Question 1

Question
CAR is the combination of pareto analysis and root cause analysis.
Answer
  • True
  • False

Question 2

Question
Goal analysis cannot be used to identify the incomplete, inconsistency requirements.
Answer
  • True
  • False

Question 3

Question
. Where we can view the reports with the graphical representation
Answer
  • Dashboard
  • Motherboard

Question 4

Question
Step-by-step analysis of a variable can be done using Watch window
Answer
  • True
  • False

Question 5

Question
After which state the defect status can be changed to deferred
Answer
  • a. Re-Open
  • b. Closed
  • c. Rejected
  • d. None of the above(Open or assigned)

Question 6

Question
Risk based testing will – Analyze and prioritize the risk
Answer
  • True
  • False

Question 7

Question
OATS is used for pair wise testing of all combinations
Answer
  • True
  • False

Question 8

Question
Browsers used for compatibility testing
Answer
  • a. AOL
  • b. Internet explorer
  • c. Netscape
  • d. Opera

Question 9

Question
Defect management involves
Answer
  • a. Analysis
  • b. Create
  • c. Update

Question 10

Question
Difference between functional specification and actual execution is calledDefect
Answer
  • True
  • False

Question 11

Question
Test case is a controlled experiment
Answer
  • True
  • False

Question 12

Question
Review is a type of ____________ Examination
Answer
  • a. dynamic
  • b. static
  • c. Fixed
  • d. Strategic

Question 13

Question
Path analysis uses the activity diagram for test case creation
Answer
  • true
  • false

Question 14

Question
Path analysis + model based testing Activity diagram
Answer
  • True
  • False

Question 15

Question
Each Test Scenarios are assigned to a case specific values
Answer
  • True
  • False

Question 16

Question
Long term defect elimination –
Answer
  • a. RCA
  • b. pareto Analysis
  • c. Casual analysis

Question 17

Question
Which level we can find the defects
Answer
  • a. design
  • b. requirements
  • c. all of the above

Question 18

Question
If we find a defect at the end of TEST EXECUTION
Answer
  • a. Report to stakeholders and business analyst to get the sign off
  • b. Reject the defect
  • c. Report to team lead
  • d. Report to project lead.

Question 19

Question
. If we get an error when file is downloaded from the application —radio button
Answer
  • a. Internal Interface
  • b. External Interface
  • c. Server Interface
  • d. All of the above

Question 20

Question
When we open an application through a browser with underlying the os---- testing we perform
Answer
  • a. compatibility
  • b. content management
  • c. os

Question 21

Question
no.of runs in JUNIT
Answer
  • 3
  • .8
  • ----6(six)

Question 22

Question
--------- is used to calculate the maturity IDE repots score i) Data quality ii) Planning granularity iii) Testing Metrics iv)
Answer
  • a. I,iii,iv
  • b. ii,iii,iv
  • c. all
Show full summary Hide full summary

Similar

Characters in "King Lear"
eleanor.gregory
Biology : Basic Terms
Paul Fisher
Memory Key words
Sammy :P
Biology AQA 3.1.3 Cells
evie.daines
Realidad De Nuestra Identidad Cultural
53831
EEO Terms
Sandra Reed
GCSE AQA Chemistry - Unit 1
James Jolliffe
Financial Statements
Sharon Yates
Social Influence
Kizzy Leverton
NSI Test First day
Adedipe Odunayom
SFDC App Builder 1 (26-50)
Connie Woolard