Pregunta 1

Pregunta
Risk diversification is an important strategy to handle risks: Can you fill in the right terms?
Respuesta
  • shift
  • avoid
  • endure
  • reduce
  • endure
  • avoid
  • shift
  • reduce
  • competitive
  • compensation
  • cooperative
  • internal
  • insurance
  • inacceptable
  • enhance
  • endure
  • extrapolate
  • reinforcements
  • recalls
  • reserves

Pregunta 2

Pregunta
We divide risk measurement into "quantitative" and "qualitative" methods. Can you fill in the right terms?
Respuesta
  • minimum loss
  • maximum loss
  • variation of loss
  • value at risk
  • estimation
  • quick and dirty
  • scoring model

Pregunta 3

Pregunta
FMEA is a risk management method in the product development process. Can you define it?
Respuesta
  • FMEA := Falsification Method in Engineering Analytics
  • FMEA := Failure Method in Engineering Analysis
  • FMEA := Failure Mode and Effect Analysis
  • FMEA := Failure Method and Effect Analytics

Pregunta 4

Pregunta
Within the FMEA method, the calculation and evaluation of the RPN (Risk Priority Number) is crucial. Are you able to check if the following statements are true (or false)?
Respuesta
  • RPN helps the responsible risk management team to prioritize risks.
  • RPN is calculated by multiplying Severity (S), Occurrence (O), and Detection (D).
  • Severity (S): A high severity ranking indicates severe risk.
  • Occurrence (O): A low occurrence rank reflects high failure occurrence potential.
  • Detection (D): A high detection rank reflects high detection capability.
  • Detection (D): A high detection rank reflects low detection capability.
  • Occurrence (O): A high occurrence rank reflects high failure occurrence potential.
  • Severity (S): A low severity ranking indicates severe risk.
  • The maximum value of RPN is 10x10x10 = 1000.

Pregunta 5

Pregunta
Let's bring risk management to the context of strategical procurement. Can you fill in the missing text?
Respuesta
  • complexity
  • globalization
  • volume
  • politics & laws
Mostrar resumen completo Ocultar resumen completo

Similar

Test sobre la Organización del Estado de Los Reyes Católicos
maya velasquez
Paisajes de España
Joaquín Ruiz Abellán
Preguntas exámenes Antropología
Lenah Sanz
DERECHOS DE AUTOR EN INTERNET
valeavenita
Práctica de Biología para la Prepa 1
Raúl Fox
Apuntes con Preguntas de Pensamiento Matemático
Raúl Fox
Libros Recomendados
Diego Santos
Teoría de la Sintaxis
maya velasquez
Mapa Mental Estructura gramatical presente simple inglés
JOWANI BELLO MELO
Etapas de la Historia de España
Alba B