Question 1

Question
Who authors the BIM Execution Plan?
Answer
  • The BIM Manager
  • The Employer
  • The Principal Consultant
  • The BIM Coordinator

Question 2

Question
When should the BIM Execution Plan be authored and signed off?
Answer
  • When Documentation phase starts
  • Before Design begins
  • Before Construction begins
  • When project handed over to employer for Facilities Management

Question 3

Question
The BIM Execution Plan should include:
Answer
  • Project Goals
  • BIM Deliverables
  • Process for BIM
  • All of the above

Question 4

Question
Hardware and Software requirements should be included in the BIM Execution Plan
Answer
  • True
  • False

Question 5

Question
The "BIM Use Case Template" in Appendix A is identical to the SIngapore BIM Guide Appendix B "Objectives and Responsibilities Matrix"
Answer
  • True
  • False
Show full summary Hide full summary

Similar

German- Intermediate
PatrickNoonan
Biology AQA 3.1.3 Osmosis and Diffusion
evie.daines
Break-even Analysis - FLASH CARDS
Harshad Karia
Maths Revision
Asmaa Ali
Physics P3 Fashcards
Holly Bamford
GCSE AQA Biology 2 Plants & Photosynthesis
Lilac Potato
Marriage and Family Life - Edexcel GCSE Religious Studies Unit 3
nicolalennon12
GCSE Chemistry C4 (OCR)
Usman Rauf
Historical Context of The Handmaid's Tale
Summer Pearce
Linking Rossetti and A Doll's House
Mrs Peacock
Specific Topic 7.3 Timber selection
T Andrews