Frage 1
Frage
The following are deliverables produced by the Architect:
Antworten
-
Conceptual Mass Model
-
Preliminary Design Coordination Report between
Architecture model & Structural model
-
Clash detection & resolution report between Architecture, Structure & MEP models
-
RFI Resolutions
-
All of the above
Frage 2
Frage
Current BIM implementation is still based on a Hybrid method
Frage 3
Frage
To generate the topography model, the Architect will use topography drawings of the existing site, provided by the Registered Surveyor / Civil Engineers
Frage 4
Frage
During Schematic design phase, the Architect do not produce
Frage 5
Frage
During Detail Design phase, the Architect would produce:
Frage 6
Frage
During Details Design phase, Model Exchange is done continuously as the design and project progresses. Early clash detections are performed to lessen conflict of elements before construction.
Frage 7
Frage
When continue and develop Architecture model to Contractor’s model, basic elements required from the Architecture model are:
Antworten
-
X, Y, Z Coordinates
-
Topography (Existing Site Model)
-
Topography (Proposed Site Model)
-
Grid and Level
-
Building components: Wall, Architectural Column, Door, Window, Slab/ Floor, Ceiling, Fixtures, Furniture (optional), Facade, Railing, etc.