Frage 1

Frage
You have been asked to install and configure a new switch in a customer network. Use the console access to the existing and new switches to configure and verify correct device configuration. You are connecting the New_Switch to the LAN topology; the switch has been partially configured and you need to complete the rest of configuration to enable PC1 communication with PC2. Which of the configuration is correct?

Frage 2

Frage
You have been asked to install and configure a new switch in a customer network. Use the console access to the existing and new switches to configure and verify correct device configuration. Refer to the configuration. For which configured VLAN are untagged frames sent over trunk between SW1 and SW2?
Antworten
  • VLAN1
  • VLAN 99
  • VLAN 999
  • VLAN 40
  • VLAN 50
  • VLAN 200
  • VLAN 300

Frage 3

Frage
You have been asked to install and configure a new switch in a customer network. Use the console access to the existing and new switches to configure and verify correct device configuration.You are adding new VLANs. VLAN500 and VLAN600 to the topology in such way that you need to configure SW1 as primary root for VLAN 500 and secondary for VLAN 600 and SW2 as primary root for VLAN 600 and secondary for VLAN 500. Which configuration step is valid?
Antworten
  • Configure VLAN 500 & VLAN 600 on both SW1 & SW2
  • Configure VLAN 500 and VLAN 600 on SW1 only
  • Configure VLAN 500 and VLAN 600 on SW2 only
  • Configure VLAN 500 and VLAN 600 on SW1 ,SW2 and SW4
  • On SW2; configure vtp mode as off and configure VLAN 500 and VLAN 600; configure back to vtp server mode.

Frage 4

Frage
You have been asked to install and configure a new switch in a customer network. Use the console access to the existing and new switches to configure and verify correct device configuration.Examine the VTP configuration. You are required to configure private VLANs for a new server deployment connecting to the SW4 switch. Which of the following configuration steps will allow creating private VLANs?
Antworten
  • Disable VTP pruning on SW1 only
  • Disable VTP pruning on SW2 only
  • Disable VTP pruning on SW4 only
  • Disable VTP pruning on SW2, SW4 and New_Switch
  • Disable VTP pruning on New_Switch and SW4 only.
Zusammenfassung anzeigen Zusammenfassung ausblenden

ähnlicher Inhalt

CCNP 300-115 TOPIC SEGURIDAD
Alexander Gomez
CCNP 300-115 Topic 3, Infrastructure Services
Alexander Gomez
ELEMENTOS PASIVOS Y ACTIVOS
Daniel Borja
Construccion de redes
Luis Holguin
E3_V6
John Dedios
Redes Informáticas
Cecilia Sánchez
Examen Final de Periodo Grado 11 CODINI Barranquilla
Fabian Gutierrez Carbonell
Conceptos Bucles y Toma de decisiones
Cristhian Sequeira
Redes de interconexión. Hub, Switch y Routers
liizgar15
Conexión de Red Brahian
brahian.santos98
ENRUTAMIENTO DE VLAN
Efrain Cuevas riaño