Created by Molly Hills
almost 10 years ago
|
||
What is the way of remembering the system development life cycle steps?
What are the steps in the SDLC?
Why is it important to define the problem correctly?
Why are both the Manager and Analyst important?
What is a Feasibility Study?
What types of Feasibility is there?
What are the ways in which information can be gathered?
What is the purpose of the Analysis stage?
Why do we need a Requirement Specification?
What is in the Requirement Specification?
What is a Data Flow Diagram?
What is a System Flow Chart?
What is a Entity Relationship Diagram?
What happens during the design stage?
What is a Design Specification?
What does the Design Specification contain?
Why must the new system be evaluated and tested before use?
How is testing done?
What are the four different ways installation can occur?
Advantage and Disadvantage of a Direct Changeover
Advantage and Disadvantage of a Parallel Changeover
Advantage and Disadvantage of a Pilot Changeover
Advantage and Disadvantage of a Phased Changeover
Name and Describe the three types of Maintenance
Four parts of a System User Manual
Three parts of the Technical Manual
What is the Spiral Method?
What is Prototyping?
Benefits and Drawbacks of R.A.D
What is R.A.D?