savings per flush?
Frage 31
Frage
Who certifies RECs?
Antworten
-
Green Label
-
Green Seal
-
Green-e
-
Greenguard
Frage 32
Frage
What is the intent of RECs?
Antworten
-
Promote renewable energy with net zero offset
-
Promote off-grid renewable energy sources
-
Promote on-grid renewable energy with net zero offset
-
Reduce off-grid carbon emissions
Frage 33
Frage
Where will you see an increase in soft cost on a green project?
Antworten
-
Hiring a green consultant
-
Upgrading the windows
-
Choosing a more expensive HVAC system
-
Implementing construction waste management
Frage 34
Frage
What unit do projects purchase RECs in?
Antworten
-
Ampere
-
MegaWatts
-
KwH
-
BTUs
-
KwH/SF
Frage 35
Frage
How long must a REC be purchased for to be eligible for LEED Credit?
Antworten
-
12 months
-
2 years
-
5 years
-
10 years
Frage 36
Frage
What is included in the calculation for urban density?
Antworten
-
Park
-
Public Road
-
Parking lot
-
Public right away
Frage 37
Frage
In a densely populated urban area with little open space, what can a project do to improve the quality of the stormwater runoff?
Frage 38
Frage
Which of these qualifies as a Greenfield?
Antworten
-
A cotton field
-
A site that has been graded
-
A field with a parking lot
-
Farmland with an existing barn
Frage 39
Frage
What qualifies as a renewable energy source? [Choose two]
Antworten
-
Wind
-
Natural Gas
-
Nuclear
-
Geothermal
Frage 40
Frage
Which of the following is a renewable energy source?
Antworten
-
Coal
-
Propane
-
Biomass
-
Natural Gas
Frage 41
Frage
An office building is being constructed on a site where an old barn is. A beam is reused in the construction process. What would this qualify as?
Antworten
-
Salvaged
-
Recycled
-
Materials Reuse
-
Regional Materials
Frage 42
Frage
At what point during the process does a project need to meet all local, regional, and national government codes?
Antworten
-
When the project registers with USGBC
-
When the project begins construction
-
During design
-
During application for a building permit
Frage 43
Frage
A project in a mild climate wanted to use all natural air ventilation systems but later found out that local regulations required mechanical what should they do?
Antworten
-
Use all natural anyway and get the point for LEED
-
Speak with local regulators
-
Use enough mechanical to meet regulations but also incorporate natural
-
Local code is not updated so therefore use the new LEED standards
Frage 44
Frage
Lighting Power Density (LPD) is derived from?
Antworten
-
Footcandles by lighting in a given area
-
Lighting power per a given area
-
Light per a given area
-
Watts by lighting in a given area
Frage 45
Frage
An owner is working on ongoing sustainable measures. Under what system could they certify?
Frage 46
Frage
The building is being designed with a rooftop terrace. What is the best method of reducing the heat island effect and helping with stormwater runoff?
Antworten
-
Use light colored concrete with a high SRI value
-
Build a trellis with vines in order to provide shade
-
Use a living roof system
-
Install a cistern to collect rainwater
Frage 47
Frage
Waste water from kitchen sinks is considered:
Antworten
-
Grey water
-
Black water
-
Depends on local codes
-
Potable water
Frage 48
Frage
Buildings with current CFC based HVAC systems, under LEED O&M can have up to what percentage of leakage per year?
Frage 49
Frage
The ongoing chemical reaction that causes the breakdown of ozone in the atmosphere is caused by what refrigerant?
Frage 50
Frage
Which of these refrigerants has the highest OPD?
Frage 51
Frage
What is the intent of the Montreal Protocol?
Frage 52
Frage
Which of these materials can be found in a comingled bin? [Choose three]
Antworten
-
Aluminum
-
Cardboard
-
Plastic
-
Carpet
-
Organic material
Frage 53
Frage
A project team is developing a project on reclaimed land that was toxic and is located within a ¼ mile of a 2-way bus stop. Which of the following could the project qualify for? [Choose two]
Antworten
-
New Construction Brownfield
-
New Construction Greenfield
-
New Construction Public Transportation Access
-
New Construction Protect and Restore Habitat
Frage 54
Frage
What qualifies as a renewable energy source? [Choose two]
Antworten
-
Wind
-
Natural gas
-
Nuclear
-
Geothermal
-
Clean coal
Frage 55
Frage
Which of the following are used for LEED calculations? [Choose three]
Antworten
-
Lumen for lighting
-
GPF for water
-
kWh for electricity
-
kWh/sf for electricity
Frage 56
Frage
A new construction project is connected within a ½ mi of a public park by a walking path. This qualifies for community connectivity because of _____?
Frage 57
Frage
Which of these counts for community connectivity? [Choose three]
Frage 58
Frage
What is the ventilation standard in terms of indoor air quality?
Antworten
-
ASHRAE 90
-
ASHRAE 55
-
ASHRAE 62
-
Southcoast
Frage 59
Frage
What is the agreement that has banned CFCs and is planning to phase out HCFCs?
Antworten
-
Kyoto Protocol
-
EPAct of 1992
-
Montreal Protocol
-
SMACNA
-
ASHRAE
Frage 60
Frage
What is a strategy for promoting SSC4.3 Alternative Transportation: Low Emitting and Fuel Efficient Vehicles?
Frage 61
Frage
If you want to ensure the purchasing of sustainable materials during construction what should you do?
Frage 62
Frage
A project site has been graded. What type of site would this be?
Antworten
-
Brownfield
-
Greenfield
-
Developed
-
Undeveloped
Frage 63
Frage
The use of public transportation would result in?
Antworten
-
Reduction in bicycle racks
-
Reduced emissions
-
Reduce the need for roadways
-
Preserving natural environments
Frage 64
Frage
If a project is going to use low-flow fixtures and use graywater for flushing toilets, what credit category would that apply to?
Frage 65
Frage
If you implement a fertilizer management plan what would be reduced with respect to stormwater runoff?
Frage 66
Frage
What is a strategy to reduce the quantity of stormwater runoff?
Frage 67
Frage
What uses process energy? [Choose three]
Antworten
-
HVAC electricity
-
Computers
-
Kitchen stove
-
Lighting
-
Dishwasher
Frage 68
Frage
A building is certified Gold and they have occupied the building for 2 months. They want to earn LEED O&M. How long do they have to wait?
Frage 69
Frage
Where do you have to be located in order to purchase RECs?
Antworten
-
Near REC certified plants
-
Almost anywhere
-
Somewhere electricity is not monitored
-
Near hybrid electricity dams, renewable energy power provider
Frage 70
Frage
A LEED certified hotel that is 200,000 SF is applying for LEED O&M. Part of the building is owned by a private party conference center. How big can the conference center be so that the hotel can achieve LEED O&M certification?
Frage 71
Frage
What is a concern of using graywater as a spray for irrigation?
Antworten
-
Evaporation rates increase
-
Coming in contact with humans
-
Native and adaptive plants cannot be used
-
Projects will need to increase the area of turf used on the site
Frage 72
Frage
A project is building onto an existing facility and they want to remove the multi-story parking structure. What are they trying to achieve? [Choose three]
Frage 73
Frage
If you have 1% of CFCs left in one of the existing AC units what can you do?
Antworten
-
Can’t certify the project
-
Nothing. This meets the requirement to have less than 5% CFCs
-
Phase out the CFCs within ten years
-
Nothing. This meets the requirement to have less than 2% CFCs
Frage 74
Frage
You are targeting LEED NC and you can only achieve 6 of the 8 prerequisites. Which of these statements is true?
Antworten
-
Submit a CIR to clarify the prerequisites that cannot be achieved
-
Substitute prerequisites from another rating system
-
Project cannot achieve LEED certification
-
Project cannot earn credits in the category that prerequisites cannot be achieved
Frage 75
Frage
A School project is implementing a program to use 90% of their wood construction waste to build chairs. What category could this earn them a point in?
Frage 76
Frage
A project is having a problem with controlling site flooding. What could the engineer do? [Choose two]
Frage 77
Frage
Rapidly renewable materials is calculated by a percentage of which of these?
Antworten
-
Percent of total project cost
-
Percent of materials cost
-
Percent of the weight of materials
-
Percent of the volume of materials
Frage 78
Frage
When can you use the USGBC member logo?
Frage 79
Frage
If a project cannot use on-site renewable energy what is another way to reduce energy demand?
Antworten
-
ENERGY STAR
-
RECs
-
Green Power
-
ENERGY SENSE
Frage 80
Frage
Which of the following is flush fixture?
Antworten
-
Waterless Urinal
-
Water Closet
-
Showerhead
-
Lav Faucet
Frage 81
Frage
What is the baseline for water closets and urinals?
Antworten
-
2.2 GPF and 1.0 GPF
-
1.0 GPF and 2.2 GPF
-
1.6 GPM and 1.0 GPM
-
1.6 GPF and 1.0 GPF
Frage 82
Frage
A project is two points short of earning a platinum rating. Which certification level will level earn?
Antworten
-
Green
-
Bronze
-
Certified
-
Silver
-
Gold
Frage 83
Frage
A project is two points short of earning a platinum rating. Which certification level will level earn?
Antworten
-
Green
-
Bronze
-
Certified
-
Silver
-
Gold
Frage 84
Frage
What can be included in comingled construction waste? [Choose three]
Antworten
-
Excavated soil
-
Concrete
-
Wood
-
Hazardous material
-
Drywall
Frage 85
Frage
Which rating system takes into consideration the importance of acoustical design?
Frage 86
Frage
What is the difference between the building footprint and the LEED project boundary?
Antworten
-
The LEED project boundary can include land that is not owned by the project
-
LEED project boundary can be adjusted to help projects met credit requirements
-
The building footprint is easier to minimize
-
One includes parking lots and access roads
Frage 87
Frage
Which of these is a renewable energy source?
Frage 88
Frage
How can you reduce Heat Island and Stormwater runoff? [Choose three]
Antworten
-
Vegetated Roof
-
Open-grid pavers
-
Plant a trellis that provides shade
-
Gray concrete
-
Shade the parking lot area
-
Permeable concrete with a high SRI
Frage 89
Frage
A project is seeking Sustainable Sites Community Connectivity credit. What strategy would help them to achieve this?
Antworten
-
Avoid the development of inappropriate sites and reduce the environmental impact from the location of a building on a site.
-
Channel development to urban areas with existing infrastructure, protect greenfields and preserve habitat and natural resources.
-
Rehabilitate damaged sites where development is complicated by environmental contamination.
-
Conserve existing natural areas and restore damaged areas to provide habitat and promote biodiversity.
Frage 90
Frage
What is the definition of a recycled material?
Antworten
-
Recycled
-
Salvaged
-
Refurbished
-
3-step process. Break it down, build something, sell-it
-
Materials that come from a noncontroversial source
Frage 91
Frage
A building is replacing old windows with high performance windows. Which LEED category would this affect?
Antworten
-
Indoor Environmental Quality (IEQ)
-
Materials and Resources (MR)
-
Energy and Atmosphere (EA)
-
Innovation in Design (ID)
Frage 92
Frage
An owner is considering building a LEED for Homes multi-tenant building. Which green factors should the team consider? [Choose three]
Frage 93
Frage
What is the definition of Radon?
Antworten
-
What is the definition of Radon?
Naturally occurring colorless, odorless, and chemically inert but radioactive gas present (in varying amounts) in all soils and groundwater, and which occurs due to decay of uranium atoms over time. It enters homes through cracks and opening in concrete slabs and pores in hollow concrete blocks. Although exposure to radon produces no immediate symptoms, it is classified as a known carcinogen by the US Environmental Protection Agency (EPA).
-
None.
Frage 94
Frage
Wood that has been logged 50 years ago and removed from a river bed counts as?
Antworten
-
FSC Certified
-
Salvaged
-
Recycled
-
Regional
Frage 95
Frage
Who fills out the LEED credits?
Frage 96
Frage
When renovating a building what should projects replace to save energy?
Antworten
-
Windows
-
Beams and Columns
-
Floor
-
Exterior Walls
Frage 97
Frage
If a LEED project has 4 LEED AP’s and 3 are principal members of the project team, how many points will the project be eligible to earn?
Frage 98
Frage
In what LEED category can projects receive credit for having a LEED AP on the project team?
Frage 99
Frage
Where do you find the project Scorecard?
Antworten
-
Reference Guide
-
USGBC
-
LEED Online
-
GBCI
Frage 100
Frage
Identify the primary goals of the LEED MPRs. [Choose three]
Antworten
-
Streamline the LEED certification process
-
Give clear guidance to customers
-
Protect the integrity of the LEED program
-
Reduce complications that occur during the LEED certification process
Frage 101
Frage
What is the minimum floor area requirement for New Construction, Core and Shell, Schools, Existing Buildings: O&M?
Antworten
-
500 square feet of gross floor area
-
1,000 square feet of gross floor area
-
250 square feet of gross floor area
-
750 square feet of gross floor area
Frage 102
Frage
What is the minimum building area to site area ratio that LEED projects must comply with to be eligible to certify a project?
Frage 103
Frage
In LEED Online who is responsible for assigning project team members to roles and credit responsibilities?
Antworten
-
Project Superintendent
-
Team Members
-
Project Administrator
-
USGBC