Screeding Quiz

Descripción

Test sobre Screeding Quiz, creado por Steve Lockwood el 05/11/2014.
Steve Lockwood
Test por Steve Lockwood, actualizado hace más de 1 año
Steve Lockwood
Creado por Steve Lockwood hace alrededor de 10 años
428
0

Resumen del Recurso

Pregunta 1

Pregunta
1. How much mixed material is needed to complete a floor screed 5.000 m long by 4.000 m wide and 0.050 m thick?
Respuesta
  • 0.25 m3
  • 0.5 m3
  • 1 m3
  • 1.5 m3

Pregunta 2

Pregunta
2. Tools and equipment for floor screeding will generally include:
Respuesta
  • sweeping brush, trowel, float, mixer, shovel
  • splash brush, small tool, gauger, trowel, float
  • spirit level, trowel, buckets, mixer, float
  • levelling equipment, trowel, float, shovel buckets, mixer

Pregunta 3

Pregunta
Plastic sheeting below the structural floor is the:
Respuesta
  • damp proof membrane
  • vapour barrier
  • moisture trap
  • aid to curing the floor

Pregunta 4

Pregunta
The type of cement used in floor screeds is:
Respuesta
  • Masonry Portland
  • Extra Portland
  • Rapid Portland
  • Ordinary Portland

Pregunta 5

Pregunta
Sands used for floor screeding:
Respuesta
  • should contain a high proportion of fine grains
  • should contain a high proportion of large grains
  • can be any type
  • should be sharp and well graded

Pregunta 6

Pregunta
Ready-mixed screeds are:
Respuesta
  • prepared off site and delivered as required
  • prepared after work for the following day
  • prepared in the morning for use during the day
  • used only for self-levelling floors

Pregunta 7

Pregunta
Screed rails or battens are used to:
Respuesta
  • help delivery of screed material to the workstation
  • assist in forming the main area of floor
  • tamp down the surface of the screed
  • form channels for drainage

Pregunta 8

Pregunta
The purpose of a damp proof membrane is to:
Respuesta
  • assist the passage of moisture
  • assist in the curing process
  • allow the screed to dry out quickly
  • prevent the passage of moisture

Pregunta 9

Pregunta
Cracking of large area floors may be reduced by:
Respuesta
  • use of more cement
  • use of expansion strips
  • adding more sand
  • a self-levelling compound

Pregunta 10

Pregunta
Battens used as a guide for screeds may be:
Respuesta
  • set out from datum lines
  • laid at 50 mm depth
  • set out from base floor
  • laid to form 75 mm depth

Pregunta 11

Pregunta
The most accurate proportioning of floor screeding materials:
Respuesta
  • is by weight
  • is important near heavily trafficked areas
  • can be carried out using shovels
  • can be carried out using buckets

Pregunta 12

Pregunta
The correct consistency for floor screeding materials is:
Respuesta
  • as dry as possible
  • slurry like
  • semi wet
  • semi dry

Pregunta 13

Pregunta
Mixing of screed material:
Respuesta
  • does not have to be thorough as it will be spread by shovel
  • needs to be consistent or wear will take place
  • should be carried out as slowly as possible
  • can take place after water has been added

Pregunta 14

Pregunta
Compacting screeds results in a:
Respuesta
  • lightweight screed
  • quicker set screed
  • more dense screed
  • slower set screed

Pregunta 15

Pregunta
Compacting can be carried out with a:
Respuesta
  • screed rail
  • datum
  • rule or float
  • level

Pregunta 16

Pregunta
High volumes of ventilation:
Respuesta
  • will aid the setting process
  • will not affect the screeds after laying
  • will allow the cement to harden quickly
  • may make the surface of the screed dusty

Pregunta 17

Pregunta
The finish on a floor screed:
Respuesta
  • is not important as it will all be covered up
  • is important as it may show through the final covering
  • can be completed the next day
  • can be completed by the floor layer with the finish

Pregunta 18

Pregunta
Laying polythene sheet on the floor screed after laying will:
Respuesta
  • act as an accelerator to the set
  • produce an even surface
  • allow the cement to set naturally
  • keep the floor soft for the next process

Pregunta 19

Pregunta
The purpose of curing is to:
Respuesta
  • allow the cement to set and harden over a long period
  • produce an even surface
  • produce a lightweight screed
  • aid compaction to take place

Pregunta 20

Pregunta
Where drainage outlets are fitted:
Respuesta
  • the floor must be laid from this point
  • they can be repositioned later
  • the floor can be altered to fit when finish is applied
  • the drainage contractor will alter them to suit
Mostrar resumen completo Ocultar resumen completo

Similar

Examen de literatura universal
María Salinas
¿A qué tiempo y modo corresponde?
Remei Gomez Gracia
Causas principales de la Primera Guerra Mundial
crisferroeldeluna
Conceptos básicos de Economía
María Eugenia Méndez Piamba
Lectura afectiva básica
Titigz
GS-2. LAS GUARDIAS DE SEGURIDAD
antonio del valle
Prueba Matematicas
Deisy Medina
Fuentes del Derecho Mercantil
Jetzabell Guerre
Repaso de Trastornos hidroelectroliticos
Claudia Genoveva Perez Cacho
Asientos MAE
Donuts Donettes