A PRT that is purchased from an outside supplier does not need a material master.
Examples of PRT would include all EXCEPT:
Dies
Fixtures
Software Programs
Materials to be Processed
Gages
To assign a PRT to an operation on a routing you must have:
PRT Master
Material Master
PRT Master and Material Master
Production Version
None of the Above
Which supply chain player below will stock inventories and sell in small quantities to customers?
Retailer
Distributor
OEM Manufacturer
Supplier
Transporter
Which supply chain process below is involved in the sharing of information across supply chain partners?
Move
Return and Service
Store
Collaborate
Modern supply chains have N-tier levels.
Which supply chain flow is unidirectional from the back-end of the supply chain to the front end?
Information
Finances
Material
In which supply chain decision phase would you organize the customers into various segmentation groups?
Design
Planning
Execution
Forecast netting is the process of allocating available supplies to customer reps.
ERP applications such as SAP R/3 are used primarily for supply chain planning
Major ERP software vendors include all EXCEPT?
SAP
Oracle
i2 Technologies
The SAP ERP modules most related to supply chain management are:
PP/SD/PM
SD/HR/MM
MM/SD/QM
PP/SD/HR
PP/SD/MM
The hosting university for this course is:
UT-Dallas
LSU
USC
University of Wisconsin at Milwaukee
The process of changing the performance of the software without modifying the source code is called:
Administration
Configuration
Workflow
The number of tiers in the SAP ERP System are?
1
2
3
4
5
The 3 types of data in any SAP ERP system are:
Translational, organization, master
Organization, transaction, translational
Client, Company Code, Plant
Organization, master, transaction
Which organizational level would be associated with the production and storage or valuated goods?
Client
Company Code
Plant
Storage Location
A material that is built in more than one plant may share a common material master.
A material master code that will determine which departments may view and modify the data is the:
Industry Sector
Plant Sector
Configuration file
Material Type
A material description is a example of which level of the material master hierarchy?
Storage
Plant and Storage
All of the above
The standard procurement type code used for buying from outside suppliers is?
E
F
X
S
SU
Which of the following is not a valid level of the BOM master?
Header
Item
Sub-item
None of the above
The 4 key organizational levels relevant to SCM are:
Client, Company Code, Sales Organization, Division
Company Code, Plant, Sales Organization, Division
Company Code, Sale Organization, Division, Storage Location
Client, Company Code, Plant, Storage Location
A Bill of Material will include the following for each component EXCEPT
Material Number
Material Supplier
Usage quantity
Unit of Measure
The BOM Master is integrated with the Sales Order Entry system
List the three BOM technical types
Simple, Complex, Variant
Simple, Alternative, Variant
Alternative, Variant, Conditional
Simple, Alternative, Conditional
For a given plant, two different sets of component materials may be used to create the same material. In this case you wold construct:
A simple BOM
An alternative BOM
A variant BOM
For a given plant, two different sets of component materials may be used to create the same material. In this case the BOMs constructed will have:
The same internal BOM number
Different internal BOM numbers
Name at least 3 types of purchasing master data in SAP ERP system
Vendor master, material master, client
Vendor master, purchasing info record, Bill of Material
Vendor master, company code, purchasing info record
Vendor master, purchasing info record, scheduling agreement
The vendor master is integrated to the SAP financial accounting modules.
Which master data object below does not require a purchase order to be created?
Purchasing information record
Contracts
Scheduling agreements
Quota arrangements
Which purchasing object below is an official document sent from a company to a supplier?
Purchase requisition
Purchase order
Planned order
Purchase requisitions may be manually created.
A valid work center in SAP may consist of:
People (employees)
Machines
Production Lines
A setup time activity on a work center will be defines by its:
Utilization rate
Efficiency rate
Standard setup key
Standard value key
Standard work center key
Which field in the work center will define the control elements for an operation performed at that work center?
Standard machine key
Formula fields
Control key
Work center key
The valid capacity categories that may be defines for a work center include:
Material, storage, labor
Energy, material, machinery
Storage, labor, machinery
Transportation, material handling, labor
All factory calendars will contain the same public holidays.
Factory calendars are what type of SAP data?
Organizational
Master data
Transaction data
A task list is a series of steps or process flow that will complete a task.
The task list that is most often used in a job shop production environment is:
Rate routing
Standard routing
Master recipe
Reference routing
Inspection plan
A routing may have no more than 10 operations.
Routings are integrated into which other SAP module?
Financials (costing)
Capacity planning
Demand management
Financials (costing) and Capacity planning
Capacity planning and Demand management
A routing group number is assigned
Through the material master
Through the BOM master
By the user
By SAP
A routing has a one-to-one relationship with a specific material. That is, each material must have its own unique routing.
A tool that may significantly reduce the time-to-market for a new product is:
Quality Function Deployment
Deterrent Engineering
Concurrent Engineering
SAP Engineering
A job shop production process is characterized by high volume, high variety, flexible equipment and intermittent production
The two major master data objects created in the Production Definition Process are:
Material Master and Work Center
Material Master and Bill of Material Master
Work Center and Purchasing Info Record
Work Center and Routing
The Quality Function Deployment Tool is also known as The House of Quality.
In Transition Planning a company may employ the following strategies EXCEPT:
Price discounts
Promotions
Ramping down current production
False advertising
Salvage sales to consolidators
The two major master data objects created in the Product Definition Process are:
Material Master and Scheduling Agreement
Bill of Material Master and Purchasing Info Record
Vendor Master and Purchasing Info Record