Muhammad Aqib
Quiz by , created more than 1 year ago

Hell Aqib Quiz on Important (ADSE I), created by Muhammad Aqib on 20/06/2019.

618
0
0
Muhammad Aqib
Created by Muhammad Aqib over 5 years ago
Close

Important (ADSE I)

Question 1 of 40

1

Which of the following statement about composite structure diagram element are correct?

Select one or more of the following:

  • Ports are modeled as small squares

  • Ports appears on the boundary of an object

  • Collaboration element is represented by a rectangle

  • Collaboration occurrences show instances of collaboration

Explanation

Question 2 of 40

1

Which of the following statements are true about the Subsystem?

Select one or more of the following:

  • Subsystems are smaller systems within a large system

  • A subsystem realizes one or more interfaces. Which define the behaviour it can perform

  • It may be represented as a UML packagcustosche or a set of operations

Explanation

Question 3 of 40

1

Which of the following situation , aggregation may be appropriate?
1. An object is physically composed of other objects.
2. An object is logical collection of other object.
3. An object can physically contain other objects.

Select one of the following:

  • 1,2

  • 2,3

  • 1,3

  • 1,2,3

Explanation

Question 4 of 40

1

A_________ is represented as a task of zero duration showing an important achievement

Select one of the following:

  • Milestone

  • Schedule

  • Project Phase

  • Tracker

Explanation

Question 5 of 40

1

By default, MS Project 2010 accrues resource costs ______________

Select one of the following:

  • On a prorated basis

  • At the start of the project

  • At the end of the project task

  • As soon as the specific task starts in the project

Explanation

Question 6 of 40

1

In Ms project 2010, project managers can use the _________ field in the Resource sheet to designate resources with estimated rates or costs that update with actual rates as the project progresses

Select one of the following:

  • Material

  • Code

  • Work

  • Resource

Explanation

Question 7 of 40

1

By default, all tasks in MS Project are ____________

Select one of the following:

  • Fixed units tasks

  • Fixed duration tasks

  • Fixed work tasks

Explanation

Question 8 of 40

1

Increasing the number of resources of a task will __________ the duration and decreasing the resources will _________ the duration of the task

Select one of the following:

  • Increase, Decreases

  • Decreases, Decreases

  • Decreases, Increase

  • Increase, Increase

Explanation

Question 9 of 40

1

Which of the following task types MS Project dose not considered as effort – driven tasks by default?

Select one or more of the following:

  • Fixed duration

  • Fixed work

  • Fixed units

  • Fixed time

Explanation

Question 10 of 40

1

MS Project 2010 comes with a unique feature of saving a project baseline data up to _________ times during the project life cycle

Select one of the following:

  • 6

  • 10

  • 11

  • 15

Explanation

Question 11 of 40

1

Which of the following are elements of the custom groups?

Select one or more of the following:

  • Field type

  • Field name

  • Order

  • Field group

Explanation

Question 12 of 40

1

Which of the following leveling order delays or splits the task with the highest ID number in the project?

Select one of the following:

  • Standard

  • ID only

  • Priority

  • Priority, Standard

Explanation

Question 13 of 40

1

Which of the following tracking method is useful if managers want to present in their weekly status meeting. the work hours and costs put in during that week?

Select one of the following:

  • Task-total

  • Task-time phased

  • Assignment-total

  • Assignment-timephased

Explanation

Question 14 of 40

1

Cost performance is the difference between earned value and ____________

Select one of the following:

  • Total value

  • Planned value

  • Actual cost

  • Project

Explanation

Question 15 of 40

1

By default, Gantt Charts in MS Project following a _______ and________ color for the taskbars

Select one or more of the following:

  • Green

  • Blue

  • Orange

  • Red

Explanation

Question 16 of 40

1

___________ produces information reliably grounded in the observed behaviour of a system

Select one of the following:

  • Walkthroughs

  • Verification

  • Validation

  • Testing

Explanation

Question 17 of 40

1

________ produces value indirectly through information about valuable system behaviors.

Select one of the following:

  • Testing

  • Walkthroughs

  • Validation

  • Verification

Explanation

Question 18 of 40

1

Performing a test is a _________activity

Select one of the following:

  • Physical

  • Logical

  • Technical

  • Non-technical

Explanation

Question 19 of 40

1

Which of the statements about testing principles is true?

Select one of the following:

  • Testing resources are limited

  • It is impossible to test everything

  • Testing is based on the design created.

  • Testing begins after the modules are integrated

Explanation

Question 20 of 40

1

Testing is based on ___________

Select one of the following:

  • Design team requirements

  • User requirements

  • Design outputs

  • Code developed

Explanation

Question 21 of 40

1

Identify the measurement areas of Motorola Quality Policy for Software Development
(QPSD).

Select one or more of the following:

  • Delivered defects and delivered defects per size

  • Total effectiveness throughout the process

  • Estimation accuracy

  • Decrease software defect density

Explanation

Question 22 of 40

1

How can users enter the task information in the MS Project?

Select one or more of the following:

  • Using the Gantt table

  • Importing tasks from Excel or Outlook

  • Importing tasks from Word document or project table

  • Using the Task information dialog box via the Gantt Chart view

Explanation

Question 23 of 40

1

In which of the following situation, any two tasks can become a predecessor-successor pair?

Select one or more of the following:

  • When they both auto scheduled.

  • When they have a timing relationship between them.

  • When they share resources between them.

  • One cannot Start before another finishes

Explanation

Question 24 of 40

1

Which of the following diagram is a pictorial representation of a system’s functions? Functions from part of various processes that are executed for a system.

Select one of the following:

  • Structured Analysis

  • Dataflow Diagram

  • Graph designing

Explanation

Question 25 of 40

1

The project size can be measured by using the Program Complexity Method.

Select one of the following:

  • True

  • False

Explanation

Question 26 of 40

1

Which of the following helps us to find answers to questions related to data processing applications such as identifying the primary data object to be processed by the system, the composition of each data object and the attributes which describe the object?

Select one of the following:

  • Data Modeling

  • System Elements

  • Data Object or Entities

Explanation

Question 27 of 40

1

Attributes define the properties of a data object. It may serve which of the following purpose?

Select one of the following:

  • Name an instance of the data object.

  • Describe the instance.

  • Make references to another instance in another table.

  • All of the above.

Explanation

Question 28 of 40

1

Relationships can be bi-directional. Data object, attributes and relationships from the basic elements of data modelling and provide the basis for understanding the information domain of a problem.

Select one of the following:

  • True

  • False

Explanation

Question 29 of 40

1

__________ IS THE SPECIFICATION OF THE NUMBER OF OCCURRENCES OF ONE OBJECT THAT CAN BE RELATED TO NUMBER OF OCCURRENCES OF ANOTHER OBJECT.

Select one of the following:

  • MODALITY

  • CARDINALITY

  • ENTITY

Explanation

Question 30 of 40

1

The term __________ can be applied to a person, place ,thing ,object or event.

Select one of the following:

  • Modality

  • Cardinality

  • Entity

Explanation

Question 31 of 40

1

Bubbles within a Data Flow Diagram are used to represent data stores.

Select one of the following:

  • True

  • False

Explanation

Question 32 of 40

1

Which of the following is an organized listing of all data elements that are pertinent to the system with precise, rigorous, definitions so that both user and system analyst will have a common understanding of inputs, outputs ,components of stores and intermediate calculations?

Select one of the following:

  • Control Flow

  • Data Dictionary

  • Cardinality

Explanation

Question 33 of 40

1

An Entity- Relationship diagram identifies a number of components such as objects, attributes relationships and various type-indicators.

Select one of the following:

  • True

  • False

Explanation

Question 34 of 40

1

Which of the following defines the relationship among the major structural elements of the program?

Select one of the following:

  • Component-level design

  • Interface design

  • Architectural design

Explanation

Question 35 of 40

1

Which of the following describes how software communicates with system that interoperate within it and with people who use it?

Select one of the following:

  • Component-level design

  • Interface design

  • Architectural design

Explanation

Question 36 of 40

1

The _________ diagram is a form of activity diagram in which the nodes represent interaction diagram.

Select one of the following:

  • Differential Overview

  • Interaction Overview

  • Partial Overview

  • Activity Overview

Explanation

Question 37 of 40

1

The ________ diagram shows the internal structure of a class, component or collaboration, including its interaction points with other parts of the system.

Select one of the following:

  • Complex Structure

  • Medium Internal

  • Composite Structure

  • Definition Structure

Explanation

Question 38 of 40

1

The __________ diagram is composed only of packages and the dependencies between them

Select one of the following:

  • Namespace

  • Activity

  • Package

  • Use-case

Explanation

Question 39 of 40

1

Which of the following statements about the use-case model are correct?

Select one or more of the following:

  • The Use-Case model only consists of actors.

  • The Use-Case model allows users to validate the fact that the system will become what they expect.

  • The Use-Case model only consist of use-cases.

  • The Use-Case model serves as a contract between customers, users, and system developers.

Explanation

Question 40 of 40

1

Which of the following are types of project calendars in MS Project 2010?

Select one or more of the following:

  • Basic Calendar

  • Standard Calendar

  • Task Calendar

  • Resource Calendar

Explanation