Which of the following items is part of a team charter, developed in the Define step?
Respuesta
  • The solution
  • The root cause
  • A Problem / Goal Statement

Pregunta 2

Pregunta
Which of the following techniques is most likely to help you in the first step within Improve where you are identifying all potential solutions?
Respuesta
  • Priority based matrix
  • Paired comparisons
  • Random Words

Pregunta 3

Pregunta
You have been asked to measure the queuing time for customers at the branch of a bank. Which of the following sampling options will be most appropriate.?
Respuesta
  • Measure all day, every day for the first week of the next month
  • Measure each morning every day for the first two weeks of the next month
  • Measure for a period of 10 minutes in every hour for the next month

Pregunta 4

Pregunta
Which of the following is a measure of process capability?
Respuesta
  • FMEA
  • QFD
  • Cp

Pregunta 5

Pregunta
If the team fails to spend time in the Control phase of DMAIC which of these is most likely to occur?
Respuesta
  • The team will have the wrong composition
  • The process improvement will not be maintained
  • The wrong root cause will be identified

Pregunta 6

Pregunta
Which of the following tools would be most appropriate to display ongoing cycle time performance in the credit dispatch process?
Respuesta
  • Scatter diagram
  • Histogram
  • Pareto
  • X-moving R control chart

Pregunta 7

Pregunta
If a process is in statistical control:
Respuesta
  • It is meeting the CTQs
  • It is stable and predictable
  • There are special causes present

Pregunta 8

Pregunta
The stakeholder analysis
Respuesta
  • Is used mainly in the Define phase
  • Is used mainly in the Measure phase
  • Is used mainly in the Improve phase
  • Should be reviewed throughout the project and updated accordingly

Pregunta 9

Pregunta
Guage R and R stands for:
Respuesta
  • Roles and Responsibilities
  • Repeatability and Reproducibility
  • Rolls Royce
  • Reliability and Regularity

Pregunta 10

Pregunta
We set the control limits around +/-3 standard deviations because:
Respuesta
  • 99.73 of data will fall within this so it is unlikely a point will naturally fall outside
  • Operating at three sigma is good enough for most processes
  • Motorolla identified a 1.5 sigma shift in either direction.

Pregunta 11

Pregunta
Using the XmR Control Charts, calculate the control limits for X, where the mean of the first 20 data points is 25, and the mean for the moving range is 3.5. Give your answer rounded to 2 decimal places. Please use this format 00.00 UCLx = [blank_start]34.31[blank_end]
Respuesta
  • 34.31

Pregunta 12

Pregunta
Using the XmR Control Charts, calculate the control limits for X, where the mean of the first 20 data points is 25, and the mean for the moving range is 3.5. Give your answer rounded to 2 decimal places. Please use this format 00.00 LCLx = [blank_start]15.69[blank_end]
Respuesta
  • 15.69

Pregunta 13

Pregunta
The difference between defects and defectives is:
Respuesta
  • There is no difference
  • A defect identifies a failure to meet a CTQ whereas a defective identifies a unit which may contain several defects
  • A defect is an error made by us whereas a defective is an error made by the customer

Pregunta 14

Pregunta
If you have a severity rating of 6, an occurrence rating of 5 and a detection rating of 6, what is your RPN? RPN = [blank_start]180[blank_end]
Respuesta
  • 180

Pregunta 15

Pregunta
The key output of Analyse is:
Respuesta
  • A solution to the problem
  • The vital few root causes
  • A response plan

Pregunta 16

Pregunta
One use of sigma measures is to:
Respuesta
  • Understand if there is a correlation between the X and the Y
  • Understand how well different processes perform
  • Identify the type of variation in the process

Pregunta 17

Pregunta
Which of the following steps are Customer value added (identify all)?
Respuesta
  • Take order
  • Transfer order onto suppliers database
  • Check the address is correct
  • Ring the customer to obtain missing information
  • Deliver order
  • Copy the signed order to accounts

Pregunta 18

Pregunta
Gauge R and R is:
Respuesta
  • A way of predicting what will go wrong with a project
  • An indicator of measure system reliability
  • The method used to determine R squared

Pregunta 19

Pregunta
Continuous data:
Respuesta
  • is less data rich than attribute data
  • Will need a smaller sample size than attribute data
  • Cannot be used in a scatter diagram

Pregunta 20

Pregunta
Calculate the sigma value for the following process where: The number of units process is 250, the number of defects is 106 and there are 2 defect opportunities per unit. (Answer to 1 decimal point) Sigma Value = [blank_start]2.3[blank_end]
Respuesta
  • 2.3

Pregunta 21

Pregunta
What is the mean of this data set: ( 3, 5, 7, 18, 11, 6, 18, 6, 12, 8) Please use the format 0.0 Mean = [blank_start]9.4[blank_end]
Respuesta
  • 9.4

Pregunta 22

Pregunta
An Xbar R chart is used:
Respuesta
  • For attribute data
  • For data with varying sample sizes plus the range
  • For plotting the means and ranges of subgrouped samples

Pregunta 23

Pregunta
The most important CTQs are derived from:
Respuesta
  • Your manager or team leader
  • Last years performance + 10%
  • Beating your competitors performance
  • The external customer

Pregunta 24

Pregunta
The correlation co-efficient:
Respuesta
  • Helps validate your ideas about the vital few root causes
  • Identified the difference between the performance in 2 teams
  • Confirms whether an improvement initiative has worked
  • Is either zero or a positive number

Pregunta 25

Pregunta
A full factoral experiment with 2 levels and 5 factors will require? Number of runs = [blank_start]32[blank_end]
Respuesta
  • 32

Pregunta 26

Pregunta
A process has been analysed and the temperature measured with a mean of 104.5. The upper control limit is 131 and the lower control limit is 76. The process is in control. Assuming the CTQ is a temperature range between 68 and 130 – how would you describe the “state of the process”?
Respuesta
  • Ideal (meets CTQ and in control)
  • Threshold (not meeting the CTQ and in control)
  • On the brink (meeting the CTQ but out of control)
  • Chaos (not meeting CTQ and out of control)

Pregunta 27

Pregunta
Which of the following would usually indicate natural (common cause) variation?
Respuesta
  • A point outside the control limits
  • An increasing trend over time
  • Usual small variations in data between the control limits

Pregunta 28

Pregunta
Which of the following is a continuous measure?
Respuesta
  • Day of the week a service is completed
  • The type of defect
  • Cycle time to complete the service

Pregunta 29

Pregunta
Scope creep is often a problem with projects. Which of these tools would NOT help manage it?
Respuesta
  • Tollgate reviews
  • SIPOC
  • ANOVA
  • In/Out of Frame

Pregunta 30

Pregunta
Histograms which two or humps suggest?
Respuesta
  • There is an error in the data collection
  • Segmentation would be useful
  • Data transformation is needed

Pregunta 31

Pregunta
To move our client from dissatisfied to satisfied which of these requirements will be of LEAST importance?
Respuesta
  • Dissatisfiers
  • Satisfiers
  • Delighters

Pregunta 32

Pregunta
When you make a change in a process to improve performance should you expect the process initially to:
Respuesta
  • Stay in control
  • Go out of control

Pregunta 33

Pregunta
In the scatter diagram the vertical axis is:
Respuesta
  • The cause
  • The effect

Pregunta 34

Pregunta
When analyzing Voice of the Customer data to derive CTQs which of the following tools is LEAST likely to be useful?
Respuesta
  • Affinity diagram
  • Tree diagram
  • Kano model
  • Theory of constraints

Pregunta 35

Pregunta
Another way to describe cause and effect is?
Respuesta
  • Y’s and X’s
  • P’s and Q’s
  • X’s and Y’s

Pregunta 36

Pregunta
SIPOC is a clear deliverable of which DMAIC phase (select 1)?
Respuesta
  • Define
  • Measure
  • Analyse
  • Improve
  • Control

Pregunta 37

Pregunta
A display of data in a time sequence is called?
Respuesta
  • A histogram
  • A pie chart
  • A run chart
  • A scatter diagram

Pregunta 38

Pregunta
Histograms are used to:
Respuesta
  • Display the distribution of historical process data
  • Identify special cause variation
  • Display a time series plot

Pregunta 39

Pregunta
CTQs should be expressed in a format that?
Respuesta
  • Is clearly measurable
  • Contains the solution
  • Represents the voice of the process

Pregunta 40

Pregunta
The Risk Priority Number applies to:
Respuesta
  • Priority based matrix
  • Force Field analysis
  • Scatter diagram
  • FMEA

Pregunta 41

Pregunta
A sample must be:
Respuesta
  • Representative
  • Large
  • Segmented

Pregunta 42

Pregunta
Poke Yoke is about:
Respuesta
  • Identifying what is important to a customer
  • Inspection
  • Prevention
  • The 80:20 rule

Pregunta 43

Pregunta
The sampling formula n = 2s/dy)² gives a confidence level of:
Respuesta
  • 99%
  • 95%
  • 99.9996%
  • 66%

Pregunta 44

Pregunta
The upper and lower control limits on a control chart are derived from:
Respuesta
  • The customer specification and CTQs
  • The targets set by management
  • The actual process data

Pregunta 45

Pregunta
Which of the following techniques is a form of hypothesis testing?
Respuesta
  • Fishbone
  • R&R
  • ANOVA
  • Pareto

Pregunta 46

Pregunta
Operational Definitions help ensure:
Respuesta
  • Consistent measurement
  • An accurate team charter
  • A comprehensive SIPOC

Pregunta 47

Pregunta
Which of the following statements best describes DPMO?
Respuesta
  • Defects per manufacturing operation and is a lean measure of waste
  • Defects per million opportunities and is a lean measure of value add
  • Defects per manufacturing operation and is often referred to as parts per million
  • Defects per million opportunities and is a six sigma measure of process capability

Pregunta 48

Pregunta
If a company is operating at 2 sigma, what percentage of its customers are experiencing defects?
Respuesta
  • Approx. 10%
  • Approx. 20%
  • Approx. 30%
  • Approx. 70%

Pregunta 49

Pregunta
A process is:
Respuesta
  • A series of steps and actions that produce an output
  • A one of task
  • Only applicable to manufacturing organisations
Mostrar resumen completo Ocultar resumen completo

Similar

The SAT Math test essentials list
lizcortland
How to improve your SAT math score
Brad Hegarty
RE Keywords - Paper 1 - Religion and life
Kerris Linney
IT - The Online World
Summir
Quick tips to improve your Exam Preparation
James Timpson
LOGARITHMS
pelumi opabisi
Flashcards for CPXP exam
Lydia Elliott, Ed.D
History- Home Front WW1
jessmitchell
Revision Timetable
katy.lay
GCSE Biology, Module B4
jessmitchell
Mind Maps with GoConqr
Manikandan Achan