An architect's preliminary estimate of construction cost would consider all of the following EXCEPT: I. labor and materials supplied by the owner. II. cooling towers. III. land acquisition costs. IV. the architect's fee. V. metal curtain wall systems
Answer
  • A. I only
  • B. I and IV
  • C. None, everything would be considred
  • D. III and IV

Question 2

Question
An architect who prepares a preliminary estimate of construction cost according to the subsystems method
Answer
  • A. considers one set of subsystems for concrete buildings and a different set for steel buildings.
  • B. can easily analyse the cost of alternative exterior wall systems.
  • C. would most likely use this method during the schematic design phase.
  • D. would be performing an additional service under the AIA Agreement between Owner and Architect.
Show full summary Hide full summary

Similar

Mind Maps Essay Template
linda_riches
Epithelial tissue
Morgan Morgan
BIOLOGY B1 5 AND 6
x_clairey_x
ICT Key Terms Quiz - Part 1
Mr Mckinlay
GCSE Science - B1 - You and Your Genes - Genes, Chromosomes and DNA
GeorgeHaines
FUNCTIONALIST ROLE OF EDUCATION
ashiana121
Photosynthesis and Respiration
Jessica Phillips
Contract Law
sherhui94
1PR101 2.test - Část 8.
Nikola Truong
OP doplnovaci otazky II.
Helen Phamova
Anatomie - sistemul digestiv 1
Eugeniu Nicolenco