Current BIM implementation is still based on a Hybrid method
Answer
True
False
Question 3
Question
To generate the topography model, the Architect will use topography drawings of the existing site, provided by the Registered Surveyor / Civil Engineers
Answer
True
False
Question 4
Question
During Schematic design phase, the Architect do not produce
Answer
Layout plans 1:200 scale
Outline structural and mechanical design
Fabrication details
Generic wall / window / door components
Question 5
Question
During Detail Design phase, the Architect would produce:
Answer
Layout plans showing layer construction 1:100 – 1:50 scale
Produce 1:20 – 1:5 detail drawings
Construction sequencing
Question 6
Question
During Details Design phase, Model Exchange is done continuously as the design and project progresses. Early clash detections are performed to lessen conflict of elements before construction.
Answer
True
False
Question 7
Question
When continue and develop Architecture model to Contractor’s model, basic elements required from the Architecture model are:
Answer
X, Y, Z Coordinates
Topography (Existing Site Model)
Topography (Proposed Site Model)
Grid and Level
Building components: Wall, Architectural Column, Door, Window, Slab/ Floor, Ceiling, Fixtures, Furniture (optional), Facade, Railing, etc.