Pregunta 1

Pregunta
Risk diversification is an important strategy to handle risks: Can you fill in the right terms?
Respuesta
  • shift
  • avoid
  • endure
  • reduce
  • endure
  • avoid
  • shift
  • reduce
  • competitive
  • compensation
  • cooperative
  • internal
  • insurance
  • inacceptable
  • enhance
  • endure
  • extrapolate
  • reinforcements
  • recalls
  • reserves

Pregunta 2

Pregunta
We divide risk measurement into "quantitative" and "qualitative" methods. Can you fill in the right terms?
Respuesta
  • minimum loss
  • maximum loss
  • variation of loss
  • value at risk
  • estimation
  • quick and dirty
  • scoring model

Pregunta 3

Pregunta
FMEA is a risk management method in the product development process. Can you define it?
Respuesta
  • FMEA := Falsification Method in Engineering Analytics
  • FMEA := Failure Method in Engineering Analysis
  • FMEA := Failure Mode and Effect Analysis
  • FMEA := Failure Method and Effect Analytics

Pregunta 4

Pregunta
Within the FMEA method, the calculation and evaluation of the RPN (Risk Priority Number) is crucial. Are you able to check if the following statements are true (or false)?
Respuesta
  • RPN helps the responsible risk management team to prioritize risks.
  • RPN is calculated by multiplying Severity (S), Occurrence (O), and Detection (D).
  • Severity (S): A high severity ranking indicates severe risk.
  • Occurrence (O): A low occurrence rank reflects high failure occurrence potential.
  • Detection (D): A high detection rank reflects high detection capability.
  • Detection (D): A high detection rank reflects low detection capability.
  • Occurrence (O): A high occurrence rank reflects high failure occurrence potential.
  • Severity (S): A low severity ranking indicates severe risk.
  • The maximum value of RPN is 10x10x10 = 1000.

Pregunta 5

Pregunta
Let's bring risk management to the context of strategical procurement. Can you fill in the missing text?
Respuesta
  • complexity
  • globalization
  • volume
  • politics & laws
Mostrar resumen completo Ocultar resumen completo

Similar

ADIVINANZAS  de  animales...
JL Cadenas
Test Asociado al Reading "Social Network"
Diego Santos
Miguel de Unamuno
Diego Santos
8 Preguntas sobre McDonald's
Diego Santos
Integrales Indefinidas
Rupert012
LA EDAD MEDIA - EDUpunto.com
EDUpunto Por: Ernesto De Frías
Novedades: Mapas Mentales de ExamTime
maya velasquez
Deutsch - B1 - Grammatik - Liste der Verben mit Präpositionen
Sandra PlaGo
Tipos de Texto.
belenogallar
PERLAS ENARM
Omar Nieves
Unit 1. Databases and electronic libraries for English Studies
mgr UNED