❌ Includes all RDT&E contract and in-house activities needed to design and test the system.
Flyaway Cost. Refers to the cost of procuring prime mission equipment.
❌ Includes costs for Prime Mission and Support Equipment, along with warranties, engineering changes, and the first destination transport costs.
❌ Includes all Weapon System Costs, plus costs for initial spares and repair parts. Used to compute APUC.
❌ Refers to the complete cost of a ready-to-operate system, including Development Costs and Procurement and Facilities Costs. Used to compute PAUC.
❌ All costs associated with operating, modifying and maintaining and supporting a system in the DoD inventory.
❌ The total cost to the Government of a program over its full, useful life.
Drag and drop to complete the text.
Development Cost.
Development Cost.
Weapon System Cost.
Weapon System Cost.
Procurement Cost.
Procurement Cost.
Program Acquisition Cost.
Program Acquisition Cost.
Operating and Support Cost.
Operating and Support Cost.
Life Cycle Cost.
Life Cycle Cost.