Pregunta 1

Pregunta
Which Air Force instruction (AFI) provides additional information on requirements approval documents (RAD)?
Respuesta
  • AFI 63–101.
  • AFI 63–104.
  • AFI 63–138.
  • AFI 64–101.

Pregunta 2

Pregunta
Which Defense Federal Acquisition Regulation (DFARS) part governs commercial item determination (CID)?
Respuesta
  • DFARS Part 212.
  • DFARS Part 213.
  • DFARS Part 233.
  • DFARS Part 242.

Pregunta 3

Pregunta
Above what price threshold should one conduct a commercial item determination (CID)?
Respuesta
  • $250,000.
  • $500,000.
  • $1 million.
  • $6.5 million.

Pregunta 4

Pregunta
For small business set asides, what percentage of the cost to manufacture a particular product is the prime contractor required to cover?
Respuesta
  • 30 percent.
  • 50 percent.
  • 75 percent.
  • 100 percent.

Pregunta 5

Pregunta
When the total cost of the contract is below $10 million, when do you create an acquisition plan?
Respuesta
  • During routine buys.
  • When there are no incentives to be included.
  • When the acquisition was well researched and there is minimal risk to award and completion.
  • Where there is a history of protests or performance problems.

Pregunta 6

Pregunta
Who is responsible for managing the quality assurance surveillance plan (QASP) quality controls?
Respuesta
  • Customer.
  • Contractor.
  • Contracting office.
  • Contracting officer representative.

Pregunta 7

Pregunta
What part of the quality assurance surveillance plan (QASP) lists performance objectives and standards that must be performed by the contractor?
Respuesta
  • Surveillance matrix.
  • Sampling guide.
  • Decision tables.
  • Checklists.

Pregunta 8

Pregunta
When developing the request for proposal (RFP), the Department of Defense (DOD) source selection procedures are required for
Respuesta
  • orders under multiple award contracts.
  • acquisitions using Federal Acquisition Regulation (FAR) Part 13.
  • acquisitions using FAR Part 15.
  • architect and engineer services solicited and awarded using FAR Part 36.

Pregunta 9

Pregunta
The lowest price technically acceptable (LPTA) source selection method
Respuesta
  • permits the use of tradeoffs between price and nonprice factors.
  • may include nonprice factors such as technical and past performance.
  • allows the government to accept other than the lowest priced proposal.
  • requires the relative importance of all evaluation factors to be identified in the solicitation.

Pregunta 10

Pregunta
Which section of a request for proposal (RFP) provides offerors with instructions for proposal preparation?
Respuesta
  • Section C.
  • Section K.
  • Section L.
  • Section M.

Pregunta 11

Pregunta
What action must be taken if a proposal exceeds established page limitations stated in the solicitation?
Respuesta
  • Determine the contractor non-responsive.
  • Eliminate the offeror from the competitive range.
  • Remove pages in excess of the maximum allowed from the back of the proposal.
  • Accept the proposal “as is” only if determined to be one of the most highly rated proposals.

Pregunta 12

Pregunta
Solicitation evaluation factors are used to distinguish one proposal from another by
Respuesta
  • using discriminators.
  • using non-commercial specifications.
  • including as many evaluation factors as possible.
  • tailoring the evaluation criteria contained in Section K.

Pregunta 13

Pregunta
Lowest price technically acceptable (LPTA) source selections are evaluated according to
Respuesta
  • price only.
  • the acceptability of a product or service only.
  • the acceptability of non-price evaluation factors or subfactors.
  • the rankings of non-price factor/subfactors and the acceptability of a product or service.

Pregunta 14

Pregunta
A proposal that meets requirements and indicates an exceptional approach and understanding of the requirements is given which rating?
Respuesta
  • Good.
  • Marginal.
  • Outstanding.
  • Acceptable.

Pregunta 15

Pregunta
One common aspect of past performance relevancy is
Respuesta
  • the number of contracts performed.
  • financial condition.
  • small business type.
  • dollar value.

Pregunta 16

Pregunta
When considering how many D type contracts to award from one request for proposal (RFP), the contracting officer should consider the
Respuesta
  • total cost of the contract.
  • small business type of the contractors.
  • expected duration and frequency of the task or delivery orders.
  • ability to alleviate competition among the awardees throughout the contract’s period of performance.

Pregunta 17

Pregunta
Which method is a preferred technique in support of price analysis?
Respuesta
  • Comparison of proposed price received in response to the solicitation.
  • Analysis of data other than certified cost or pricing data provided by the offeror.
  • Comparison with competitive published price lists.
  • Use of weighted guidelines.

Pregunta 18

Pregunta
Which factor affects comparability during price analysis?
Respuesta
  • Type of funding being used.
  • Differences in quantities or size.
  • Use of federal supply schedules.
  • Differences in contractor business size.

Pregunta 19

Pregunta
Technical analysis of offeror proposals should
Respuesta
  • analyze each offeror’s profit margin.
  • only be conducted by the contract officer.
  • review each offeror’s experience on similar projects.
  • examine the types and quantities of materials proposed.

Pregunta 20

Pregunta
Communications between the government and contractors are held after receipt of proposals to
Respuesta
  • negotiate prices with only those offerors who are in the competitive range.
  • determine whether or not a proposal should be placed in the competitive range.
  • identify proposal deficiencies and allow offerors to revise its proposal accordingly.
  • discuss aspects of an offeror’s proposal that could, in the opinion of the CO, be altered to materially enhance the proposal’s potential for award.

Pregunta 21

Pregunta
The overall objective of negotiations is to
Respuesta
  • obtain the lowest price possible.
  • never settle on a price that is outside of the government’s minimum and maximum objective.
  • negotiate a contract type with a price providing the greatest incentive for efficient and economical performance.
  • negotiate a contract below what the government believes is reasonable for a particular contract requirement while still allowing the contractor to make a profit.

Pregunta 22

Pregunta
In noncompetitive negotiations, which price position supports the price believed to be most reasonable based on the government’s analysis?
Respuesta
  • Minimum.
  • Objective.
  • Median.
  • Maximum.

Pregunta 23

Pregunta
What profit analysis method assigns values to various profit factors, resulting in a calculated profit objective?
Respuesta
  • Price analysis.
  • Weighted guidelines.
  • Profit application guidelines.
  • Contractor cost/risk analysis.

Pregunta 24

Pregunta
When conducting negotiations, the inability to compromise may be avoided by
Respuesta
  • using concessions to split any differences.
  • threatening to cancel and resolicit the requirement.
  • using other non-price factors to take the focus off price alone.
  • establishing an opening position that allows room to compromise.

Pregunta 25

Pregunta
It may become necessary to walk away from negotiations when
Respuesta
  • a reasonable person would consider it to be a bad deal.
  • the government will exceed its maximum price position.
  • the negotiations begin to exceed a reasonable amount of time.
  • the parties cannot agree on price alone, although it is known that a better deal does not exist.

Pregunta 26

Pregunta
When a deficiency is found in an offeror’s proposal, the government must
Respuesta
  • not further consider the offeror for award.
  • provide suggestions on how to correct the deficiency.
  • identify it and provide the offeror an opportunity to improve the proposal.
  • discuss every aspect of the proposal that received less than the maximum possible rating.

Pregunta 27

Pregunta
What may the contracting officer request during discussions to clarify the offeror’s position for further discussion?
Respuesta
  • Proposal revision.
  • Counteroffer.
  • Revised quote.
  • Determination and finding.

Pregunta 28

Pregunta
When evaluating proposal revisions in a lowest price technically acceptable (LPTA) source selection
Respuesta
  • compare proposals against each other.
  • the government may not request final proposal revisions from any offerors.
  • the evaluation criteria established in the request for proposal (RFP) must be used.
  • the government may only make tradeoffs between cost/price and non-cost/price factors.

Pregunta 29

Pregunta
A comparative analysis must be completed for
Respuesta
  • all offerors.
  • all offerors in the competitive range.
  • only the offerors outside of the competitive range.
  • only the offerors that source selection authority (SSA) has identified.

Pregunta 30

Pregunta
The source selection decision document (SSDD) represents the source selection authority’s
Respuesta
  • independent judgment.
  • dependent judgment.
  • comparative assessment.
  • selection of best value proposal

Pregunta 31

Pregunta
The source selection decision document (SSDD) should
Respuesta
  • be written as a stand-alone document.
  • be signed and posted on the government point of entry (GPE).
  • strictly focus on lowest price and why other offerors were excluded.
  • only identify the factors and subfactors that help sell the authorities’ decision.

Pregunta 32

Pregunta
When preparing an award notice letter, what should be provided?
Respuesta
  • Award amount.
  • Ranking of other proposals.
  • Date of expected notice to proceed.
  • Amount of offerors and the awarded offeror.

Pregunta 33

Pregunta
Within how many days after receipt of a written request should a post-award debriefing be provided to an unsuccessful offeror?
Respuesta
  • 3.
  • 5.
  • 7.
  • 10.

Pregunta 34

Pregunta
Post-award debriefings must include
Respuesta
  • the overall evaluated cost or price and technical ratings of all offerors.
  • the government’s evaluation of the signification weaknesses in the offeror’s proposal.
  • names of individuals providing reference information about the offeror’s past performance.
  • a point by point comparison of the debriefed offeror’s proposal with those of other offerors.

Pregunta 35

Pregunta
Upon completion of a debriefing, offerors must be notified that
Respuesta
  • no further questions are permissible.
  • debriefings may be reopened at the discretion of the contract officer (CO).
  • only the most highly rated offers will be retained for use in future acquisitions.
  • requests for additional information must be submitted in writing with three days after conclusion of the debriefing.

Pregunta 36

Pregunta
If an untimely request for a debriefing was received, a contract officer
Respuesta
  • may decline to provide the debriefing.
  • must limit the debriefing to who received the award and the award amount.
  • must provide a complete debriefing to all offerors who request one regardless of timeliness.
  • is required to provide a debriefing in accordance with the Freedom of Information Act.

Pregunta 37

Pregunta
What may contractors receive when site conditions differ from what was indicated in the specifications and drawings?
Respuesta
  • Time.
  • Money.
  • Time, money or both.
  • Cancelling of the contract.

Pregunta 38

Pregunta
Contractor progress schedules are required
Respuesta
  • for all construction contracts.
  • for only architect and engineering contracts.
  • when contracts exceed the simplified acquisition threshold (SAT) and the performance period is greater than 30 days.
  • when contracts exceed the SAT and the performance period is greater than 60 days.

Pregunta 39

Pregunta
Why is the site visit conducted so quickly after issuing the solicitation?
Respuesta
  • So that interested contractors have time to submit requests for information for clarifications.
  • So that interested contractors have time to submit a protest.
  • Because the site visit is only conducted when contractors request one.
  • Because the site visit allows civil engineering to verify the requirements.

Pregunta 40

Pregunta
What should the contracting officer or contract specialist do when there are discrepancies found during the post-award site visit?
Respuesta
  • Forward them to contracting officer representative or contractor so they can be addressed.
  • Tell the contractor that payment is being withheld.
  • Document the file and address later.
  • Tell the customer.

Pregunta 41

Pregunta
What type of Contractor Performance Assessment Reporting System (CPARS) report is used at the end of the first 12-month option period on a 5-year contract?
Respuesta
  • Final.
  • Interim.
  • Addendum.
  • Annual interim.

Pregunta 42

Pregunta
The Truthful Cost or Pricing Data statue requires contractors to submit cost or pricing data when the procurement is expected to be valued over
Respuesta
  • the simplified acquisition threshold.
  • $750,000.
  • $2 million.
  • the micro purchase threshold.

Pregunta 43

Pregunta
Certification of cost or pricing data states that
Respuesta
  • to the best of the contractor’s knowledge, the cost or pricing data is accurate and complete at the date of the agreement.
  • to the best of the contractor’s knowledge, the cost or pricing data is verified by the suppliers.
  • the contractor agrees to the cost or price of the contract.
  • the contractor’s estimates of cost or pricing data is correct.

Pregunta 44

Pregunta
What type of change improperly exceeds the scope of a procurement and is one which could not have been reasonably anticipated by offerors?
Respuesta
  • Cardinal change.
  • Unilateral change.
  • Restrictive change.
  • Constructive change.

Pregunta 45

Pregunta
A contractor is required to certify any claim
Respuesta
  • exceeding the micro-purchase threshold.
  • exceeding $100,000.
  • exceeding $1,000,000.
  • when the contract is subject to the Truthful Cost or Pricing Data statue.

Pregunta 46

Pregunta
What Air Force instruction (AFI) governs the use of the government purchase card (GPC)?
Respuesta
  • AFI 64–105.
  • AFI 64–102.
  • AFI 64–117.
  • AFI 36–2903.

Pregunta 47

Pregunta
The agency/organization program coordinator (A/OPC) is responsible for
Respuesta
  • for oversight of all cardholders under his or her control.
  • initiating government purchase card (GPC) accounts, issuing delegation letters, and providing mandatory training.
  • staying aware of GPC rules, following those rules, and making purchases within their limits.
  • providing training, distributing cards, replacing lost or stolen cards, and providing customer service.

Pregunta 48

Pregunta
Which is not one of the phases of strategic sourcing?
Respuesta
  • Standup phase.
  • Execution phase.
  • Source selection strategy phase.
  • Management performance phase.

Pregunta 49

Pregunta
What strategic sourcing tool assesses data such as money spent, type of contracts used, size of purchase, item(s) purchased, and so forth?
Respuesta
  • Cost analysis.
  • Price analysis.
  • Spend analysis.
  • Portfolio management.

Pregunta 50

Pregunta
Two-step sealed bidding is especially useful in
Respuesta
  • contracts that have a short lead time and need to be award quickly.
  • acquisitions requiring complex technical proposals.
  • cost-plus-fixed fee contracts.
  • construction contracts.

Pregunta 51

Pregunta
One condition why two-step sealed bidding may be used in preference to negotiations is when
Respuesta
  • definite criteria exist for evaluating technical proposals.
  • only one technically qualified source is expected to be available.
  • there is not sufficient time available for use of the two-step sealed bidding method.
  • a cost-reimbursement contract will be used.

Pregunta 52

Pregunta
The purpose of contract financing is to
Respuesta
  • assist the contractor in paying costs incurred during the performance of the contract.
  • assist the contractor in getting their business started.
  • help the contractor with lease or rental payments.
  • help the contractor with the cost-type contract.

Pregunta 53

Pregunta
Which is a type of noncommercial contract financing payment?
Respuesta
  • Lien.
  • Letter of credit.
  • Loan guarantees.
  • Progress payments based on insurance.

Pregunta 54

Pregunta
Commercial advance and interim payments may be made when the
Respuesta
  • form of contract financing is in the best interest of the contractor.
  • contract item being financed is a commercial supply or service.
  • contract being awarded is under sole-source procedures.
  • contract price is below the SAT.

Pregunta 55

Pregunta
What type of financing has the least amount of risk to the government?
Respuesta
  • Advance.
  • Private.
  • Partial
  • Cost.

Pregunta 56

Pregunta
Which task falls under contract support integration?
Respuesta
  • Planning, validating and prioritizing requirements.
  • Contracting support planning and coordinating common contracting actions.
  • Translating requirements into contract terms, and developing, soliciting, executing, and closing out contracts.
  • Planning contractor management, preparing for contractor deployment, deploying or redeploying contractors.

Pregunta 57

Pregunta
Which is Phase III of the operational phase?
Respuesta
  • Deter.
  • Stabilize
  • Dominate.
  • Reinforce.

Pregunta 58

Pregunta
What is the purpose of the Joint Requirements Review Board (JRRB)?
Respuesta
  • Review, validate, approve, and prioritize contract support requirements.
  • Ensure contract support actions support the joint force commanders command guidance.
  • Maximize contracting capabilities while minimizing the competition for limited vendor capabilities.
  • Ensure that contracting and other related logistics efforts are properly coordinated across the entire area of responsibility.

Pregunta 59

Pregunta
International agreements between two or more governments that address various privileges, immunities, and responsibilities and enumerate the rights and responsibilities of individual members of a deployed force are known as
Respuesta
  • status of forces agreements (SOFA).
  • law of armed conflict (LOAC).
  • wartime agreements.
  • host nation laws.

Pregunta 60

Pregunta
Contractors authorized to accompany the force (CAAF)
Respuesta
  • is a term given to describe local national contractors.
  • is a term used to describe all Department of Defense civilian contractors no matter the location.
  • is a term given to describe local national contractors and third country nationals.
  • are contractor employees who are authorized to accompany the force in applicable foreign contingency operations.

Pregunta 61

Pregunta
Contractors authorized to accompany the force (CAAF) are
Respuesta
  • subject to all local laws, regardless of status.
  • exempt from all host nation laws during a contingency.
  • exempt from all laws in a contingency environment unless stated in the contract.
  • subject to local laws unless specifically exempted by Status of Forces Agreements (SOFA) security agreements.

Pregunta 62

Pregunta
What is a major element of the air expeditionary force (AEF) structure?
Respuesta
  • Deployment force.
  • Noninstitutional force.
  • Expeditionary force.
  • Readily available force.

Pregunta 63

Pregunta
What is the purpose of the reclama process?
Respuesta
  • To request relief from the deployment tasking by asking the authority to reconsider its decision.
  • To guarantee that the unit will be relieved from the deployment tasking.
  • To ensure a unit will not be tasked with a deployment.
  • To ensure the commander can control if his or her Airmen can deploy.

Pregunta 64

Pregunta
When should the contracting officer conduct the mission brief?
Respuesta
  • As soon as possible.
  • Once you have your office established.
  • Once the rest of your staff arrive on location.
  • Once the deployed commander seeks you out and asks for one.

Pregunta 65

Pregunta
Who is the second person to receive contract authority?
Respuesta
  • Senior contracting official (SCO).
  • Secretary of Defense (SecDef).
  • President.
  • Head of contracting authority (HCA).

Pregunta 66

Pregunta
Which form explicitly documents a contracting officer’s warrant?
Respuesta
  • Standard Form (SF) 1400.
  • SF 1401.
  • SF 1402.
  • SF 1403.

Pregunta 67

Pregunta
Which of the following is a main contracting-related option?
Respuesta
  • Defense Contract Management Agency.
  • Functional Contracting Command.
  • Defense Logistics Agency.
  • Lead service component responsible for theater support contracting.

Pregunta 68

Pregunta
Which contracting-related organizational structure is best suited for long-term missions and missions beyond the capability of a single service?
Respuesta
  • Service component support to own forces.
  • Geographic contracting command (GCC).
  • Joint theater support contracting command (JTSCC).
  • Lead service component responsible for theater support contracting.

Pregunta 69

Pregunta
Which type of funds will a contingency contracting officer (CCO) mainly use?
Respuesta
  • Procurement.
  • Military construction (MILCON).
  • Operations and maintenance (O&M).
  • Morale, welfare, and recreation (MWR)/non-appropriated funds (NAF).

Pregunta 70

Pregunta
The primary goal of Defense Base Act insurance is to cover
Respuesta
  • workers on military bases outside the United States.
  • workers on military bases outside and inside the United States.
  • military personnel on military bases outside the United States.
  • military personnel on coalition bases outside the United States.

Pregunta 71

Pregunta
Which regulation(s) cover expedited contracting procedures?
Respuesta
  • Air Force Instruction (AFI) 64–105.
  • AFI 64–102.
  • Federal Acquisition Regulation (FAR) Part 18.
  • FAR Part 18 and Defense Federal Acquisition Regulation Supplement (DFARS) Part 218.

Pregunta 72

Pregunta
Who normally fulfills the field ordering officer (FOO) role?
Respuesta
  • Army soldiers.
  • Resource advisors (RA).
  • Contracting officers (CO).
  • Contracting officer representatives (COR).

Pregunta 73

Pregunta
Who appoints field ordering officers (FOO)?
Respuesta
  • Contractor chief executives.
  • Squadron commanders.
  • Contingency contracting officers (CCO).
  • Contracting officer representatives (COR).

Pregunta 74

Pregunta
What must field ordering officers (FOO) maintain when keeping track of their purchases?
Respuesta
  • Copy of the purchase request document.
  • Copy of purchase receipt.
  • Appointment letter.
  • Standard Forms 44.

Pregunta 75

Pregunta
Which is a field ordering officer (FOO) violation?
Respuesta
  • Authorized commitments.
  • Purchases at authorized limits.
  • Purchases outside the purpose of the appropriated funds.
  • Ensuring competition in contracting act requirements (CICA) are met.

Pregunta 76

Pregunta
Who is responsible for determining contractors authorized to augment the force (CAAF)/non-CAAF status?
Respuesta
  • Contracting officer (CO).
  • Contract specialist.
  • Host-nation liaison.
  • Base commander.

Pregunta 77

Pregunta
In-theater management of contractor personnel is maintained in
Respuesta
  • security forces.
  • System for Award Management (SAM).
  • Defense Biometric Identification System (DBIDS).
  • Synchronized predeployment operational tracker (SPOT).

Pregunta 78

Pregunta
Which is a tool that a contingency contracting officer (CCO) can use to research an area of responsibility (AOR)?
Respuesta
  • Comprehensive emergency management plan (CEMP).
  • Lessons learned plan.
  • Physically flying to the location.
  • The respective combatant command (CCMD) operational contract support integration cell (OCSIC).

Pregunta 79

Pregunta
What is a category of defense support of civil authorities (DSCA)?
Respuesta
  • Undesignated law enforcement support.
  • International emergencies.
  • Domestic emergencies.
  • Space activities.

Pregunta 80

Pregunta
Humanitarian assistance is the Department of Defense (DOD) term
Respuesta
  • for relief and development activities that take place in the context of an overseas military exercise, training event, or operation.
  • for domestic emergencies that affect the public welfare, endanger life and property, or disrupt the usual process of government.
  • that allows the DOD to provide aid whenever a military accident happens on a DOD installation.
  • that authorizes the DOD to help state and local governments alleviate the suffering and damage caused by disasters.

Pregunta 81

Pregunta
Which act authorizes the federal government to help state and local governments alleviate the suffering and damage caused by disasters?
Respuesta
  • Disaster Relief Act of 1974.
  • Department of Defense Disaster Response Act.
  • Overseas Humanitarian, Disaster and Civic Aid Act (OHDACA).
  • Robert T. Stafford Disaster Relief and Emergency Assistance Act.

Pregunta 82

Pregunta
If unable to exercise contingency contracting officer (CCO) skills in a base exercise, who prepares CCOs with unit specific exercises?
Respuesta
  • Contracting commander.
  • Unit training manager. (UTM).
  • Unit deployment manager. (UDM.)
  • Installation’s wing inspection team (WIT).
Mostrar resumen completo Ocultar resumen completo

Similar

4 Types of Resources
Olivia t
Rationality Assumption: "Homo Economicus" (Ch 1)
Olivia t
QBO Chapter 7 Key Terms
Joel Johnson
QBO Chapter 9 important terms
Joel Johnson
Chapter 6 Key Words
Joel Johnson
Chapter 7 Key Words
Joel Johnson
Chapter 9 Key Words
Joel Johnson
Chapter 13 Key Words
Joel Johnson
Chapter One Quiz
Olivia t
Chapter One Economics:
Olivia t
Chapter 3 Vocabulary Terms- Micro
Olivia t