Pregunta 1

Pregunta
In order to avoid scale formation and corrosion in the _____, the make up water for the feedwater supply must be properly treated
Respuesta
  • dearator
  • boiler
  • furnace
  • tank

Pregunta 2

Pregunta
When examining the waterside surfaces, the inspector looks for signs of corrosion, pitting and ________ of the metal.
Respuesta
  • bulging
  • blistering
  • cracking
  • wearing

Pregunta 3

Pregunta
During the high-pressure flush, the blowdown valves should be disconnected, if possible, to prevent them from getting plugged with _________
Respuesta
  • water
  • dirt
  • rust
  • scale

Pregunta 4

Pregunta
Moisture absorbing material should be placed on trays inside the drums to absorb moisture from the ________
Respuesta
  • metal
  • tubes
  • air
  • fuel

Pregunta 5

Pregunta
Inert gas, such as nitrogen, is connected to the drum vent to maintain approximately ______ kpa, positive pressure.
Respuesta
  • 100
  • 35
  • 325
  • 500

Pregunta 6

Pregunta
When the pressure in the boiler steam drum drops to ______kPa, the drum vents are to be opened to avoid the formation of a vacuum within the boiler.
Respuesta
  • 170
  • 500
  • 35
  • 1000

Pregunta 7

Pregunta
Which of the following is not a common cause of furnace explosions
Respuesta
  • failure to purge the furnace adequately before start-up
  • admission of fuel to main burner before pilot flame or other ignition source is established.
  • Loss of id fan
  • attempting to light one burner off other burners, in operation
  • incorrect amount of air supplied to the burner can resulting in incomplete combustion

Pregunta 8

Pregunta
The operator must be familiar with manual operation of the ______system, in case of a system failure
Respuesta
  • generator
  • water
  • control
  • air

Pregunta 9

Pregunta
___________ storage is preferable for boilers that are out of service for an extended period of time or in locations where freezing temperatures.
Respuesta
  • Dry
  • Short
  • Wet
  • Long

Pregunta 10

Pregunta
In order for the gauge glass to show the correct level, all connections to the gauge glass and the water column, must be ______ to ensure they are clear and free from obstructions.
Respuesta
  • tight
  • purged
  • blowndown
  • unblocked
Mostrar resumen completo Ocultar resumen completo

Similar

La Ley de la Gravedad
maya velasquez
Preguntas del Pensamiento Matemático 3
Raúl Fox
MATEMÁTICAS: ARITMÉTICA...
Ulises Yo
Técnicas de Recolección de Datos
Karen Dubón
Should, Must and Have to
Kate Pb
Software
Serena Ercoreca
3 Tipos de Interacciones para la Participación de los Alumnos
Diego Santos
GLÚCIDOS
mariogarcia99
ESTUDIANTE
Omar valeta
Promoción de ventas
VICTOR HUGO ORTIZ ALCALA
Test Estructuras IV: Tipo de estructuras
Pedro Landín