This is a timed quiz.
You have 1 hour to complete the 120 questions in this quiz.
------- Function returns the starting position of one string within another, and is case sensitive?
Find (Instring)
search
start
instring (start)
In which type of testing, look and feel consistency comes?
Usability
GUI
Basic Functional...
All
The basic criteria to be followed while testing a web application are
Flow
All-path
Page
Hyperlink Testing
------ Key techniques used in security testing are
SQL injection
Phishing
Vulnerability
6. In which stage QE starts I. Design II. Development
I
II
Both
None
------- Are interfaces of web application
Application sever interface
DB server interface
Web Server Interface
Web & application server interface and application &DB interface
A new test case is added in QC using
Add new test case
Add new test set
New test case
New test set
-------Testing is critical in web application testing
Compatibility
DB
page
usability
10. ------ is a way of attempting to acquire information such as Usernames, password, and Credit card details by masquerading as a trustworthy entity in an electronic communication.
Stress testing is -----(check box)
Memory leaks
Race Conditions
Synchronization issues
To accommodate future loads, you need to know how many additional resources are necessary to support future usage levels.
Capacity testing
load testing
stress testing
smoke testing
________is responsible for installing the solution into the PROD environment.
Release Management
Test team
development team
production team
Simulators play big role when are no mobile devices available for testing.
Find Bugs is a static analysis tool that examines your class or JAR files.
Principles of BDD
Enough is enough
Deliver stakeholder value
It’s all behavior
Exploratory testing
It is important that when a defect is raised, it is generated through test lab.
Defect leakage is because of ----
Missed Requirement
Test Coverage Inefficiency
Tester’s Inefficiency
All types of templates are available in c2.0.
Process types of templates are available in c2.0.
It is not needed to exclude a project from PHS score.
Closing a WMP
Closing a project
Set IE factor
Which projects are ported to c2.0 from ESA?
Proposal
Bench
External
Administrative
QC has defect tab for defect management
In defect tab what we can done….
Defect reports
Create
Manage
Update
Initial stage of software life cycle is
Requirement Analysis.
design
coding
maintenance
Which is not the type of severity?
Severe
High
Low
Critical
Medium
Baseline RTM is exit criteria for test execution
Exit criteria is used to
Determine when the test case is completed
Defines when the test case level is complete
defines the progress
show exit status
Junit4 allows grouping of test cases
Documenting requirements is used to know the problems of the system.
Cross browser compatibility testing can be automated.
Filtering can be used for the data manipulation and data retrieval.
QC allows the following features. extra option 'favorites'
Filter and cross filter records
Sort and group sort records
Snapshot
Alerts and follow up flags
All of the above
Dashboard benefits
Manage risk of mission-critical applications
shows those alerts which are critical
alerts the time left so that SLA is met
A project metrics once closed can opened by reopening it
….. Gives 100% test coverage
Branch coverage
Statement coverage
RTM
all coverage
What type of testing done by developers
Alpha
Beta (done by testers)
Gamma
Compatibility and migration testing
Which factors that depends on project
Severity
Release
Developer
What are the types of testing techniques
Dynamic
Static
Experience Based
No testing
------- testing is performed before the application is rolled out?
UAT
System
Integration
Regression
Pareto analysis is based on classical 80/20 rule.
Pareto analysis using the following tools.
Why –why analysis
Fishbone (or) cause & effect diagram
Pareto analysis is used to _________ for potential identify the defects.
root cause analysis(RCA)
cause analysis
Synthetic analysis
CAR is the combination of pareto analysis &root cause analysis
Testing forms are
Junit
TestNG
JTesting
a & b
all
Defect tracking is not a good suggestion for testing.
Metrics frequency can be selected by enabling
Enabling metrics
Enable testing metrics
Benchmarks
Test data
OLBM stands for……
Organizational level bench mark
Operational level bench mark
optional level benchmark
orthogonal level bench mark
Types of review
Informal review
Walkthrough
Technical review
Inspection
All of the above.
No formal process
May take the form of pair programming or a technical lead reviewing designs and code result may be documented
Varies in usefulness depending on the reviewers
Main purpose: inexpensive way to get some benefit
Database testing is
Checking tables
Writing queries
Procedures
Non functional requirements
Stress testing requirement
Portability
Performance
----- Tool used to identify the source code, physical application that is causing the bottle neck.
Silk performer
Rational performance tester
Qtest
HPLoad Runner
Goal analysis is not identity the in completed , inconsistency requirement.
-------- Tool is used to identity whether all the functional specifications are met.
QTP
DTM
Load Runner
Testing metrics are enabled --------hrs
24
36
48
.........
Cannot generate various defect reports from QC defect tab
When u open a project in QC it open & display module in which v r last working
Bug triage meeting are project meetings in which open bugs are divided into categories
Which of following are not key task for defect tracking (radio?)
Retest defects and repair open defects
Analyze defect data
Add defect and Review New defects
Which of the following is broken down individual task such as processes, decisions,& then connected
Activity diagram
Use case
Requirement
none
checking if communication is proper b/w web server- Application server and Application server – database server and vice versa
Server interface,
internal interface,
External interface
What comes just before test execution .............
Test Development
maintenence
Test run
Select valid defect types
Functional
Developmental
Rational
Network
Which is not COQ
Testing
Production
Prevention
Appraisal
Frequent code check-in pushes developer to create modular, less complex code
When annotation in Junit4 replaces the setup method in Junit3 (eLearning)
Before Class
After class
Between Class
While designing test case very common mistakes we do
Perform a through clean up
Incomplete , incorrect or incoherent set up
Write too short test cases
Unclear about test result
miss a step
Action verb” used in Test scenario
Verify
Validate
Evaluate
Test
connect
Priority is criticality of test case
Project repository is automaticaly created wen v create a project to store document
Version control system is feasible for ____________
Test plan and business modeling
Test resource
All listed
Key task for running test (radio)
Create test sets
schedule runs
run test and analyze test results
Who will generate defect report?
PM
TL
TM
developer
tester
Tools of Automation
Load runner
Rational robot
silk test
What are the benefits of release modules (Release and cycle management) in QC??
Manage projects and assests against release and cycles
Track release progress
Gain visibility into release readiness and release quality
Compare releases and cycles for conti process impro
What are the tools used for defect tracking??
Excel
QC
MS Word
What does MCDC stand for?
Modified condition/Data coverage
Modified Condition/Decision Coverage
Mature Condition/Data Coverage
Abusive language should be used for Effective Defect logging
Metrics porting b/w Prolite & C20 occurs
Once in month
Every 24 hour
Every hour
How to create bug reports (radio)
Single bug in multiple reports
Multiple bugs in single single report
single bug in single report
All above
C20 has provision to add Custom Metrics
Forcing error conditions in System is
Exception
Negative
Exception or negative
It is important that defects encountered during test execution are created through test lab
Type of req which satisfies the needs of customer or the consumer directly interacts with
operational req
functional req
technical req
transitional req
Status of the defect when it is logged
new
open
deferred
rejected
Where is IDE score card available in the C20
Process
governance
package
Module to store test cases that are to be executed
Test lab
test plan
test set
Process package in C20 can be modified according to project needs.
Which of the following is not a test execution metrics?
test design coverage
test effectiveness
no of defects
Steps in load testing (stress)
identify scenarios
identify load
Simulate load
Identify TC
Calculate metrics
Type of testing good for automation
Regression testing
Retesting
Select the purpose of use case modeling
identify capsules to encapsulate data
actor system interaction
to identify prototype test cases
Select the type of testing which can be automated
regression
functional
load
performance
stress
How many steps on root cause analysis
5
4
7
8
Best defect prevention technique for long time
5 why analysis
Pareto analysis
Cause effect
RCA
Type of dynamic technique
BVA
Error guessing
Reviews
All the defects are not process defects?
In testing phase all the defects are application defects.
Expansion of BDD
Behavior Driven Development
Basic Data Development
Behaviour Driven Deployment
Behaviour Driven Data
Risk based technique is a technique of test execution?
Defects found should be tracked on test lab
Passive Voice should be used to reproduce defects
_______is a structure for documenting the function required for a system, usually involving software whether that is new or being changed
Prototype
User Story
Test Case
Data validation -----check box
Provides Message to define what the input you expect for cell is
Can be applied to cells even when data exists in old
Provides ability to set error message when user enter an invalid data
Useful even when the workbook is protected and shared
Restricts types of data entry in cell by using validation criteria
Baseline is a snapshot of library at a specific point of time
Advantage of unit testing
Faster debugging
Faster development
Better design
Regression tool
Reduce future cost
Defect aging is the different b/w the date when object fixed and the detection date
Best environment to test
Pre-production environment
Production Environment
Test Environment
QA Environment
Pre-requisite means
Initial set up
what we need
prior information
Continuous integration means applying quality controlled after Dev.
Benefits of good requirements
Agreement among and stake holders
Sound basis for resource
Improved sys usability
Test Development effort is combined of Test cases and test scenarios
Goals of defect triage meeting
Defer to next development phase
Prioritize defects
Defect scrap
Implement
Use case is a collection of success and failure scenarios description actor using a system to support a goal
Mobile software testing includes (device)
Functional testing
Usability testing
User interface Testing
Performance and stress testing
Load testing
Review Defect Density (check box)
Measure of teams efficiency in designing test cases without review defects
Total no of review defects/actual project size
From which status defect can be moved to deferred status
Assigned or open
Rejected
Reopen
Cancelled
Cognizant uses this tool for model based testing
Smartest
Requisite pro
ADAPART
Application Defects are caused due to
Coding Error
Missed requirement
Incomplete req document
Test plan