Unit 205: Cold water systems - practice test

Descripción

A cold water practice exam
james crowley
Test por james crowley, actualizado hace más de 1 año
james crowley
Creado por james crowley hace más de 6 años
10846
1

Resumen del Recurso

Pregunta 1

Pregunta
When installing a new indirect cold water system, which of the following should happen, according to the Water Regulations?
Respuesta
  • a. One tap, normally the kitchen sink, should be drawn directly from the supply pipe
  • b. One tap, normally the kitchen sink, should have a dedicated distribution pipe from the storage cistern
  • c. Mixer taps will require double check valves
  • d. Mixer taps should never be installed due to the pressure differences

Pregunta 2

Pregunta
According to BS6700 and the Water Regulations, a drain off valve should be installed:
Respuesta
  • a. At every draw off point
  • b. At every high point in the system
  • c. At every low point in the system
  • d. Above the cold water storage cistern.

Pregunta 3

Pregunta
Pin holing in copper pipework is commonly caused by:
Respuesta
  • a. Hard water
  • b. Acidic water
  • c. Alkaline water
  • d. Pure water.

Pregunta 4

Pregunta
While installing pipework in a property, you are called off site to another job. What would be the correct course of action with any open-ended pipework?
Respuesta
  • a. Place a warning label on every open end
  • b. Cap off with a push fit fitting
  • c. Warn the customer not to interfere with any pipework
  • d. Be as quick as you can to return.

Pregunta 5

Pregunta
One of the major problems when leaving a dead leg in a cold water pipe is:
Respuesta
  • a. Electrolytic corrosion
  • b. Pitting of pipework
  • c. Reduction in water flow
  • d. Possible bacterial growth.

Pregunta 6

Pregunta
The use of WRAS approved fittings when installing cold water pipework is:
Respuesta
  • a. A legal requirement
  • b. To be corrosion resistant
  • c. To avoid contamination
  • d. All of the above.

Pregunta 7

Pregunta
On the completion of a new cold water installation, the system has been proven sound. What would the next course of action be?
Respuesta
  • a. Visual inspection with the customer
  • b. Flush the pipework out then hand over to the customer
  • c. Prepare the benchmark certificate
  • d. Hand over to the customer.

Pregunta 8

Pregunta
What is the most cost effective way to repair a stop valve that has the head gear jammed open?
Respuesta
  • a. Replace the head gear only
  • b. Replace the whole valve
  • c. Leave in position, and install a new stop valve upstream
  • d. Repack the glands around the spindle.

Pregunta 9

Pregunta
When decommissioning a system, the correct procedure is to:
Respuesta
  • a. Turn off the water quickly to save any wasted water
  • b. Drain the system down then inform the customer
  • c. Inform the customer first then drain the system
  • d. Use a pump to drain down quickly.

Pregunta 10

Pregunta
What is this item?
Respuesta
  • a. Fullway gate valve
  • b. Drain off valve
  • c. Stop valve
  • d. Spherical ball valve.

Pregunta 11

Pregunta
What type of valve is shown in this diagram?
Respuesta
  • a. Spherical ball valve
  • b. Fullway gate valve
  • c. Stop valve
  • d. Drain off valve.

Pregunta 12

Pregunta
When installing a new water service pipe to a property, it should normally be buried between what depths?
Respuesta
  • a. 135mm to 1,750mm
  • b. 350mm to 750mm
  • c. 1,350mm to 1,750mm
  • d. 750mm to 1,350mm.

Pregunta 13

Pregunta
Identify item C in the diagram.
Respuesta
  • a. Warning pipe
  • b. Grommet for open vent
  • c. Screened vent
  • d. Inspection flap.

Pregunta 14

Pregunta
Which of the following materials is not allowed to be installed on new cold water systems?
Respuesta
  • a. Copper
  • b. Stainless steel
  • c. MDPE
  • d. Lead.

Pregunta 15

Pregunta
What type of valve is designed to shut off the supply of water in a cistern at a predetermined level?
Respuesta
  • a. Stop valve
  • b. Fullway gate valve
  • c. Float operated valve
  • d. Isolation valve.

Pregunta 16

Pregunta
The fluid category that offers a slight health risk to a customer is:
Respuesta
  • a. 1
  • b. 2
  • c. 3
  • d. 4.

Pregunta 17

Pregunta
The correct back flow protection device that would be installed prior to a shower mixer valve would be:
Respuesta
  • a. Single check valve
  • b. Double check valve
  • c. RPZ valve
  • d. Type AG air gap.

Pregunta 18

Pregunta
To protect category 1 water from category 3 water, what would need to be installed, according to the Water Regulations?
Respuesta
  • a. Single check valve
  • b. Double check valve
  • c. RPZ valve
  • d. Type AG air gap.

Pregunta 19

Pregunta
What would this item be used to test?
Respuesta
  • a. Pressure
  • b. Category of water
  • c. Flow rate
  • d. pH valve.

Pregunta 20

Pregunta
If a customer’s tap is dripping, what tool can be used to correct the situation?
Respuesta
  • a. Club hammer
  • b. Stillsons
  • c. Bradawl
  • d. Re-seating tool.
Mostrar resumen completo Ocultar resumen completo

Similar

Common Plumbing Principles practice test
james crowley
Unit 202: Electrical principles and processes for building
james crowley
Unit 203 Revision Question Bank No.2
Oliver Balay
Unit 201: Health and safety in building services engineering
james crowley
Unit 206: Domestic hot water systems practice test
james crowley
Colour theory quiz
james crowley
Unit 108 Above Ground Drainage
james crowley
Structure of the construction industry
james crowley
Applying paper to walls and ceilings level 1
james crowley
Producing specialist decorative finishes quiz
james crowley
Unit 103 - Environmental and Sustainability Measures in Domestic Dwellings
james crowley