Big Gate

Beschreibung

Karteikarten am Big Gate, erstellt von Jake U am 20/09/2015.
Jake U
Karteikarten von Jake U, aktualisiert more than 1 year ago
Jake U
Erstellt von Jake U vor etwa 9 Jahre
18
1

Zusammenfassung der Ressource

Frage Antworten
Big Gate (word for word) Step 1 Safely dismount the apparatus wearing all PPE carrying a radio
Step 2 Remove the hydrant gate from the rear of the apparatus
Step 3 Wrap 125mm hose around the hyrdant
Step 4 Stand on the hose and signal small gate when ready
Step 5 When the apparatus is stopped or when it is safe to do so, remove steamer cap from hyrdant
Step 6 Inspect the barrel of the hydrant and connect gate
Step 7 Ensure that the drain valve is in open position
Step 8 Radio or signal driver or sector officer that you are ready to turn on the hydrant
Step 9 Open hydrant when ordered by driver or sector officer, close drain valve
Step 10 Gather tools, remove kinks in hose, and report to your officer for reassignment
Zusammenfassung anzeigen Zusammenfassung ausblenden

ähnlicher Inhalt

Rank Structure Policies
Jake U
Water supply and hydraulics Part 1
Jake U
Water supply and hydraulics part 2
Jake U
Fire behavior (50 cards)
Jake U
Small gate
Jake U
Kognitive Lerntheorien
Inés Fernandez
Mathe Abiturvorbereitung
JuliaSt
Lernmotivation - Motivationszitate
Laura Overhoff
Sturm und Drang & Empfindsamkeit
Julia Schaffhirt
Vetie Radio 2014
S J
Vetie - Innere Medizin 2013
Fioras Hu