Created by Baigal Tsolmonba
about 9 years ago
|
||
Question | Answer |
Landfill is a site. | |
What are components of a landfill? | 1. Liner 2. Leachate Collection System 3. Gas trench and potential collection 4. Monitoring system 5. Daily cover 6. Final cover |
Landfill before operation | |
Landfill after closing | |
Engineering consideration of designing landfill | 1. Siting regulation, EJ issues 2. Soil conditions 3. Climate conditions-heavy precipitation 4. Surface water hydrology-runoff 5. Geological conditions 6. Easy access, haul distance 7. potential ultimate uses |
Siting considerations | airport |
Anaerobic degrdation | |
Landfill gas | |
What is landfill leachate? | Leachate is a liquid that has passed through or emerged from landfill waste. Primary and Secondary leachate |
Leachate management | 1. Hazardous waste 2. biological treatment, aerobic, anaerobic, nitrification, denitrification 3. chemical treatment 4. physical evaporation 5. Leachate recycling |
Phases of landfill life | phase I phase II phase III phase IV phase V |
Want to create your own Flashcards for free with GoConqr? Learn more.