Large quantities of ____ are used to complete the foundations which must support the loads from the boiler and all of the auxillary equipment
Respuesta
steel
refractory
earth
cement
Pregunta 2
Pregunta
Tubes for boiler application are either hot-finished or _______drawn depending on the size, tolerance and finish desired.
Respuesta
cold
hot
mild
rough
Pregunta 3
Pregunta
_________ is used as heat protection for personnel and to stop the loss of heat from the boiler internal sections.
Respuesta
refractory
insulation
cladding
casing
Pregunta 4
Pregunta
Boiler tubes may be fabricated in a _____ form, or they may be welded
Respuesta
rolled
seamless
seamed
cast
Pregunta 5
Pregunta
A final test which is carried out in the manufacturers shop is a hydraulic or hydrostatic test (conducted according to the ASME Code Section I, PW-54) at a pressure of ____times the design pressure
Respuesta
1
2
1.5
5
Pregunta 6
Pregunta
Another method used to produce seamless tubes is known as _______
Respuesta
cold rolling
extrusion
polishing
casting
Pregunta 7
Pregunta
The boiler tubes themselves are used to support the top_____ in a bottom-supported boiler
Respuesta
cover
drum
header
tubes
Pregunta 8
Pregunta
When a manhole opening is made in a drum or shell, the area becomes _____ due to the amount of metal removed
Respuesta
stronger
weaker
flatter
rougher
Pregunta 9
Pregunta
The ASME Code Section ___ Specifies that the size of an elliptical manhole shall not be less than 280 mm by 380 mm or 250 mm by 410 mm.
Respuesta
IV
VII
III
I
Pregunta 10
Pregunta
For pressures up to _____ kPa and temperatures up to 454 deg C, handhole covers with gaskets are used and are bolted into place.