Principles of Organising, Planning and Pricing Construction Work

Descripción

Exam 6705-301
philippa.ramage
Test por philippa.ramage, actualizado hace más de 1 año
philippa.ramage
Creado por philippa.ramage hace alrededor de 9 años
229
1

Resumen del Recurso

Pregunta 1

Pregunta
An advantage of using CAD programs, over traditional hand drawing methods is that
Respuesta
  • no training is required
  • a printer is not required
  • hardware is inexpensive
  • they can be altered quickly

Pregunta 2

Pregunta
Which of the following is true about traditional hand produced drawings compared to using a CAD package?
Respuesta
  • Initial set up costs are high
  • Drawings are more accurate
  • Editing can take longer
  • Drawings can be produced quicker

Pregunta 3

Pregunta
Which one of the following projection types is most likely to show room dimensions for a house?
Respuesta
  • Isometric
  • Axonometric
  • Photographic
  • Orthographic

Pregunta 4

Pregunta
Orthographic projections are required when applying for
Respuesta
  • a permit to work
  • labour contracts
  • Building Regulations Approval
  • Construction Regulations Approval

Pregunta 5

Pregunta
Door and window schedules can be produced from a
Respuesta
  • table
  • drawing
  • programme
  • specification

Pregunta 6

Pregunta
Isometric drawings show objects in
Respuesta
  • two dimension
  • three dimension
  • two point perspective
  • three point perspective

Pregunta 7

Pregunta
A 30° / 60° set square is required to draw an
Respuesta
  • elliptical axis
  • isometric axis
  • elevational axis
  • orthographic axis

Pregunta 8

Pregunta
Which of the following is the most suitable thermal insulating material for a conservatory roof?
Respuesta
  • Perspex
  • Double glazing
  • Twin wall plastic
  • Polyisocyanurate

Pregunta 9

Pregunta
Whish one of the following thermal insulation materials can be cut with a pair of scissors and fixed with a staple gun?
Respuesta
  • Multi foil
  • Mineral wool
  • Polyvinyl butyl
  • Polyisocyanurate

Pregunta 10

Pregunta
Insulation is positioned within a brick cavity wall to
Respuesta
  • prevent damp rising
  • minimise capillary attraction
  • conform to fire safety legislation
  • conform to building regulations

Pregunta 11

Pregunta
When insulation is inserted between the rafters in a roof, care must be taken to ensure air flow is
Respuesta
  • limited
  • adjustable
  • prevented
  • maintained

Pregunta 12

Pregunta
Whish of the following walling construction methods has the best thermal value?
Respuesta
  • Stone
  • Concrete
  • Timber frame
  • Solid brick work

Pregunta 13

Pregunta
Energy's certificate rating A-G determine a building's
Respuesta
  • water usage
  • gas pressure
  • thermal efficiency
  • electrical resistance

Pregunta 14

Pregunta
When timber is imported into the United Kingdom it must be from
Respuesta
  • Europe
  • America
  • a local source
  • a managed source

Pregunta 15

Pregunta
What are sustainable materials?
Respuesta
  • Materials that do not destroy or deplete natural resources
  • Materials made only of timber
  • Materials that do not contain any plastic
  • Materials that are manufactured from recycled materials only

Pregunta 16

Pregunta
Which of the following formula's is used for calculating the area of a wall?
Respuesta
  • L x H
  • L x H³
  • L ÷ H³
  • L ÷ H

Pregunta 17

Pregunta
Which formula is used to find the area of a circular platform?
Respuesta
  • π r² v²
  • π dh
  • 4/3 π r³
  • M 1/3 π r²h

Pregunta 18

Pregunta
Which of the following are both shown on a schedule?
Respuesta
  • Location and size
  • Tools and position
  • Density and porosity
  • Joint size and adhesive

Pregunta 19

Pregunta
When ordering supplies, an approved supplier list would be used, as they have proved in the past to be
Respuesta
  • friendly
  • reliable
  • expensive
  • available

Pregunta 20

Pregunta
A contract would be priced up using the drawings and the
Respuesta
  • bill of quantities
  • requisition sheet
  • contract for payment
  • contract specification

Pregunta 21

Pregunta
A client would put a contract out to tender in order to compare
Respuesta
  • specifications
  • bill of quantities
  • installation details
  • competitive prices

Pregunta 22

Pregunta
A quote would give the client
Respuesta
  • the cost of the preambles
  • a variable price for the job
  • a bid for the work to be done
  • the cost for the work to be carried out

Pregunta 23

Pregunta
An estimate will give the client
Respuesta
  • a cost for all the labour required
  • an exact cost for the complete job
  • a cost for all the materials required
  • an approximate cost for the complete job

Pregunta 24

Pregunta
2600 m² of wall tiles are required for a contract. How many additional wall tiles need to be ordered when allowing 10% waste?
Respuesta
  • 250 m²
  • 260 m²
  • 2610 m²
  • 2860 m²

Pregunta 25

Pregunta
Which of the following both need to be considered when preparing a quote?
Respuesta
  • Labour and receipts
  • Labour and invoices
  • Labour and hoarding costs
  • Labour and operational costs

Pregunta 26

Pregunta
The benefit of using a Gantt chart is to show the planning of which of the following?
Respuesta
  • Labour and plant
  • Size and type of flooring
  • Colour and type of paint
  • Labour and drawings

Pregunta 27

Pregunta
The lead times required for ordering materials are planned by using a
Respuesta
  • schedule
  • specification
  • bill of quantities
  • method statement

Pregunta 28

Pregunta
Which one of the following is an advantage of purchasing plant compared to hiring it?
Respuesta
  • Maintenance costs are reduced
  • It is less expensive in the long term
  • No additional purchases are required
  • Portable appliance testing is not required

Pregunta 29

Pregunta
Which one of the following is an advantage of hiring equipment?
Respuesta
  • It is available at any time
  • Costs are reduced in the long term
  • It can be kept at the end of a contract
  • Spare parts do not have to be purchased

Pregunta 30

Pregunta
Which one of the following is not a planning method used in construction?
Respuesta
  • Gantt chart
  • Bill of quantities
  • Programme of work
  • Critical path analysis

Pregunta 31

Pregunta
Which one of the following are all required pieces of information to produce a Gantt chart?
Respuesta
  • Start date, end date and labour required
  • Delivery dates, specifications and bill of quantities
  • Labour required, meeting agenda and bill of quantities
  • Planned activities, meeting agenda and plant required

Pregunta 32

Pregunta
Which one of the following documents is used to record action points of a meeting?
Respuesta
  • A diary
  • An agenda
  • The memos
  • The minutes

Pregunta 33

Pregunta
A hot works permit is required when
Respuesta
  • work is carried out in a kitchen
  • working in air-conditioned rooms
  • work is carried out that generates heat
  • working in confined spaces underground

Pregunta 34

Pregunta
An instruction from an Architect to make changes to work would be made
Respuesta
  • in a diary
  • on an agenda
  • on a delivery note
  • in a variation order

Pregunta 35

Pregunta
Which one of the following documents contains information including attendees, apologies and dates?
Respuesta
  • Diary
  • Agenda
  • Calendar
  • Schedule

Pregunta 36

Pregunta
Information about site access would be included during
Respuesta
  • an induction
  • a toolbox talk
  • in a safety meeting
  • an extended meeting

Pregunta 37

Pregunta
Safety updates and changes to working hours would be discussed during
Respuesta
  • an induction
  • a toolbox talk
  • a safety meeting
  • an extension meeting

Pregunta 38

Pregunta
Binding doors and damaged paintwork found at the end of a contract, would be identified during a
Respuesta
  • land survey
  • toolbox talk
  • motion study
  • defects survey

Pregunta 39

Pregunta
Which of the following information, other than faults found, is included on a defects schedule?
Respuesta
  • Programme
  • Specification
  • Remedial action
  • Contract start date

Pregunta 40

Pregunta
Which one of the following is required when querying an incorrect delivery of timber?
Respuesta
  • Total cost
  • Order number
  • Quality of timber
  • Timber supplier
Mostrar resumen completo Ocultar resumen completo

Similar

Test de Matemáticas
Diego Santos
Factorización
Nancy Guzman
Freud: Pasión Secreta
Cesar_Adolfo
Campo magnético
Diego Santos
Expresiones en inglés
maya velasquez
Sumas y restas MATEMATICAS (Preguntas fáciles)
RosyFlower Suchard
Tipos de Fracciones
lesly.ladron
Mapa Conceptual
Laura Laguna
Elaboración de mapas mentales
ortenzias
LAS PLANTAS
Red Mist
TUBERCULOSIS
Mary Coronel