SAB7#43_SCOPE_LEVELS
  1. Activity
    1. PMI considers an activity to be a particular piece of work scheduled for the project.
    2. Work package
      1. The work package is the lowest level on a WBS, the higher levels are used to categorize the work packages.
      2. Control account
        1. Tool that allows for the analysis of work performance data regarding costs, schedule, and scope. Control accounts provide a way to manage and control costs, schedule, and scope at a higher level than the work package.
        Show full summary Hide full summary

        Similar

        Aggression mind-map for A2 AQA Psychology
        poeticjustice
        SSAT Verbal Questions (Analogies)
        philip.ellis
        FCE Opposites Practice
        miminoma
        Lord of the Flies - CFE Higher English
        Daniel Cormack
        Modern Studies - Democracy in Scotland/UK.
        Daniel Cormack
        GoConqr Quick Guide to Getting Started
        Andrea Leyden
        AQA GCSE Biology B1- Quiz
        Ethan Beadling
        chemistry: c2
        kristy baker
        Using GoConqr to study Economics
        Sarah Egan
        Genes, The Genetic Code, DNA and Chromosomes
        Bee Brittain
        Types of Learning Environment
        Brandon Tuyuc