Pregunta 1

Pregunta
Risk diversification is an important strategy to handle risks: Can you fill in the right terms?
Respuesta
  • shift
  • avoid
  • endure
  • reduce
  • endure
  • avoid
  • shift
  • reduce
  • competitive
  • compensation
  • cooperative
  • internal
  • insurance
  • inacceptable
  • enhance
  • endure
  • extrapolate
  • reinforcements
  • recalls
  • reserves

Pregunta 2

Pregunta
We divide risk measurement into "quantitative" and "qualitative" methods. Can you fill in the right terms?
Respuesta
  • minimum loss
  • maximum loss
  • variation of loss
  • value at risk
  • estimation
  • quick and dirty
  • scoring model

Pregunta 3

Pregunta
FMEA is a risk management method in the product development process. Can you define it?
Respuesta
  • FMEA := Falsification Method in Engineering Analytics
  • FMEA := Failure Method in Engineering Analysis
  • FMEA := Failure Mode and Effect Analysis
  • FMEA := Failure Method and Effect Analytics

Pregunta 4

Pregunta
Within the FMEA method, the calculation and evaluation of the RPN (Risk Priority Number) is crucial. Are you able to check if the following statements are true (or false)?
Respuesta
  • RPN helps the responsible risk management team to prioritize risks.
  • RPN is calculated by multiplying Severity (S), Occurrence (O), and Detection (D).
  • Severity (S): A high severity ranking indicates severe risk.
  • Occurrence (O): A low occurrence rank reflects high failure occurrence potential.
  • Detection (D): A high detection rank reflects high detection capability.
  • Detection (D): A high detection rank reflects low detection capability.
  • Occurrence (O): A high occurrence rank reflects high failure occurrence potential.
  • Severity (S): A low severity ranking indicates severe risk.
  • The maximum value of RPN is 10x10x10 = 1000.

Pregunta 5

Pregunta
Let's bring risk management to the context of strategical procurement. Can you fill in the missing text?
Respuesta
  • complexity
  • globalization
  • volume
  • politics & laws
Mostrar resumen completo Ocultar resumen completo

Similar

5) Meats & Poultry (and others)
John Goalkeeper
Ecuaciones de Segundo Grado
Diego Santos
Las Ciencias Sociales
paolaf_mata99
Historia de la Filosofía
maya velasquez
Aula Invertida
Diego Santos
Mapa Conceptual
Laura Perez6723
PRIMERA AUTORIDAD RESPONDIENTE
jhovanymunoz
Cáncer de Ovário
Luz Moor
Estructura de la Constitución Española de 1978
Joaquín García Venegas
EL DIÁLOGO
Eva Sánchez
SOSTENIBILIDAD
Carlos Párraga