Construction management

Description

Flashcards on Construction management, created by Nanna Bach Munkh on 15/09/2016.
Nanna Bach Munkh
Flashcards by Nanna Bach Munkh, updated more than 1 year ago
Nanna Bach Munkh
Created by Nanna Bach Munkh almost 8 years ago
11
1

Resource summary

Question Answer
Types of construction Minor-Major-Specific ^ Original works-repair ^ Light-heavy-industrial
What is light construction Residential & school building, village of city roads, water supply & sewage works
Heavy construction Tunneling, transportation project as railways, highways, harbors
Stages in construction project Conceptual stage Analysis & development of the idea Design stage Tendering & awarding of the contract Construction of the project Commissioning of the project
What is the conceptual or initiation stage Idea stage Entreprenual efforts to satisfy the need of society Ideas have to be constantly nurtured to reach completion stage
What happens in analysis & development of the idea Analysis of cost and its benefits Initial surveys to be conducted Cost estimate prepared
Design stage Field investigations & survey Drawing of elements Final estimate
Awarding the contract for construction Tender documents Awarding the tender The tender value is economically competitive
The construction stage Finish the project within expected time
Project clean up phase Putting completed facilities into use Keeping up continuous maintenance
Work break down structure Breaking to project into easily identifiable major systems, their subsystems & discrete activities
Steps involved in planning Crystallizing the opportunity or problem Securing & analyzing necessary information Establishing planning premises & constrains Ascertaining alternative course of action Selecting optimum plan Determine derivative plan Fixing the timing of introduction Arranging future evaluation of effectiveness of the plan
Stages of planning Preparing General framework, cost benefits, investment alternative Detailed planning Detailed design, drawing, specifications, bill of quantities, project breakdown Monitoring & control Updating the schedule
Steps in project scheduling phase Calculate-quantity of work Assign- timings to events & activities Give- consideration to the resources (availability is limited) Allocate-the resources
Steps involved in preparing a bar chart Divide project into activities List out the activities Find inter relationship Arrange activities Calculate the quantity of work & time required Draw according to scale
Show full summary Hide full summary

Similar

Midterm 1 diagrams
Cj Alsenay
Relationships Anthology
andrew_w_scholl
Key Definitions for organic chemistry
katburr23
Important Spanish Verbs
madiywarner
An Inspector calls Themes
anya14
Of Mice and Men
amyk4321
HRCI Glossary of Terms O-Z
Sandra Reed
The structure of the heart
rachel_w
Forces and motion
Catarina Borges
el centro comercial
Pamela Dentler
Účto Fífa 2/6
Bára Drahošová