Screeding Quiz

Descripción

Test sobre Screeding Quiz, creado por Steve Lockwood el 05/11/2014.
Steve Lockwood
Test por Steve Lockwood, actualizado hace más de 1 año
Steve Lockwood
Creado por Steve Lockwood hace casi 10 años
428
0

Resumen del Recurso

Pregunta 1

Pregunta
1. How much mixed material is needed to complete a floor screed 5.000 m long by 4.000 m wide and 0.050 m thick?
Respuesta
  • 0.25 m3
  • 0.5 m3
  • 1 m3
  • 1.5 m3

Pregunta 2

Pregunta
2. Tools and equipment for floor screeding will generally include:
Respuesta
  • sweeping brush, trowel, float, mixer, shovel
  • splash brush, small tool, gauger, trowel, float
  • spirit level, trowel, buckets, mixer, float
  • levelling equipment, trowel, float, shovel buckets, mixer

Pregunta 3

Pregunta
Plastic sheeting below the structural floor is the:
Respuesta
  • damp proof membrane
  • vapour barrier
  • moisture trap
  • aid to curing the floor

Pregunta 4

Pregunta
The type of cement used in floor screeds is:
Respuesta
  • Masonry Portland
  • Extra Portland
  • Rapid Portland
  • Ordinary Portland

Pregunta 5

Pregunta
Sands used for floor screeding:
Respuesta
  • should contain a high proportion of fine grains
  • should contain a high proportion of large grains
  • can be any type
  • should be sharp and well graded

Pregunta 6

Pregunta
Ready-mixed screeds are:
Respuesta
  • prepared off site and delivered as required
  • prepared after work for the following day
  • prepared in the morning for use during the day
  • used only for self-levelling floors

Pregunta 7

Pregunta
Screed rails or battens are used to:
Respuesta
  • help delivery of screed material to the workstation
  • assist in forming the main area of floor
  • tamp down the surface of the screed
  • form channels for drainage

Pregunta 8

Pregunta
The purpose of a damp proof membrane is to:
Respuesta
  • assist the passage of moisture
  • assist in the curing process
  • allow the screed to dry out quickly
  • prevent the passage of moisture

Pregunta 9

Pregunta
Cracking of large area floors may be reduced by:
Respuesta
  • use of more cement
  • use of expansion strips
  • adding more sand
  • a self-levelling compound

Pregunta 10

Pregunta
Battens used as a guide for screeds may be:
Respuesta
  • set out from datum lines
  • laid at 50 mm depth
  • set out from base floor
  • laid to form 75 mm depth

Pregunta 11

Pregunta
The most accurate proportioning of floor screeding materials:
Respuesta
  • is by weight
  • is important near heavily trafficked areas
  • can be carried out using shovels
  • can be carried out using buckets

Pregunta 12

Pregunta
The correct consistency for floor screeding materials is:
Respuesta
  • as dry as possible
  • slurry like
  • semi wet
  • semi dry

Pregunta 13

Pregunta
Mixing of screed material:
Respuesta
  • does not have to be thorough as it will be spread by shovel
  • needs to be consistent or wear will take place
  • should be carried out as slowly as possible
  • can take place after water has been added

Pregunta 14

Pregunta
Compacting screeds results in a:
Respuesta
  • lightweight screed
  • quicker set screed
  • more dense screed
  • slower set screed

Pregunta 15

Pregunta
Compacting can be carried out with a:
Respuesta
  • screed rail
  • datum
  • rule or float
  • level

Pregunta 16

Pregunta
High volumes of ventilation:
Respuesta
  • will aid the setting process
  • will not affect the screeds after laying
  • will allow the cement to harden quickly
  • may make the surface of the screed dusty

Pregunta 17

Pregunta
The finish on a floor screed:
Respuesta
  • is not important as it will all be covered up
  • is important as it may show through the final covering
  • can be completed the next day
  • can be completed by the floor layer with the finish

Pregunta 18

Pregunta
Laying polythene sheet on the floor screed after laying will:
Respuesta
  • act as an accelerator to the set
  • produce an even surface
  • allow the cement to set naturally
  • keep the floor soft for the next process

Pregunta 19

Pregunta
The purpose of curing is to:
Respuesta
  • allow the cement to set and harden over a long period
  • produce an even surface
  • produce a lightweight screed
  • aid compaction to take place

Pregunta 20

Pregunta
Where drainage outlets are fitted:
Respuesta
  • the floor must be laid from this point
  • they can be repositioned later
  • the floor can be altered to fit when finish is applied
  • the drainage contractor will alter them to suit
Mostrar resumen completo Ocultar resumen completo

Similar

Esquema de los Reyes Católicos♚♛
maya velasquez
Tablas de multiplicar
Carmen Giralda
Tabla periodica de elementos
maria_sfc_19
FARMACOLOGÍA DE LA MUSCULATURA ESQUELETICA
cass_baltazar
Los Reyes Católicos - Resumen
maya velasquez
La diversidad y el juego
nicolesanchezand
Diapositivas
Samuel Flores
Parte General Código Penal
MJ Maza
EL CAMINO DE STEVE JOBS
Evelyn Salazar
PLAN DE ASESORÍA TÉCNICA PEDAGOGICA EN VERACRUZ
DIRECCIÓN GENERAL DE EDUCACIÓN FISICA FEDERALIZADA
HINDUISMOA 6B_ANE
Ane Núñez Escudero