10 Important Points to Remember After Completing Cargo Operations on Tankers

Description

UAC J. Saray Ramos Palencia
s4ro10
Mind Map by s4ro10, updated more than 1 year ago
s4ro10
Created by s4ro10 over 9 years ago
17
0

Resource summary

10 Important Points to Remember After Completing Cargo Operations on Tankers
  1. 1.Check Loaded Quantity: when the loading operations , the amount of charge of the tankers ends must be reviewed by a responsible officer and by a representative on the shore. and the amount should be reported to the master and immediate authority .
    1. 2. Inform Engine Room: notify the engine department the discharging is finished and wait for the inspector to issue the "Dry tank certificate and Empty Tank Certificate "
    2. 3. Keep The Logbook Updated: update loading times and discharging operations are recorded in the logbook office and main points in the Deck logbook.
      1. 4.. Close All Valves: after completion of the loading and unloading operations , all valves must be closed. the ground control valves are closed first tanker valves .
        1. 5. Remove the Cargo Hoses By Avoiding Oil Spill: After verifying that the valves are closed , charging hoses they must be removed. this is to prevent the oil spill
          1. 6. Check Breather Valve: the vent valves must be verified and evaluated to maintain the pressure inside the tank.
            1. 7. Change the Flange Position: change the position of the mounting flange showing the blank side to isolate the line and prevent overflow
              1. 8. Close tank openings: all tank openings must be closed after completion of loading and unloading. This was carried out by a pump- man or bosun under the direction of chief officer responsible .
                1. 9. Remove Linking Cables Earth : the union of Earth Cables should be taken after charging hoses are disconnected.
                  1. 10. Open Drain Cocks: tanks and valves in land should be closed , and the taps in the collector tank must be opened to allow drainage of cargo in fixed tanks drains or portable drip trays
      Show full summary Hide full summary

      Similar

      Geometry Formulas (Perimeters)
      PatrickNoonan
      Volcanoes
      1jdjdjd1
      THEMES IN KING LEAR
      Sarah-Elizabeth
      Atoms, Protons, Neutrons & Electrons quiz
      leonie.examtime
      Question Words - GCSE German
      lucykatewarman1227
      A-Level History: Nazi Germany
      cian.buckley+1
      STEM AND LEAF DIAGRAMS
      Elliot O'Leary
      AS Biology- OCR- Module 1 Cells Specification Analysis and Notes
      Laura Perry
      Acids, Bases and Salts
      asramanathan
      1PR101 2.test - Část 12.
      Nikola Truong
      Unit 1.1 Systems Architecture
      Mathew Wheatley