Bilateral Aid Case Study - Cahora Bassa Dam

Descripción

Development Gap
aedolphin
Apunte por aedolphin, actualizado hace más de 1 año
aedolphin
Creado por aedolphin hace alrededor de 9 años
145
0

Resumen del Recurso

Página 1

Bilateral Aid Case Study - Cahora Bassa Dam (Mazambique) was built by the Portugese in the 1960s, but civil war prevented completion of it. However, only 1% of the homes have a direct electricity supply, and this HEP scheme has not changed this amount by very much. Most of the power is sold to South Africa, which boosts the economy but does not benefit citizens. It could meet most of the counties power needs.On the whole, the dam has increase the economy of the country, but it could produce more that is currently does. Also, it does not benefit the citizens of the country. River flow is very low because water is being held in reservoirs. The local shrimp industry has been destroyed. The local residents have has their livelihoods destroyed and they have not gained at all from the projects

Mostrar resumen completo Ocultar resumen completo

Similar

7 Técnicas para Aprender Matemáticas
maya velasquez
PASAPALABRA  sobre  ANATOMÍA
JL Cadenas
Apuntes de Literatura española S. XX - Narrativa del 98.
María Salinas
Test de Inglés para la Prepa Abierta 2
Raúl Fox
¿Qué sabes de Roma antígua? - EDUpunto.com
EDUpunto Por: Ernesto De Frías
Los 10 Mandamientos del Abogado
maya velasquez
Origen de la Filosofía: El paso del Mito al Logos
maya velasquez
Timeline Guerra Fría
Maitane Gajate
PARES CRANEALES
Jazmin Santana
Tema 4, Los paisajes de España
Mercedes Graves
FORMAS DE HACER NEGOCIOS INTERNACIONALES
yandsbernardo