First (ADSE I) [Quiz 3]

Descripción

SOFTWARE QUALITY + SOFTWARE CONSTRUCTION + SOFTWARE PROCESS MEASUREMENT
Muhammad Aqib
Test por Muhammad Aqib, actualizado hace más de 1 año
Muhammad Aqib
Creado por Muhammad Aqib hace más de 5 años
414
0

Resumen del Recurso

Pregunta 1

Pregunta
What are the different quality standards?
Respuesta
  • SMDL
  • TickIT
  • SLOI
  • CMMI

Pregunta 2

Pregunta
What are tools which Quality objective can be met?
Respuesta
  • TQM
  • PCDQ
  • TSM
  • PDCA

Pregunta 3

Pregunta
Which one is not SQM process?
Respuesta
  • Verification process
  • Software life cycle process
  • Review process
  • Quality assurance process

Pregunta 4

Pregunta
Finding area of a program not exercised by a set of test cases is called__________
Respuesta
  • Defect Resolution
  • Coverage Analysis
  • Risk Management
  • Test Management

Pregunta 5

Pregunta
Checking Quality of software in both simulated and live environments is known as
Respuesta
  • Checking
  • Usability
  • Validity
  • Validation

Pregunta 6

Pregunta
The static system model exploit which type of relationship
Respuesta
  • Activity cost
  • Quality cost
  • Time cost
  • None of the above

Pregunta 7

Pregunta
Variation in debugging:coding ability has been reported to
Respuesta
  • 1:5
  • 1:8
  • 1:10
  • 1:2

Pregunta 8

Pregunta
Defects caught internally deal by discarding or repairing the defective items called
Respuesta
  • appraisal cost
  • internal failure cost
  • prevention cost
  • external failure cost

Pregunta 9

Pregunta
Coding and testing is done in following manner
Respuesta
  • cross_functional
  • ad_hoc
  • Bottom-up
  • Top-down

Pregunta 10

Pregunta
The largest percentage of total life cycle software cost is
Respuesta
  • Design cost
  • Coding cost
  • Maintenance cost
  • Testing cost

Pregunta 11

Pregunta
Construction produces high volume of
Respuesta
  • Configuration items
  • Design
  • Process

Pregunta 12

Pregunta
The fundamentals of software construction include:
Respuesta
  • Minimizing complexity
  • Anticipating change
  • Constructing for verification
  • Standards in construction
  • All of the above

Pregunta 13

Pregunta
Standards which directly affect construction issues include
Respuesta
  • Programming Languages
  • Unified Modeling Language
  • Mainframe
  • All of the above

Pregunta 14

Pregunta
We should construct software that allows bugs to be easily found and fixed.
Respuesta
  • True
  • False

Pregunta 15

Pregunta
Do Anticipation of change affect software construction.
Respuesta
  • True
  • False

Pregunta 16

Pregunta
Construction depends on which of the following:
Respuesta
  • degree of the life cycle model used
  • degree of designing process

Pregunta 17

Pregunta
System testing is done by
Respuesta
  • QA engineers
  • Developers
  • Quality Manager

Pregunta 18

Pregunta
Unit testing is done by
Respuesta
  • QA engineers
  • Developer
  • Quality Manager

Pregunta 19

Pregunta
Which of the following are Integration strategies
Respuesta
  • Big bang, top-down and bottom-up
  • Continuous integration
  • All of the above

Pregunta 20

Pregunta
The important decisions are taken during which of the following phases
Respuesta
  • Coding phase
  • Testing phase
  • requirements analysis and design

Pregunta 21

Pregunta
The AIS cycle allows for multiple iterations
Respuesta
  • True
  • False

Pregunta 22

Pregunta
There are _____ general architectures for assessment model
Respuesta
  • 2
  • 3
  • 4
  • 5

Pregunta 23

Pregunta
Model building includes only calibration
Respuesta
  • True
  • False

Pregunta 24

Pregunta
Software product measurement includes
Respuesta
  • size
  • structure
  • both a and b
  • only a
  • only b

Pregunta 25

Pregunta
Measurement is used to identify strength and weakness of processes
Respuesta
  • True
  • False

Pregunta 26

Pregunta
The personal software process is a part of
Respuesta
  • process model
  • experimental technique
  • analytical technique
  • benchmarking

Pregunta 27

Pregunta
Process measurement technique are classified into 3 types
Respuesta
  • True
  • False

Pregunta 28

Pregunta
Minimum requirement in CBA-IPI assessment method does not include data validation and collection
Respuesta
  • True
  • False

Pregunta 29

Pregunta
In staged process assessment model risk analysis forms which stage
Respuesta
  • 3
  • 4
  • 5
  • 6

Pregunta 30

Pregunta
The last stage in automation tools is
Respuesta
  • mockup
  • create
  • stage and test
  • release
Mostrar resumen completo Ocultar resumen completo

Similar

Important (ADSE I)
Muhammad Aqib
First (ADSE I) [Quiz 1]
Muhammad Aqib
Second (ADSE I) [Quiz]
Muhammad Aqib
La Segunda República
bsodepeliculas
Elementos de la música
martha.celorio
Mapas mentales con GoConqr
maya velasquez
"Formas de integrar TIC en un aula de clases"
Diana Peñailillo
LA METODOLOGÍA DE LAS BASES DE DATOS
Fernando Tapia
Sistema Cardiovascular
Kevin BD
II. LA ESCUELA AL CENTRO DEL SISTEMA EDUCATIVO
DIRECCIÓN GENERAL DE EDUCACIÓN FISICA FEDERALIZADA
UNIDAD 1-2-3. CONSTRUCTOS TEORICOS DEL APRENDIZAJE - PARADIGMAS DEL APRENDIZAJE-PSICOLOGIA Y APRENDIZAJE
veronica marin herrera